Project overview

Runwal Elina is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000072. Runwal Elina is located at 685A, 684, 687 1 To 6. This is a Ongoing being developed by Runwal Developers Private Limited.

Runwal Elina has 1 BHK & 2 BHK Apartments with carpet areas ranging from 388 to 793 Sq.ft. Carpet. The Project has total 126 of which 35 are currently available for sale.

Runwal Elina is being developed on a total land area of 48863 Sq.ft. out of which 9640 Sq.ft. i.e 20% is reserved for recreational purposes. Runwal Elina has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Corporate PrideHub Real Estate Pvt. Ltd746, 74730-12-2021 00:00:00
Powai ProjectH.K.Pujara Builders188/9 Pt30-12-2023 00:00:00
Emerald Isle - T7Larsen & Toubro Ltd. (Realty Division)Part Of 117B30-06-2018 00:00:00
Gundecha Asta Phase IAnaya Infrastructure Pvt. Ltd.687B31-05-2018 00:00:00
Emerald Isle - T8Larsen & Toubro Ltd. (Realty Division)Part Of 117B31-12-2018 00:00:00
PalazzioSpenta Builders Private Limited832 B31-12-2017 00:00:00
55 Corporate Avenue Building No 2The Cannonade Construction Company Pvt Ltd18330-12-2021 00:00:00
OptimaUnirock Developers40005931-12-2022 00:00:00
Hitesh ApartmentMagnum Cylinders Private LimitedMumbai Suburban, 40008631-07-2022 00:00:00
Times Square- C WingNtpl Developers,LlpD, Part 758/A31-03-2020 00:00:00
Ndw AltimaAviation Hotels Pvt Ltd1651A/130-12-2023 00:00:00
Trade Square 4Th To 7Th FloorAtul PropertiesOff. Andheri Kurla Road30-03-2025 00:00:00
Proxima ResidencesAviation Hotels Pvt. Ltd.1651A/130-12-2022 00:00:00
C And J Corporate ParkAnil Arora66930-04-2020 00:00:00
Heritage Crystal DevelopersFp No 566B, Cts No F/147230-12-2022 00:00:00
72 Marina - Phase I - Tierra And TorresD S Developers668, 668/1 To 3931-12-2026 00:00:00
Swaminarayan DhamAra Builders Private Limited83730-12-2025 00:00:00
Pride PanoramaLandcare Realty Llp657, S. No 17 Hissa No 231-12-2025 00:00:00
Project Details
  • Project:
    Runwal Elina
  • Location:
  • 685A, 684, 687 1 To 6
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2017
Developer Details

  • Developer:
    Runwal Developers Private Limited
  • Phone:
  • Address:
  • Runwal Omkar E Square
Project RERA Details
MAHA REARA No: P51800000072
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Pallavi Ganesh Matkari
Funding Bank INDUSIND BANK
Proposed Possession 31 Dec 2017
Revised Possession 31 Dec 2017
Extended Possession 31 Dec 2018
Litigations No Litigations
Last Modified 26 Nov 2019
Last Retrived 26 Jul 2025
Runwal Elina QR Code
Runwal Elina
MahaRERA - P51800000072
Apartment Details & Configuration
TypeArea
2 BHK60.08 Sq.mts. ( 647 Sq.ft. )
2 BHK60.86 Sq.mts. ( 655 Sq.ft. )
2 BHK62.6 Sq.mts. ( 674 Sq.ft. )
2 BHK68.92 Sq.mts. ( 742 Sq.ft. )
2 BHK69.84 Sq.mts. ( 752 Sq.ft. )
2 BHK71.01 Sq.mts. ( 764 Sq.ft. )
3 BHK94.88 Sq.mts. ( 1021 Sq.ft. )
3 BHK96.43 Sq.mts. ( 1038 Sq.ft. )
3 BHK96.49 Sq.mts. ( 1039 Sq.ft. )
3 BHK98.3 Sq.mts. ( 1058 Sq.ft. )
2 BHK59.42 Sq.mts. ( 640 Sq.ft. )
2 BHK60.23 Sq.mts. ( 648 Sq.ft. )
2 BHK61.55 Sq.mts. ( 663 Sq.ft. )
2 BHK69.76 Sq.mts. ( 751 Sq.ft. )
2.5 BHK85.53 Sq.mts. ( 921 Sq.ft. )
2.5 BHK87.62 Sq.mts. ( 943 Sq.ft. )
1 BHK36.06 Sq.mts. ( 388 Sq.ft. )
2 BHK60.18 Sq.mts. ( 648 Sq.ft. )
2 BHK69.53 Sq.mts. ( 748 Sq.ft. )
2 BHK71.35 Sq.mts. ( 768 Sq.ft. )
2 BHK73.63 Sq.mts. ( 793 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Runwal Elinalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Wip
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Wip
Landscaping & Tree Planting100% completed
95% Complete
Wip
Open Parking100% completed
95% Complete
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp
Solid Waste Management And Disposal100% completed
95% Complete
Stp
Storm Water Drains100% completed
95% Complete
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Stp
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rwt
Water Supply100% completed
95% Complete
Water Pipe Lines
Buildings / Wings in Runwal Elina
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Runwal Elina by Runwal Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

48863 Sq. ft.

Project Area

9640 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

126 apartments in total
Total
126
Booked
91
Available
35

Saleable Area Statistics (Sq. ft.)

102901 Total
Total
102901
Booked
75750
Available
27151
Total 126 apartments in project. 91 apartments booked. 72% apartments booked.
Total 102901 Sq.ft. saleable area. 75750 saleable area booked.
74% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 2018141310867
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK60.08 Sq.mts. ( 647 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK60.86 Sq.mts. ( 655 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK62.6 Sq.mts. ( 674 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.92 Sq.mts. ( 742 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK69.84 Sq.mts. ( 752 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK71.01 Sq.mts. ( 764 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK94.88 Sq.mts. ( 1021 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK96.43 Sq.mts. ( 1038 Sq.ft. )8
7 Booked87% Booked
87% Booked
3 BHK96.49 Sq.mts. ( 1039 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK98.3 Sq.mts. ( 1058 Sq.ft. )8
7 Booked87% Booked
87% Booked
51 total apartments / 49 apartments booked. 96% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 2018141310860
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.42 Sq.mts. ( 640 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK60.23 Sq.mts. ( 648 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK61.55 Sq.mts. ( 663 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK68.92 Sq.mts. ( 742 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK69.76 Sq.mts. ( 751 Sq.ft. )6
3 Booked50% Booked
50% Booked
2.5 BHK85.53 Sq.mts. ( 921 Sq.ft. )5
5 Booked100% Booked
100% Booked
2.5 BHK87.62 Sq.mts. ( 943 Sq.ft. )18
13 Booked72% Booked
72% Booked
49 total apartments / 41 apartments booked. 83% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 201714131041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.06 Sq.mts. ( 388 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK60.18 Sq.mts. ( 648 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK69.53 Sq.mts. ( 748 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK71.35 Sq.mts. ( 768 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK73.63 Sq.mts. ( 793 Sq.ft. )6
None Booked0% Booked
0% Booked
26 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress22% done
22% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress20% done
20% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Runwal Developers Private Limited
for Project
Runwal Elina
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation