Project overview

Runwal Forest Tower 1-4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000818. Runwal Forest Tower 1-4 is located at Pt.596-598, 602/1-9, 606/1-83, 605/1-17, 607A607d596/1-6, 601-606, 599A/1-81, 607/1-31. This is a Ongoing being developed by Wheelabrator Alloy Castings Limited.

Runwal Forest Tower 1-4 has 2 BHK & Studio Apartment Apartments with carpet areas ranging from 298 to 753 Sq.ft. Carpet. The Project has total 871 of which 0 are currently available for sale.

Runwal Forest Tower 1-4 is being developed on a total land area of 20180 Sq.ft. Runwal Forest Tower 1-4 has 3 Wings / Towers Tower 1 And 2,Tower 3,Tower 4

ProjectDeveloperLocationPossession
Stella Sapphire B WingVaibhavlaxmi Builders And Developers51 Part31-12-2018 00:00:00
Shree Siddhi Bldg No 69Hiranimanthan Builders And Developers12 Pt31-03-2020 00:00:00
Venus TowersVenus EnterprisesMumbai Suburban31-12-2020 00:00:00
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedPt.596-598, 602/1-9, 606/1-83, 605/1-17, 607A607d596/1-6, 601-606, 599A/1-81, 607/1-3130-04-2022 00:00:00
Altavista - Phase 1Spenta Enclave Private Limited343 Part31-12-2019 00:00:00
Sagar C.H.SHiranimanthan Builders And Developers12 Pt31-12-2019 00:00:00
Project Details
  • Project:
    Runwal Forest Tower 1-4
  • Location:
  • Pt.596-598, 602/1-9, 606/1-83, 605/1-17, 607A607d596/1-6, 601-606, 599A/1-81, 607/1-31
  • Const. Stage:
    Ongoing
  • Possession:
    30 Apr 2022
Developer Details

  • Developer:
    Wheelabrator Alloy Castings Limited
  • Phone:
  • Address:
  • Shastri Marg,
Project RERA Details
MAHA REARA No: P51800000818
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Aakar Architects & Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Apr 2022
Revised Possession 30 Apr 2022
Extended Possession
Litigations No Litigations
Last Modified 23 Jul 2017
Last Retrived 26 Jul 2025
Runwal Forest Tower 1-4 QR Code
Runwal Forest Tower 1-4
MahaRERA - P51800000818
Apartment Details & Configuration
TypeArea
1.5 BHK43.13 Sq.mts. ( 464 Sq.ft. )
1.5 BHK43.39 Sq.mts. ( 467 Sq.ft. )
1.5 BHK43.79 Sq.mts. ( 471 Sq.ft. )
1.5 BHK46.1 Sq.mts. ( 496 Sq.ft. )
2 BHK60.93 Sq.mts. ( 656 Sq.ft. )
2 BHK61.39 Sq.mts. ( 661 Sq.ft. )
2 BHK67.97 Sq.mts. ( 732 Sq.ft. )
2 BHK69.64 Sq.mts. ( 750 Sq.ft. )
2 BHK69.95 Sq.mts. ( 753 Sq.ft. )
Studio Apartment27.7 Sq.mts. ( 298 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Runwal Forest Tower 1-4last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
For All Towers In Larger Project
Common Basement100% completed
95% Complete
Common For All The Towers
Common Car Parking60% completed
60% Complete
For All Towers In Larger Project
Community Buildings15% completed
15% Complete
For All Towers In Larger Project
Cricket pitch
For All Towers In Larger Project
Dedicated children play area
For All Towers In Larger Project
DG Backup for critical and Emergency Services100% completed
95% Complete
For All Towers In Larger Project
Electrical Meter Room, Sub-Station, Receiving Station70% completed
70% Complete
For All Towers In Larger Project
Energy management50% completed
50% Complete
For All Towers In Larger Project
Fire Protection And Fire Safety Requirements70% completed
70% Complete
For All Towers In Larger Project
Jogging / running track / Cycling Track
For All Towers In Larger Project
Landscaping & Tree Planting50% completed
50% Complete
For All Towers In Larger Project
Open air Gymnasium
For All Towers In Larger Project
Open Parking
Na
Putting green
For All Towers In Larger Project
Senior citizen area
For All Towers In Larger Project
Sewerage (Chamber, Lines, Septic Tank , STP)24% completed
24% Complete
For All Towers In Larger Project
Skating rink
For All Towers In Larger Project
Solid Waste Management And Disposal50% completed
50% Complete
For All Towers In Larger Project
Storm Water Drains85% completed
85% Complete
For All Towers In Larger Project
Street Lighting80% completed
80% Complete
For All Towers In Larger Project
Swimming pool 1
For All Towers In Larger Project
Swimming Pool 2
For All Towers In Larger Project
Swimming Pool No 3 Kids Pool
For All Towers In Larger Project
Treatment And Disposal Of Sewage And Sullage Water45% completed
45% Complete
For All Towers In Larger Project
Water bodies
For All Towers In Larger Project
Water Conservation, Rain water Harvesting80% completed
80% Complete
For All Towers In Larger Project
Water Supply80% completed
80% Complete
For All Towers In Larger Project
Yoga Zone
For All Towers In Larger Project
Zen garden
For All Towers In Larger Project
Buildings / Wings in Runwal Forest Tower 1-4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Runwal Forest Tower 1-4 by Wheelabrator Alloy Castings Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

20180 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

871 apartments in total
Total
871
Booked
871
Available
0

Saleable Area Statistics (Sq. ft.)

459280 Total
Total
459280
Booked
459280
Available
0
Total 871 apartments in project. 871 apartments booked. 100% apartments booked.
Total 459280 Sq.ft. saleable area. 459280 saleable area booked.
100% area booked.

Tower 1 And 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1 And 2Apr 20214410100932
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK43.13 Sq.mts. ( 464 Sq.ft. )2
2 Booked100% Booked
100% Booked
1.5 BHK43.39 Sq.mts. ( 467 Sq.ft. )2
2 Booked100% Booked
100% Booked
1.5 BHK43.79 Sq.mts. ( 471 Sq.ft. )314
314 Booked100% Booked
100% Booked
1.5 BHK46.1 Sq.mts. ( 496 Sq.ft. )2
2 Booked100% Booked
100% Booked
320 total apartments / 320 apartments booked. 100% apartments booked.
Work Description in Building Tower 1 And 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Apr 20214410100301
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK43.13 Sq.mts. ( 464 Sq.ft. )2
2 Booked100% Booked
100% Booked
1.5 BHK43.39 Sq.mts. ( 467 Sq.ft. )2
2 Booked100% Booked
100% Booked
1.5 BHK43.79 Sq.mts. ( 471 Sq.ft. )314
314 Booked100% Booked
100% Booked
1.5 BHK46.1 Sq.mts. ( 496 Sq.ft. )2
2 Booked100% Booked
100% Booked
320 total apartments / 320 apartments booked. 100% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 4Apr 20214210100228
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK60.93 Sq.mts. ( 656 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK61.39 Sq.mts. ( 661 Sq.ft. )147
147 Booked100% Booked
100% Booked
2 BHK67.97 Sq.mts. ( 732 Sq.ft. )38
38 Booked100% Booked
100% Booked
2 BHK69.64 Sq.mts. ( 750 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK69.95 Sq.mts. ( 753 Sq.ft. )39
39 Booked100% Booked
100% Booked
Studio Apartment27.7 Sq.mts. ( 298 Sq.ft. )4
4 Booked100% Booked
100% Booked
231 total apartments / 231 apartments booked. 100% apartments booked.
Work Description in Building Tower 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Wheelabrator Alloy Castings Limited
for Project
Runwal Forest Tower 1-4
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation