Project overview

Royal Residency C Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900012122. Royal Residency C Phase I is located at Cts No 4/50 4B/50 4C/50. This is a Ongoing being developed by Devang Hemantkumar Vyas.

Royal Residency C Phase I has 2 BHK Apartments with carpet areas ranging from 653 to 653 Sq.ft. Carpet. The Project has total 18 of which 0 are currently available for sale.

Royal Residency C Phase I is being developed on a total land area of 87308 Sq.ft. out of which 13096 Sq.ft. i.e 15% is reserved for recreational purposes. Royal Residency C Phase I has 1 Wings / Towers Royal Residency C Phase I

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Royal Residency C Phase I
  • Location:
  • Cts No 4/50 4B/50 4C/50
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jan 2018
Developer Details

  • Developer:
    Devang Hemantkumar Vyas
  • Phone:
  • Address:
  • Royal Residency C
Project RERA Details
MAHA REARA No: P51900012122
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Redkar And Redkar
Funding Bank UNION BANK OF INDIA
Proposed Possession 31 Jan 2018
Revised Possession 31 Jan 2018
Extended Possession 27 Aug 2025
Litigations No Litigations
Last Modified 11 Mar 2024
Last Retrived 26 Jul 2025
Royal Residency C Phase I QR Code
Royal Residency C Phase I
MahaRERA - P51900012122
Apartment Details & Configuration
TypeArea
2 BHK60.62 Sq.mts. ( 653 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Royal Residency C Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting
Na
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Royal Residency C Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Royal Residency C Phase I by Devang Hemantkumar Vyaslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

87308 Sq. ft.

Project Area

13096 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

18 apartments in total
Total
18
Booked
18
Available
0

Saleable Area Statistics (Sq. ft.)

11745 Total
Total
11745
Booked
11745
Available
0
Total 18 apartments in project. 18 apartments booked. 100% apartments booked.
Total 11745 Sq.ft. saleable area. 11745 saleable area booked.
100% area booked.

Royal Residency C Phase I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Royal Residency C Phase IJan 2018111010156
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK60.62 Sq.mts. ( 653 Sq.ft. )18
18 Booked100% Booked
100% Booked
18 total apartments / 18 apartments booked. 100% apartments booked.
Work Description in Building Royal Residency C Phase ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Devang Hemantkumar Vyas
for Project
Royal Residency C Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation