Project overview

Ruparel Orion is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800004525. Ruparel Orion is located at Cts No. 470. This is a Ongoing being developed by K D Lite Developers Pvt Ltd.

Ruparel Orion has 1 BHK, 1 BHk, 2 BHK & 3 BHK Apartments with carpet areas ranging from 447 to 980 Sq.ft. Carpet. The Project has total 223 of which 5 are currently available for sale.

Ruparel Orion is being developed on a total land area of 73026 Sq.ft. out of which 4942 Sq.ft. i.e 7% is reserved for recreational purposes. Ruparel Orion has 2 Wings / Towers Ruparel Orion A B Wing,Ruparel Orion C And D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ruparel Orion
  • Location:
  • Cts No. 470
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    K D Lite Developers Pvt Ltd
  • Phone:
  • Address:
  • Ruparel Iris
Project RERA Details
MAHA REARA No: P51800004525
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Mr Rahul Kamathi
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 19 Dec 2019
Last Retrived 26 Jul 2025
Ruparel Orion QR Code
Ruparel Orion
MahaRERA - P51800004525
Apartment Details & Configuration
TypeArea
2 BHK75.58 Sq.mts. ( 814 Sq.ft. )
2 BHK75.84 Sq.mts. ( 816 Sq.ft. )
3 BHK88.17 Sq.mts. ( 949 Sq.ft. )
3 BHK88.84 Sq.mts. ( 956 Sq.ft. )
Shop352.28 Sq.mts. ( 3792 Sq.ft. )
Shop375.78 Sq.mts. ( 4045 Sq.ft. )
Shop390.51 Sq.mts. ( 4203 Sq.ft. )
Shop399.8 Sq.mts. ( 4303 Sq.ft. )
1 BHK41.51 Sq.mts. ( 447 Sq.ft. )
1 BHK41.93 Sq.mts. ( 451 Sq.ft. )
1 BHK44.23 Sq.mts. ( 476 Sq.ft. )
1 BHK44.33 Sq.mts. ( 477 Sq.ft. )
1 BHk44.35 Sq.mts. ( 477 Sq.ft. )
1 BHK44.76 Sq.mts. ( 482 Sq.ft. )
2 BHK76.17 Sq.mts. ( 820 Sq.ft. )
3 BHK91.02 Sq.mts. ( 980 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ruparel Orionlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Prior To Oc
Water Conservation, Rain water Harvesting
Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water
Prior To Oc
Street Lighting
Na
Storm Water Drains
Prior To Oc
Solid Waste Management And Disposal
Prior To Oc
Sewerage (Chamber, Lines, Septic Tank , STP)
Prior To Oc
Open Parking
Prior To Oc
Landscaping & Tree Planting
Prior To Oc
Fire Protection And Fire Safety Requirements
Prior To Oc
Energy management
Prior To Oc
Electrical Meter Room, Sub-Station, Receiving Station
Prior To Oc
Community Buildings
Na
Aggregate area of recreational Open Space
Prior To Oc
Buildings / Wings in Ruparel Orion
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ruparel Orion by K D Lite Developers Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

73026 Sq. ft.

Project Area

4942 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

223 apartments in total
Total
223
Booked
218
Available
5

Saleable Area Statistics (Sq. ft.)

168684 Total
Total
168684
Booked
164604
Available
4080
Total 223 apartments in project. 218 apartments booked. 97% apartments booked.
Total 168684 Sq.ft. saleable area. 164604 saleable area booked.
98% area booked.

Ruparel Orion A B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Orion A B WingDec 20191611004032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK75.58 Sq.mts. ( 814 Sq.ft. )33
30 Booked90% Booked
90% Booked
2 BHK75.84 Sq.mts. ( 816 Sq.ft. )29
29 Booked100% Booked
100% Booked
3 BHK88.17 Sq.mts. ( 949 Sq.ft. )16
16 Booked100% Booked
100% Booked
3 BHK88.84 Sq.mts. ( 956 Sq.ft. )16
16 Booked100% Booked
100% Booked
Shop352.28 Sq.mts. ( 3792 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop375.78 Sq.mts. ( 4045 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop390.51 Sq.mts. ( 4203 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop399.8 Sq.mts. ( 4303 Sq.ft. )1
1 Booked100% Booked
100% Booked
98 total apartments / 95 apartments booked. 96% apartments booked.
Work Description in Building Ruparel Orion A B WingCompletion
Basement (if any)
work-in-progress98% done
98% Booked
Excavation
work-in-progress98% done
98% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Plinth
work-in-progress98% done
98% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress98% done
98% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked

Ruparel Orion C And D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Orion C And DDec 20191610100112
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.51 Sq.mts. ( 447 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK41.93 Sq.mts. ( 451 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 BHK44.23 Sq.mts. ( 476 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK44.33 Sq.mts. ( 477 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHk44.35 Sq.mts. ( 477 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK44.76 Sq.mts. ( 482 Sq.ft. )17
17 Booked100% Booked
100% Booked
2 BHK76.17 Sq.mts. ( 820 Sq.ft. )13
11 Booked84% Booked
84% Booked
3 BHK91.02 Sq.mts. ( 980 Sq.ft. )16
16 Booked100% Booked
100% Booked
125 total apartments / 123 apartments booked. 98% apartments booked.
Work Description in Building Ruparel Orion C And DCompletion
Basement (if any)
work-in-progress95% done
95% Booked
Excavation
work-in-progress95% done
95% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress37% done
37% Booked
Plinth
work-in-progress95% done
95% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress95% done
95% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked
Channel Partners
Channel Partners Registered by Developer
K D Lite Developers Pvt Ltd
for Project
Ruparel Orion
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation