Runwal Forests Tower 5-8 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001838. Runwal Forests Tower 5-8 is located at 607/1-31, 606/1-83, Pt.596-598, 599A/1-81, 605/1-17, 597/1-7, 601-606, 607A607d596/1-6. This is a Ongoing being developed by Wheelabrator Alloy Castings Limited.

Runwal Forests Tower 5-8 has 3 BHK Apartments with carpet areas ranging from 1081 to 1075 Sq.ft. Carpet. The Project has total 626 of which 7 are currently available for sale.

Runwal Forests Tower 5-8 is being developed on a total land area of 19578 Sq.ft. Runwal Forests Tower 5-8 has 4 Wings / Towers Tower -5,Tower -6,Tower-7,Tower-8

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Runwal Forests Tower 5-8
  • Location:
  • 607/1-31, 606/1-83, Pt.596-598, 599A/1-81, 605/1-17, 597/1-7, 601-606, 607A607d596/1-6
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Wheelabrator Alloy Castings Limited
  • Phone:
  • Address:
  • Shastri Marg,
Project RERA Details
MAHA REARA No: P51800001838
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Aakar Architects & Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 17 Feb 2021
Last Retrived 26 Jul 2025
Runwal Forests Tower 5-8 QR Code
Runwal Forests Tower 5-8
MahaRERA - P51800001838
Apartment Details & Configuration
TypeArea
2 BHK58.7 Sq.mts. ( 632 Sq.ft. )
2 BHK61.39 Sq.mts. ( 661 Sq.ft. )
2 BHK63.51 Sq.mts. ( 684 Sq.ft. )
2 BHK68.85 Sq.mts. ( 741 Sq.ft. )
2 BHK71.63 Sq.mts. ( 771 Sq.ft. )
2 BHK73.76 Sq.mts. ( 794 Sq.ft. )
3 BHK88.73 Sq.mts. ( 955 Sq.ft. )
3 BHK99.87 Sq.mts. ( 1075 Sq.ft. )
3 BHK100.43 Sq.mts. ( 1081 Sq.ft. )
3 BHK102.52 Sq.mts. ( 1104 Sq.ft. )
3 BHK110.83 Sq.mts. ( 1193 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Runwal Forests Tower 5-8last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
For All Towers In Larger Project
Common Basement100% completed
95% Complete
Common For All The Towers
Common Car Parking60% completed
60% Complete
For All Towers In Larger Project
Community Buildings15% completed
15% Complete
For All Towers In Larger Project
Cricket pitch
For All Towers In Larger Project
Dedicated children play area
For All Towers In Larger Project
DG Backup for critical and Emergency Services100% completed
95% Complete
For All Towers In Larger Project
Electrical Meter Room, Sub-Station, Receiving Station67% completed
67% Complete
For All Towers In Larger Project
Energy management50% completed
50% Complete
For All Towers In Larger Project
Fire Protection And Fire Safety Requirements100% completed
95% Complete
For All Towers In Larger Project
Jogging / running track / Cycling Track
For All Towers In Larger Project
Landscaping & Tree Planting38% completed
38% Complete
For All Towers In Larger Project
Open air Gymnasium
For All Towers In Larger Project
Open Parking
Na
Putting green
For All Towers In Larger Project
Senior citizen area
For All Towers In Larger Project
Sewerage (Chamber, Lines, Septic Tank , STP)31% completed
31% Complete
For All Towers In Larger Project
Skating rink
For All Towers In Larger Project
Solid Waste Management And Disposal80% completed
80% Complete
For All Towers In Larger Project
Storm Water Drains64% completed
64% Complete
For All Towers In Larger Project
Street Lighting80% completed
80% Complete
For All Towers In Larger Project
Swimming pool 1
For All Towers In Larger Project
Swimming Pool No 2 Kids Pool
For All Towers In Larger Project
Swimming Pool No 3
For All Towers In Larger Project
Treatment And Disposal Of Sewage And Sullage Water45% completed
45% Complete
For All Towers In Larger Project
Water bodies
For All Towers In Larger Project
Water Conservation, Rain water Harvesting80% completed
80% Complete
For All Towers In Larger Project
Water Supply65% completed
65% Complete
For All Towers In Larger Project
Yoga Zone
For All Towers In Larger Project
Zen garden
For All Towers In Larger Project
Buildings / Wings in Runwal Forests Tower 5-8
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Runwal Forests Tower 5-8 by Wheelabrator Alloy Castings Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

19578 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

626 apartments in total
Total
626
Booked
619
Available
7

Saleable Area Statistics (Sq. ft.)

498469 Total
Total
498469
Booked
491997
Available
6472
Total 626 apartments in project. 619 apartments booked. 98% apartments booked.
Total 498469 Sq.ft. saleable area. 491997 saleable area booked.
99% area booked.

Tower -5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower -5Apr 20214010100144
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.7 Sq.mts. ( 632 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK61.39 Sq.mts. ( 661 Sq.ft. )142
142 Booked100% Booked
100% Booked
2 BHK63.51 Sq.mts. ( 684 Sq.ft. )1
1 Booked100% Booked
100% Booked
145 total apartments / 145 apartments booked. 100% apartments booked.
Work Description in Building Tower -5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower -6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower -6Apr 20214010100142
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.7 Sq.mts. ( 632 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK61.39 Sq.mts. ( 661 Sq.ft. )142
142 Booked100% Booked
100% Booked
2 BHK63.51 Sq.mts. ( 684 Sq.ft. )1
1 Booked100% Booked
100% Booked
145 total apartments / 145 apartments booked. 100% apartments booked.
Work Description in Building Tower -6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower-7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-7Apr 20214010100142
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK68.85 Sq.mts. ( 741 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK71.63 Sq.mts. ( 771 Sq.ft. )142
142 Booked100% Booked
100% Booked
2 BHK73.76 Sq.mts. ( 794 Sq.ft. )1
1 Booked100% Booked
100% Booked
145 total apartments / 144 apartments booked. 99% apartments booked.
Work Description in Building Tower-7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower-8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-8Apr 202153101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK88.73 Sq.mts. ( 955 Sq.ft. )91
85 Booked93% Booked
93% Booked
3 BHK99.87 Sq.mts. ( 1075 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK100.43 Sq.mts. ( 1081 Sq.ft. )97
97 Booked100% Booked
100% Booked
3 BHK102.52 Sq.mts. ( 1104 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK110.83 Sq.mts. ( 1193 Sq.ft. )1
1 Booked100% Booked
100% Booked
191 total apartments / 185 apartments booked. 96% apartments booked.
Work Description in Building Tower-8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Wheelabrator Alloy Castings Limited
for Project
Runwal Forests Tower 5-8
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation