Project overview

Royale Rose is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800055030. Royale Rose is located at A/683 And A/684 Of Village Bandra (West) Boran Road Off. Hill Road Bandra (West) Mumbai. This is a New being developed by Project One.

Royale Rose has 2 BHK, Rehab 2 BHK, Sale 2 BHK & Sale Gymnasium Apartments with carpet areas ranging from 145 to 517 Sq.ft. Carpet. The Project has total 27 of which 24 are currently available for sale.

Royale Rose is being developed on a total land area of 5491 Sq.ft. Royale Rose has 1 Wings / Towers Royale Rose

ProjectDeveloperLocationPossession
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
SambhaviShree Vakratunda DevelopersSurvey No 531-10-2024 00:00:00
Shree Mangal Narayan ResidencyN V ConstructionCts 9721 To973431-12-2023 00:00:00
Vakratunda HomesNarayan Sunil RanePlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Project Details
  • Project:
    Royale Rose
  • Location:
  • A/683 And A/684 Of Village Bandra (West) Boran Road Off. Hill Road Bandra (West) Mumbai
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    Project One
  • Phone:
  • Address:
  • Luisa Apartments
Project RERA Details
MAHA REARA No: P51800055030
Project Type Others
RERA Project Status New
Funding Bank FEDERAL BANK
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 Feb 2024
Last Retrived 26 Jul 2025
Royale Rose QR Code
Royale Rose
MahaRERA - P51800055030
Apartment Details & Configuration
TypeArea
2 BHK47.87 Sq.mts. ( 515 Sq.ft. )
Rehab 2 BHK48.01 Sq.mts. ( 517 Sq.ft. )
Rehab 2 BHK33.08 Sq.mts. ( 356 Sq.ft. )
Rehab 2 BHK44.8 Sq.mts. ( 482 Sq.ft. )
Rehab 2 BHK46.53 Sq.mts. ( 501 Sq.ft. )
Rehab 2 BHK47.74 Sq.mts. ( 514 Sq.ft. )
Sale 2 BHK47.09 Sq.mts. ( 507 Sq.ft. )
Sale Gymnasium13.5 Sq.mts. ( 145 Sq.ft. )
Sale Gymnasium21.77 Sq.mts. ( 234 Sq.ft. )
Sale Gymnasium32.31 Sq.mts. ( 348 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Royale Roselast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
As Per Approved Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank To Be Provided
Solid Waste Management And Disposal
As Per Approved Plan
Storm Water Drains
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
After Completion Of Work
Buildings / Wings in Royale Rose
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Royale Rose by Project Onelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5491 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

27 apartments in total
Total
27
Booked
3
Available
24

Saleable Area Statistics (Sq. ft.)

12751 Total
Total
12751
Booked
1529
Available
11222
Total 27 apartments in project. 3 apartments booked. 11% apartments booked.
Total 12751 Sq.ft. saleable area. 1529 saleable area booked.
12% area booked.

Royale Rose

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Royale RoseDec 202891010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.87 Sq.mts. ( 515 Sq.ft. )1
1 Booked100% Booked
100% Booked
Rehab 2 BHK47.87 Sq.mts. ( 515 Sq.ft. )3
None Booked0% Booked
0% Booked
Rehab 2 BHK48.01 Sq.mts. ( 517 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab 2 BHK33.08 Sq.mts. ( 356 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab 2 BHK44.8 Sq.mts. ( 482 Sq.ft. )3
None Booked0% Booked
0% Booked
Rehab 2 BHK46.53 Sq.mts. ( 501 Sq.ft. )3
None Booked0% Booked
0% Booked
Rehab 2 BHK47.74 Sq.mts. ( 514 Sq.ft. )2
None Booked0% Booked
0% Booked
Sale 2 BHK47.74 Sq.mts. ( 514 Sq.ft. )2
None Booked0% Booked
0% Booked
Sale 2 BHK47.09 Sq.mts. ( 507 Sq.ft. )5
2 Booked40% Booked
40% Booked
Sale 2 BHK48.01 Sq.mts. ( 517 Sq.ft. )3
None Booked0% Booked
0% Booked
Sale Gymnasium13.5 Sq.mts. ( 145 Sq.ft. )1
None Booked0% Booked
0% Booked
Sale Gymnasium21.77 Sq.mts. ( 234 Sq.ft. )1
None Booked0% Booked
0% Booked
Sale Gymnasium32.31 Sq.mts. ( 348 Sq.ft. )1
None Booked0% Booked
0% Booked
27 total apartments / 3 apartments booked. 11% apartments booked.
Work Description in Building Royale RoseCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress29% done
29% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked
Channel Partners
Channel Partners Registered by Developer
Project One
for Project
Royale Rose
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation