Project overview

Rigved Windsong is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900046334. Rigved Windsong is located at 268/10. This is a New being developed by Rigved Landmarks Aop.

Rigved Windsong has 2 BHK, 3 BHK, 4 BHK & Shop Apartments with carpet areas ranging from 1164 to 1047 Sq.ft. Carpet. The Project has total 10 of which 7 are currently available for sale.

Rigved Windsong is being developed on a total land area of 5084 Sq.ft. Rigved Windsong has 1 Wings / Towers Rigved Windsong

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Rigved Windsong
  • Location:
  • 268/10
  • Const. Stage:
    New
  • Possession:
    31 Mar 2026
Developer Details

  • Developer:
    Rigved Landmarks Aop
  • Phone:
  • Address:
  • Dharamshy Bhuvan
Project RERA Details
MAHA REARA No: P51900046334
Project Type Residential / Group Housing
RERA Project Status New
Architect A P Dharia And Associates
Funding Bank
Proposed Possession 31 Mar 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 01 Jul 2022
Last Retrived 26 Jul 2025
Rigved Windsong QR Code
Rigved Windsong
MahaRERA - P51900046334
Apartment Details & Configuration
TypeArea
2 BHK108.11 Sq.mts. ( 1164 Sq.ft. )
2 BHK65.74 Sq.mts. ( 708 Sq.ft. )
2 BHK68.42 Sq.mts. ( 736 Sq.ft. )
2 BHK79.24 Sq.mts. ( 853 Sq.ft. )
2 BHK80.57 Sq.mts. ( 867 Sq.ft. )
3 BHK91.66 Sq.mts. ( 987 Sq.ft. )
3 BHK97.31 Sq.mts. ( 1047 Sq.ft. )
3 BHK116 Sq.mts. ( 1249 Sq.ft. )
4 BHK150.07 Sq.mts. ( 1615 Sq.ft. )
Shop32.18 Sq.mts. ( 346 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rigved Windsonglast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Rigved Windsong
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rigved Windsong by Rigved Landmarks Aoplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5084 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

10 apartments in total
Total
10
Booked
3
Available
7

Saleable Area Statistics (Sq. ft.)

9572 Total
Total
9572
Booked
3851
Available
5722
Total 10 apartments in project. 3 apartments booked. 30% apartments booked.
Total 9572 Sq.ft. saleable area. 3851 saleable area booked.
40% area booked.

Rigved Windsong

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rigved WindsongMar 202616110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK108.11 Sq.mts. ( 1164 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK65.74 Sq.mts. ( 708 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK68.42 Sq.mts. ( 736 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK79.24 Sq.mts. ( 853 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK80.57 Sq.mts. ( 867 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK91.66 Sq.mts. ( 987 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK97.31 Sq.mts. ( 1047 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK116 Sq.mts. ( 1249 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK150.07 Sq.mts. ( 1615 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop32.18 Sq.mts. ( 346 Sq.ft. )1
None Booked0% Booked
0% Booked
10 total apartments / 3 apartments booked. 30% apartments booked.
Work Description in Building Rigved WindsongCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Rigved Landmarks Aop
for Project
Rigved Windsong
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation