Project overview

Royal Castle is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700010834. Royal Castle is located at Survey No 82 Hissa No 3 And 4. This is a Ongoing being developed by Shreenath Developers.

Royal Castle has 1 BHK Apartments with carpet areas ranging from 346 to 361 Sq.ft. Carpet. The Project has total 143 of which 16 are currently available for sale.

Royal Castle is being developed on a total land area of 53025 Sq.ft. out of which 5302 Sq.ft. i.e 10% is reserved for recreational purposes. Royal Castle has 4 Wings / Towers Building No 1,Building No 3,Building No 4,Building No 5

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Royal Castle
  • Location:
  • Survey No 82 Hissa No 3 And 4
  • Const. Stage:
    Ongoing
  • Possession:
    30 Nov 2020
Developer Details

  • Developer:
    Shreenath Developers
  • Phone:
  • Address:
  • Jeevandeep Apt
Project RERA Details
MAHA REARA No: P51700010834
Project Type Others
RERA Project Status Ongoing
Architect Pramod Kamble
Funding Bank IDBI BANK
Proposed Possession 30 Nov 2020
Revised Possession 30 Nov 2020
Extended Possession 31 Mar 2024
Litigations No Litigations
Last Modified 17 Oct 2023
Last Retrived 26 Jul 2025
Royal Castle QR Code
Royal Castle
MahaRERA - P51700010834
Apartment Details & Configuration
TypeArea
1 BHK30.81 Sq.mts. ( 332 Sq.ft. )
1 BHK30.94 Sq.mts. ( 333 Sq.ft. )
2 BHK42.34 Sq.mts. ( 456 Sq.ft. )
Shop11.14 Sq.mts. ( 120 Sq.ft. )
Shop12.53 Sq.mts. ( 135 Sq.ft. )
Shop16.6 Sq.mts. ( 179 Sq.ft. )
Shop18.13 Sq.mts. ( 195 Sq.ft. )
Shop18.94 Sq.mts. ( 204 Sq.ft. )
1 BHK32.19 Sq.mts. ( 346 Sq.ft. )
1 BHK32.18 Sq.mts. ( 346 Sq.ft. )
1 BHK33.5 Sq.mts. ( 361 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Royal Castlelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
492.61
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station10% completed
10% Complete
Electric Room Proposed
Energy management
Solar Lighting
Fire Protection And Fire Safety Requirements10% completed
10% Complete
As Per Approvals
Landscaping & Tree Planting
Tree Planting Proposed
Open Parking
424.60
Sewerage (Chamber, Lines, Septic Tank , STP)25% completed
25% Complete
Septic Tank Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting10% completed
10% Complete
Rain Water Harvesting Proposed
Water Supply
Water Connection Will Be Provided By Concerned Dep
Buildings / Wings in Royal Castle
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Royal Castle by Shreenath Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

53025 Sq. ft.

Project Area

5302 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

143 apartments in total
Total
143
Booked
127
Available
16

Saleable Area Statistics (Sq. ft.)

49841 Total
Total
49841
Booked
44678
Available
5163
Total 143 apartments in project. 127 apartments booked. 88% apartments booked.
Total 49841 Sq.ft. saleable area. 44678 saleable area booked.
90% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1May 202081010125
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.81 Sq.mts. ( 332 Sq.ft. )20
13 Booked65% Booked
65% Booked
1 BHK30.94 Sq.mts. ( 333 Sq.ft. )19
14 Booked73% Booked
73% Booked
2 BHK42.34 Sq.mts. ( 456 Sq.ft. )20
19 Booked95% Booked
95% Booked
Shop11.14 Sq.mts. ( 120 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.53 Sq.mts. ( 135 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop16.6 Sq.mts. ( 179 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop18.13 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.94 Sq.mts. ( 204 Sq.ft. )2
2 Booked100% Booked
100% Booked
67 total apartments / 52 apartments booked. 77% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Dec 201781010145
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.19 Sq.mts. ( 346 Sq.ft. )20
20 Booked100% Booked
100% Booked
20 total apartments / 20 apartments booked. 100% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4Dec 201781010145
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.19 Sq.mts. ( 346 Sq.ft. )22
22 Booked100% Booked
100% Booked
22 total apartments / 22 apartments booked. 100% apartments booked.
Work Description in Building Building No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5Dec 201781010154
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.18 Sq.mts. ( 346 Sq.ft. )25
24 Booked96% Booked
96% Booked
1 BHK32.19 Sq.mts. ( 346 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK33.5 Sq.mts. ( 361 Sq.ft. )6
6 Booked100% Booked
100% Booked
34 total apartments / 33 apartments booked. 97% apartments booked.
Work Description in Building Building No 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shreenath Developers
for Project
Royal Castle
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation