Project overview

Rishabh Tower is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800006332. Rishabh Tower is located at 806/1, Cts, 806. This is a Ongoing being developed by Vipul Pravinchandra Shah.

Rishabh Tower has OFFICE, OFFICE2, OFFICE3, RESIDENCE, RESIDENCE1, RESIDENCE10, RESIDENCE2, RESIDENCE3, RESIDENCE4, RESIDENCE5, RESIDENCE6, RESIDENCE7, RESIDENCE8, RESIDENCE9, SHOP & SHOP1 Apartments with carpet areas ranging from 1313 to 1043 Sq.ft. Carpet. The Project has total 52 of which 35 are currently available for sale.

Rishabh Tower is being developed on a total land area of 18611 Sq.ft. Rishabh Tower has 1 Wings / Towers Rishabh Tower

ProjectDeveloperLocationPossession
Rishabh TowerVipul Pravinchandra Shah806/1, Cts, 80630-06-2018 00:00:00
La AltezaEmerald Developrs21/1 To 21/5, 9, 2030-12-2021 00:00:00
Kamal Dutt ChslChintan Zaveri400058, Mumbai Suburban20-01-2018 00:00:00
Project Details
  • Project:
    Rishabh Tower
  • Location:
  • 806/1, Cts, 806
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2018
Developer Details

  • Developer:
    Vipul Pravinchandra Shah
  • Phone:
  • Address:
  • Vardhaman Apartmrnt
Project RERA Details
MAHA REARA No: P51800006332
Project Type Others
RERA Project Status Ongoing
Architect Hemal U Sanghavi
Funding Bank THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession 30 Jun 2018
Revised Possession 30 Jun 2018
Extended Possession 30 Jun 2023
Litigations No Litigations
Last Modified 29 Jun 2022
Last Retrived 26 Jul 2025
Rishabh Tower QR Code
Rishabh Tower
MahaRERA - P51800006332
Apartment Details & Configuration
TypeArea
OFFICE34.28 Sq.mts. ( 369 Sq.ft. )
OFFICE40.88 Sq.mts. ( 440 Sq.ft. )
OFFICE43.29 Sq.mts. ( 466 Sq.ft. )
OFFICE52.77 Sq.mts. ( 568 Sq.ft. )
OFFICE127.37 Sq.mts. ( 1371 Sq.ft. )
OFFICE264.1 Sq.mts. ( 690 Sq.ft. )
OFFICE319.97 Sq.mts. ( 215 Sq.ft. )
RESIDENCE84.73 Sq.mts. ( 912 Sq.ft. )
RESIDENCE1127 Sq.mts. ( 1367 Sq.ft. )
RESIDENCE1096.9 Sq.mts. ( 1043 Sq.ft. )
RESIDENCE391.97 Sq.mts. ( 990 Sq.ft. )
RESIDENCE4123.19 Sq.mts. ( 1326 Sq.ft. )
RESIDENCE540.32 Sq.mts. ( 434 Sq.ft. )
RESIDENCE688.63 Sq.mts. ( 954 Sq.ft. )
RESIDENCE7126.07 Sq.mts. ( 1357 Sq.ft. )
RESIDENCE8121.98 Sq.mts. ( 1313 Sq.ft. )
RESIDENCE9123.37 Sq.mts. ( 1328 Sq.ft. )
SHOP48.77 Sq.mts. ( 525 Sq.ft. )
SHOP1233.84 Sq.mts. ( 2517 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rishabh Towerlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Only Electric Meter Room
Energy management
Na
Fire Protection And Fire Safety Requirements20% completed
20% Complete
Will Be Complied As Per Fire Noc
Landscaping & Tree Planting
Wip As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Wip As Per Drainage Approval
Solid Waste Management And Disposal100% completed
95% Complete
Completed As Per Swm Noc
Storm Water Drains
Wip As Per Swd Noc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting10% completed
10% Complete
Will Be Complied As Per Consultant
Water Supply
After Oc
Buildings / Wings in Rishabh Tower
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rishabh Tower by Vipul Pravinchandra Shahlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

18611 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

52 apartments in total
Total
52
Booked
17
Available
35

Saleable Area Statistics (Sq. ft.)

47687 Total
Total
47687
Booked
18308
Available
29379
Total 52 apartments in project. 17 apartments booked. 32% apartments booked.
Total 47687 Sq.ft. saleable area. 18308 saleable area booked.
38% area booked.

Rishabh Tower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rishabh TowerDec 2020161110675
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
OFFICE34.28 Sq.mts. ( 369 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE40.88 Sq.mts. ( 440 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE43.29 Sq.mts. ( 466 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE52.77 Sq.mts. ( 568 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE127.37 Sq.mts. ( 1371 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE264.1 Sq.mts. ( 690 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE319.97 Sq.mts. ( 215 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENCE84.73 Sq.mts. ( 912 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENCE1127 Sq.mts. ( 1367 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENCE1096.9 Sq.mts. ( 1043 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENCE252.77 Sq.mts. ( 568 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENCE391.97 Sq.mts. ( 990 Sq.ft. )5
4 Booked80% Booked
80% Booked
RESIDENCE4123.19 Sq.mts. ( 1326 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENCE540.32 Sq.mts. ( 434 Sq.ft. )13
RESIDENCE688.63 Sq.mts. ( 954 Sq.ft. )5
5 Booked100% Booked
100% Booked
RESIDENCE7126.07 Sq.mts. ( 1357 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENCE8121.98 Sq.mts. ( 1313 Sq.ft. )5
1 Booked20% Booked
20% Booked
RESIDENCE9123.37 Sq.mts. ( 1328 Sq.ft. )5
1 Booked20% Booked
20% Booked
SHOP48.77 Sq.mts. ( 525 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP1233.84 Sq.mts. ( 2517 Sq.ft. )1
1 Booked100% Booked
100% Booked
52 total apartments / 17 apartments booked. 32% apartments booked.
Work Description in Building Rishabh TowerCompletion
Basement (if any)
Excavation
work-in-progress95% done
95% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress92% done
92% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress92% done
92% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress92% done
92% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress92% done
92% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked
Channel Partners
Channel Partners Registered by Developer
Vipul Pravinchandra Shah
for Project
Rishabh Tower
last updated on 26 Jul 2025 as per information obtained from MARA RERA.