Project overview

Rk Complex 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000026361. Rk Complex 1 is located at Boisar Road. This is a New Project being developed by Shree Enterprises.

Rk Complex 1 has 1 BHK & Shop Apartments with carpet areas ranging from 208 to 50 Sq.ft. Carpet. The Project has total 56 of which 56 are currently available for sale.

Rk Complex 1 is being developed on a total land area of 19113 Sq.ft. out of which 4236 Sq.ft. i.e 22% is reserved for recreational purposes. Rk Complex 1 has 2 Wings / Towers Rk Complex,Rk Complexproposed

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Rk Complex 1
  • Location:
  • Boisar Road
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Shree Enterprises
  • Phone:
  • Address:
  • 19/6, R K Complex, Shiegaon Road, Wanjar Wada, Boisar ( East ), 401501
Project RERA Details
MAHA REARA No: P99000026361
Project Type Commercial
RERA Project Status New Project
Funding Bank BASIN CATHOLIC CO-OP BANK LTD
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Sep 2020
Last Retrived 28 Jul 2025
Rk Complex 1 QR Code
Rk Complex 1
MahaRERA - P99000026361
Apartment Details & Configuration
TypeArea
2 BHK24.62 Sq.mts. ( 265 Sq.ft. )
Shop25.1 Sq.mts. ( 270 Sq.ft. )
Shop4.68 Sq.mts. ( 50 Sq.ft. )
Shop19.31 Sq.mts. ( 208 Sq.ft. )
Shop21.55 Sq.mts. ( 232 Sq.ft. )
1 BHK24.52 Sq.mts. ( 264 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rk Complex 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Drawing
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Drawing
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
As Per Drawing
Open Parking
As Per Drawing
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Drawing
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Drawing
Street Lighting
As Per Drawing
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Drawing
Water Supply
As Per Drawing
Buildings / Wings in Rk Complex 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rk Complex 1 by Shree Enterpriseslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

19113 Sq. ft.

Project Area

4236 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

56 apartments in total
Total
56
Booked
0
Available
56

Saleable Area Statistics (Sq. ft.)

13443 Total
Total
13443
Booked
0
Available
13443
Total 56 apartments in project. 0 apartments booked. 0% apartments booked.
Total 13443 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Rk Complex

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rk ComplexDec 20232101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK24.62 Sq.mts. ( 265 Sq.ft. )10
None Booked0% Booked
0% Booked
Shop25.1 Sq.mts. ( 270 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop4.68 Sq.mts. ( 50 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop19.31 Sq.mts. ( 208 Sq.ft. )5
None Booked0% Booked
0% Booked
Shop21.55 Sq.mts. ( 232 Sq.ft. )2
None Booked0% Booked
0% Booked
22 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rk ComplexCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Rk Complexproposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rk ComplexproposedDec 20233000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.52 Sq.mts. ( 264 Sq.ft. )24
None Booked0% Booked
0% Booked
Shop24.62 Sq.mts. ( 265 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop4.68 Sq.mts. ( 50 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.31 Sq.mts. ( 208 Sq.ft. )3
None Booked0% Booked
0% Booked
34 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rk ComplexproposedCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Enterprises
for Project
Rk Complex 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation