Project overview

Ruparel Primero is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800021096. Ruparel Primero is located at 1832, 32. This is a New being developed by Shree Siddhivinayak Classic Construction Private Limited.

Ruparel Primero has 1 BHK & 2 BHK Apartments with carpet areas ranging from 321 to 670 Sq.ft. Carpet. The Project has total 67 of which 16 are currently available for sale.

Ruparel Primero is being developed on a total land area of 8032 Sq.ft. Ruparel Primero has 1 Wings / Towers Ruaprel Primero

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ruparel Primero
  • Location:
  • 1832, 32
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Shree Siddhivinayak Classic Construction Private Limited
  • Phone:
  • Address:
  • Ruparel Iris
Project RERA Details
MAHA REARA No: P51800021096
Project Type Residential / Group Housing
RERA Project Status New
Architect Mr Rahul Kamathi
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Mar 2025
Last Retrived 26 Jul 2025
Ruparel Primero QR Code
Ruparel Primero
MahaRERA - P51800021096
Apartment Details & Configuration
TypeArea
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )
1 BHK30 Sq.mts. ( 323 Sq.ft. )
1 BHK30.11 Sq.mts. ( 324 Sq.ft. )
2 BHK62.23 Sq.mts. ( 670 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ruparel Primerolast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Before Oc
Energy management
Before Oc
Fire Protection And Fire Safety Requirements
Before Oc
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Before Oc
Solid Waste Management And Disposal
Before Oc
Storm Water Drains
Before Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Before Oc
Water Supply
Before Oc
Buildings / Wings in Ruparel Primero
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ruparel Primero by Shree Siddhivinayak Classic Construction Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8032 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

67 apartments in total
Total
67
Booked
51
Available
16

Saleable Area Statistics (Sq. ft.)

27166 Total
Total
27166
Booked
18532
Available
8634
Total 67 apartments in project. 51 apartments booked. 76% apartments booked.
Total 27166 Sq.ft. saleable area. 18532 saleable area booked.
68% area booked.

Ruaprel Primero

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruaprel PrimeroDec 202319101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )17
15 Booked88% Booked
88% Booked
1 BHK30 Sq.mts. ( 323 Sq.ft. )20
18 Booked90% Booked
90% Booked
1 BHK30.11 Sq.mts. ( 324 Sq.ft. )14
12 Booked85% Booked
85% Booked
2 BHK62.23 Sq.mts. ( 670 Sq.ft. )16
6 Booked37% Booked
37% Booked
67 total apartments / 51 apartments booked. 76% apartments booked.
Work Description in Building Ruaprel PrimeroCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress82% done
82% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Siddhivinayak Classic Construction Private Limited
for Project
Ruparel Primero
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation