Project overview

S3 Skyrise is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700034944. S3 Skyrise is located at S No 102/26 And 88/13 Of Village Mire And S No 11/1 And 11/2 Of Village Mahajanwadi Taluka And District Thane. This is a New being developed by S3 Smart Spaces Private Limited.

S3 Skyrise has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 209 to 874 Sq.ft. Carpet. The Project has total 191 of which 191 are currently available for sale.

S3 Skyrise is being developed on a total land area of 21689 Sq.ft. S3 Skyrise has 1 Wings / Towers S3 Skyrise

ProjectDeveloperLocationPossession
127 Raj Homes A WingRaj HomesSurvey No./ Hissa No. 49(127)/10,11,1230-09-2025 00:00:00
S3 SkyriseS3 Smart Spaces Private LimitedS No 102/26 And 88/13 Of Village Mire And S No 11/1 And 11/2 Of Village Mahajanwadi Taluka And District Thane31-12-2027 00:00:00
Magic Meera HeightsMagic Star DevelopersS.No 141/2(Old)12/2(New)30-12-2025 00:00:00
127 Raj Homes B And C WingRaj HomesSurvey No./Hissa No.49(127)/10,11,1231-12-2026 00:00:00
127 Raj Homes D WingRaj Homes49(127)1,2,3,5,6,8,10,11,1231-12-2026 00:00:00
Aaradhya Highpark - Project 1 Of Phase IMan Vastucon LlpS. No. 92 - Corresponding New S. No. 13-130-03-2025 00:00:00
Aaradhya Highpark - Project 2 Of Phase IMan Vastucon LlpS. No 92 Corresponding New S. No. 13/130-03-2025 00:00:00
Kasturi BlossomSiddhivinayak EnterpriseOld Survey No. 2131-12-2027 00:00:00
Crescent Wtc (Western Trade Center)Crescent Shelters4152, 4153, 4316, 4351, 4352, 4354, 4355,4356,4357, 4358, 4359, 4360, 4404, 440530-06-2027 00:00:00
Aaradhya Parkwood 1Man Vastucon LlpOld Survey No 260 Part/New Survey No 12 Hissa No 231-12-2028 00:00:00
S3 SkygreensS3 Smart Spaces Private LimitedS No 102/26 And 88/13 Of Village Mire And S No 11/1 Of Village Mahajanwadi Taluka And District Thane30-06-2028 00:00:00
Imperial Heights Phase Ii - C WingAkshar Shanti Realtors Private Limited12/130-12-2026 00:00:00
Avighna Complex Phase IAvighnaa Infra Buildcon LlpNew Survey No 16 Hissa No 1,3,430-06-2026 00:00:00
Shweta HeightsShree Sai AssociatesOld Survey No. 404 / Hissa No. 3, 6 And 9. New Survey No. 176 / Hissa No. 3, 6 And 9.31-03-2026 00:00:00
Ana Avant Garde Phase 1Steelfab Engineering Corporation1335Pt, 1424Pt31-12-2018 00:00:00
Db OzoneNeelkamal Realtors Suburban Private Limited4509 - 4513,4517,4547,4548,4572-4575,4604,4609-4611,4652,4691,469231-12-2019 00:00:00
Westin Darvesh HorizonDarvesh Properties Private LimitedCts No 4398 To 4403 4436 To 4451 4481 4482 4486 To 4508 4540 To 4546 4565 To 4571 4599 To 4603 469930-06-2021 00:00:00
Man OpusMan Global Ltd.S. No. 53/1 Pt,Cts No. 1475,1556-1561,1565-1567,1625,1643,1644,1711-1713,171631-12-2018 00:00:00
Project Details
  • Project:
    S3 Skyrise
  • Location:
  • S No 102/26 And 88/13 Of Village Mire And S No 11/1 And 11/2 Of Village Mahajanwadi Taluka And District Thane
  • Const. Stage:
    New
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    S3 Smart Spaces Private Limited
  • Phone:
  • Address:
  • Dhiraj Chambers
Project RERA Details
MAHA REARA No: P51700034944
Project Type Others
RERA Project Status New
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 Apr 2022
Last Retrived 26 Jul 2025
S3 Skyrise QR Code
S3 Skyrise
MahaRERA - P51700034944
Apartment Details & Configuration
TypeArea
1 BHK38.11 Sq.mts. ( 410 Sq.ft. )
1 BHK38.64 Sq.mts. ( 416 Sq.ft. )
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )
1 BHK40.53 Sq.mts. ( 436 Sq.ft. )
1 BHK40.72 Sq.mts. ( 438 Sq.ft. )
2 BHK49.88 Sq.mts. ( 537 Sq.ft. )
2 BHK55.12 Sq.mts. ( 593 Sq.ft. )
2 BHK55.38 Sq.mts. ( 596 Sq.ft. )
Shop81.18 Sq.mts. ( 874 Sq.ft. )
Shop19.44 Sq.mts. ( 209 Sq.ft. )
Shop19.6 Sq.mts. ( 211 Sq.ft. )
Shop20.39 Sq.mts. ( 219 Sq.ft. )
Shop20.82 Sq.mts. ( 224 Sq.ft. )
Shop21.07 Sq.mts. ( 227 Sq.ft. )
Shop21.27 Sq.mts. ( 229 Sq.ft. )
Shop21.52 Sq.mts. ( 232 Sq.ft. )
Shop21.68 Sq.mts. ( 233 Sq.ft. )
Shop21.91 Sq.mts. ( 236 Sq.ft. )
Shop22.44 Sq.mts. ( 242 Sq.ft. )
Shop23.53 Sq.mts. ( 253 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of S3 Skyriselast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings100% completed
95% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station
---
Energy management
Solar
Fire Protection And Fire Safety Requirements
As Per Cfo Norms
Landscaping & Tree Planting
---
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
---
Solid Waste Management And Disposal
Owc
Storm Water Drains
---
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Stp
Water Conservation, Rain water Harvesting
---
Water Supply
By Mbmc (After Oc)
Buildings / Wings in S3 Skyrise
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of S3 Skyrise by S3 Smart Spaces Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

21689 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

191 apartments in total
Total
191
Booked
0
Available
191

Saleable Area Statistics (Sq. ft.)

89824 Total
Total
89824
Booked
0
Available
89824
Total 191 apartments in project. 0 apartments booked. 0% apartments booked.
Total 89824 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

S3 Skyrise

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
S3 SkyriseDec 20273410220122
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.11 Sq.mts. ( 410 Sq.ft. )23
None Booked0% Booked
0% Booked
1 BHK38.64 Sq.mts. ( 416 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK40.53 Sq.mts. ( 436 Sq.ft. )23
None Booked0% Booked
0% Booked
1 BHK40.72 Sq.mts. ( 438 Sq.ft. )23
None Booked0% Booked
0% Booked
2 BHK49.88 Sq.mts. ( 537 Sq.ft. )23
None Booked0% Booked
0% Booked
2 BHK55.12 Sq.mts. ( 593 Sq.ft. )23
None Booked0% Booked
0% Booked
2 BHK55.38 Sq.mts. ( 596 Sq.ft. )23
None Booked0% Booked
0% Booked
Shop81.18 Sq.mts. ( 874 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.44 Sq.mts. ( 209 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.6 Sq.mts. ( 211 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.39 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.82 Sq.mts. ( 224 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.07 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.27 Sq.mts. ( 229 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.52 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.68 Sq.mts. ( 233 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.91 Sq.mts. ( 236 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.44 Sq.mts. ( 242 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.53 Sq.mts. ( 253 Sq.ft. )1
None Booked0% Booked
0% Booked
191 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building S3 SkyriseCompletion
Basement (if any)
Excavation
work-in-progress95% done
95% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
S3 Smart Spaces Private Limited
for Project
S3 Skyrise
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation