Project overview

Ruparel Vivanza is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900003595. Ruparel Vivanza is located at 1D/716. This is a Ongoing being developed by R R Builders.

Ruparel Vivanza has 1 BHK, 2 BHK, 2.5 BHK, 3 BHK & Shop Apartments with carpet areas ranging from 2048 to 824 Sq.ft. Carpet. The Project has total 619 of which 294 are currently available for sale.

Ruparel Vivanza is being developed on a total land area of 99001 Sq.ft. out of which 7547 Sq.ft. i.e 8% is reserved for recreational purposes. Ruparel Vivanza has 1 Wings / Towers Ruparel Vivanza

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ruparel Vivanza
  • Location:
  • 1D/716
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    R R Builders
  • Phone:
  • Address:
  • Ruparel Iris
Project RERA Details
MAHA REARA No: P51900003595
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Girish Nerurkar
Funding Bank AXIS BANK
Proposed Possession 30 Jun 2025
Revised Possession 30 Jun 2025
Extended Possession 31 Mar 2027
Litigations No Litigations
Last Modified 15 Dec 2022
Last Retrived 26 Jul 2025
Ruparel Vivanza QR Code
Ruparel Vivanza
MahaRERA - P51900003595
Apartment Details & Configuration
TypeArea
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )
2 BHK59.64 Sq.mts. ( 642 Sq.ft. )
2.5 BHK68.38 Sq.mts. ( 736 Sq.ft. )
3 BHK76.55 Sq.mts. ( 824 Sq.ft. )
Shop190.28 Sq.mts. ( 2048 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ruparel Vivanzalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
By Developer
Any Other Club House
By Developer
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
By Developer
Energy management
By Developer
Fire Protection And Fire Safety Requirements
By Developer
Landscaping & Tree Planting
By Developer
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
By Developer
Solid Waste Management And Disposal
By Developer
Storm Water Drains
By Bmc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
By Developer
Water Conservation, Rain water Harvesting
By Developer
Water Supply
Water Connection Will Be Given By Bmc After Oc
Buildings / Wings in Ruparel Vivanza
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ruparel Vivanza by R R Builderslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

99001 Sq. ft.

Project Area

7547 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

619 apartments in total
Total
619
Booked
325
Available
294

Saleable Area Statistics (Sq. ft.)

335492 Total
Total
335492
Booked
166768
Available
168724
Total 619 apartments in project. 325 apartments booked. 52% apartments booked.
Total 335492 Sq.ft. saleable area. 166768 saleable area booked.
50% area booked.

Ruparel Vivanza

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel VivanzaJun 202540101110688
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )307
198 Booked64% Booked
64% Booked
2 BHK59.64 Sq.mts. ( 642 Sq.ft. )307
126 Booked41% Booked
41% Booked
2.5 BHK68.38 Sq.mts. ( 736 Sq.ft. )2
1 Booked50% Booked
50% Booked
3 BHK76.55 Sq.mts. ( 824 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop190.28 Sq.mts. ( 2048 Sq.ft. )2
None Booked0% Booked
0% Booked
619 total apartments / 325 apartments booked. 52% apartments booked.
Work Description in Building Ruparel VivanzaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
R R Builders
for Project
Ruparel Vivanza
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation