Project overview

Ruparel Luminare is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900034393. Ruparel Luminare is located at 238(Pt), 262(Pt)263(Pt), 256(Pt), 239, 108(Pt), 718(Pt), 264(Pt). This is a New being developed by Shree Sukhakarta Developers Private Limited.

Ruparel Luminare has 2 BHK Apartments with carpet areas ranging from 575 to 740 Sq.ft. Carpet. The Project has total 210 of which 156 are currently available for sale.

Ruparel Luminare is being developed on a total land area of 16419 Sq.ft. Ruparel Luminare has 2 Wings / Towers A Wing,Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ruparel Luminare
  • Location:
  • 238(Pt), 262(Pt)263(Pt), 256(Pt), 239, 108(Pt), 718(Pt), 264(Pt)
  • Const. Stage:
    New
  • Possession:
    30 Jun 2026
Developer Details

  • Developer:
    Shree Sukhakarta Developers Private Limited
  • Phone:
  • Address:
  • Ruparel Iris
Project RERA Details
MAHA REARA No: P51900034393
Project Type Residential / Group Housing
RERA Project Status New
Architect Mr Rahul Kamathi
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Apr 2022
Last Retrived 26 Jul 2025
Ruparel Luminare QR Code
Ruparel Luminare
MahaRERA - P51900034393
Apartment Details & Configuration
TypeArea
1 BHK47.81 Sq.mts. ( 515 Sq.ft. )
2 BHK65.5 Sq.mts. ( 705 Sq.ft. )
2 BHK53.41 Sq.mts. ( 575 Sq.ft. )
2 BHK62.7 Sq.mts. ( 675 Sq.ft. )
2 BHK63.17 Sq.mts. ( 680 Sq.ft. )
2 BHK68.75 Sq.mts. ( 740 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ruparel Luminarelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Before Oc
Electrical Meter Room, Sub-Station, Receiving Station
Before Oc
Energy management
Before Oc
Fire Protection And Fire Safety Requirements
Before Oc
Landscaping & Tree Planting
Before Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Before Oc
Solid Waste Management And Disposal
Before Oc
Storm Water Drains
Before Oc
Street Lighting
Before Oc
Treatment And Disposal Of Sewage And Sullage Water
Before Oc
Water Conservation, Rain water Harvesting
Before Oc
Water Supply
Before Oc
Buildings / Wings in Ruparel Luminare
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ruparel Luminare by Shree Sukhakarta Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

16419 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

210 apartments in total
Total
210
Booked
54
Available
156

Saleable Area Statistics (Sq. ft.)

145769 Total
Total
145769
Booked
37581
Available
108188
Total 210 apartments in project. 54 apartments booked. 25% apartments booked.
Total 145769 Sq.ft. saleable area. 37581 saleable area booked.
26% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202531110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK47.81 Sq.mts. ( 515 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK65.5 Sq.mts. ( 705 Sq.ft. )83
43 Booked51% Booked
51% Booked
84 total apartments / 43 apartments booked. 51% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 202641110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.41 Sq.mts. ( 575 Sq.ft. )16
2 BHK62.7 Sq.mts. ( 675 Sq.ft. )28
2 BHK63.17 Sq.mts. ( 680 Sq.ft. )34
2 BHK68.75 Sq.mts. ( 740 Sq.ft. )48
126 total apartments / 11 apartments booked. 8% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Sukhakarta Developers Private Limited
for Project
Ruparel Luminare
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation