Project overview

Riddhi Siddhi Park Phase-2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000028016. Riddhi Siddhi Park Phase-2 is located at 401403. This is a New Project being developed by Riddhi Siddhi Builders.

Riddhi Siddhi Park Phase-2 has 1RK & 2 BHK Apartments with carpet areas ranging from 174 to 564 Sq.ft. Carpet. The Project has total 68 of which 68 are currently available for sale.

Riddhi Siddhi Park Phase-2 is being developed on a total land area of 30377 Sq.ft. out of which 3038 Sq.ft. i.e 10% is reserved for recreational purposes. Riddhi Siddhi Park Phase-2 has 12 Wings / Towers Ali E Noor Type-C3,Diamond Palace Type-G,Gold Palace Type-C1,Ratna Palace Type-C,Riddhi Apartment Type-B,Rishabh Apartment Type-A1,Sai Darshan Type-D,Sai Krupa Type-D2,Sai Shraddha Apartment Type-F,Sharada Apartment Type-A,Siddh Apartment Type-E,Silver Palace Type-C2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Riddhi Siddhi Park Phase-2
  • Location:
  • 401403
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Riddhi Siddhi Builders
  • Phone:
  • Address:
  • 01/A`, Saidham, Station Road, Near Fish Market, Dahisar West, 400068
Project RERA Details
MAHA REARA No: P99000028016
Project Type Residential
RERA Project Status New Project
Funding Bank HDFC Bank
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Apr 2022
Last Retrived 28 Jul 2025
Riddhi Siddhi Park Phase-2 QR Code
Riddhi Siddhi Park Phase-2
MahaRERA - P99000028016
Apartment Details & Configuration
TypeArea
1 BHK43.01 Sq.mts. ( 463 Sq.ft. )
2 BHK52.38 Sq.mts. ( 564 Sq.ft. )
1 BHK16.49 Sq.mts. ( 177 Sq.ft. )
1 BHK25.47 Sq.mts. ( 274 Sq.ft. )
2 BHK54.23 Sq.mts. ( 584 Sq.ft. )
1 BHK34.55 Sq.mts. ( 372 Sq.ft. )
1RK16.16 Sq.mts. ( 174 Sq.ft. )
2 BHK45.65 Sq.mts. ( 491 Sq.ft. )
1 BHK24.14 Sq.mts. ( 260 Sq.ft. )
1 BHK38.52 Sq.mts. ( 415 Sq.ft. )
2 BHK48.31 Sq.mts. ( 520 Sq.ft. )
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )
1 BHK35.78 Sq.mts. ( 385 Sq.ft. )
2 BHK31.72 Sq.mts. ( 341 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Riddhi Siddhi Park Phase-2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Garden
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Tree Plantation Done In Garden
Open Parking100% completed
95% Complete
Open Parking Available
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting50% completed
50% Complete
Wip
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Will Be Done
Water Supply
Borewell
Buildings / Wings in Riddhi Siddhi Park Phase-2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Riddhi Siddhi Park Phase-2 by Riddhi Siddhi Builderslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

30377 Sq. ft.

Project Area

3038 Sq. ft.

Recreational Open Space

Total 12

Wings / Towers in Project

Apartments Statistics

68 apartments in total
Total
68
Booked
0
Available
68

Saleable Area Statistics (Sq. ft.)

23581 Total
Total
23581
Booked
0
Available
23581
Total 68 apartments in project. 0 apartments booked. 0% apartments booked.
Total 23581 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Ali E Noor Type-C3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ali E Noor Type-C3Dec 20231100036
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.01 Sq.mts. ( 463 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK52.38 Sq.mts. ( 564 Sq.ft. )1
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ali E Noor Type-C3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Diamond Palace Type-G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Diamond Palace Type-GDec 20235101034
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK16.49 Sq.mts. ( 177 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK25.47 Sq.mts. ( 274 Sq.ft. )18
None Booked0% Booked
0% Booked
23 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Diamond Palace Type-GCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Gold Palace Type-C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gold Palace Type-C1Dec 20231100036
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK54.23 Sq.mts. ( 584 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Gold Palace Type-C1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Ratna Palace Type-C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ratna Palace Type-CDec 20231100022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.55 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK16.16 Sq.mts. ( 174 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK43.01 Sq.mts. ( 463 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK45.65 Sq.mts. ( 491 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ratna Palace Type-CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Riddhi Apartment Type-B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Riddhi Apartment Type-BDec 20231100042
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.14 Sq.mts. ( 260 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.52 Sq.mts. ( 415 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK48.31 Sq.mts. ( 520 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Riddhi Apartment Type-BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rishabh Apartment Type-A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rishabh Apartment Type-A1Dec 20231100043
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )3
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rishabh Apartment Type-A1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sai Darshan Type-D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sai Darshan Type-DDec 20231110035
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.78 Sq.mts. ( 385 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sai Darshan Type-DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sai Krupa Type-D2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sai Krupa Type-D2Dec 20231100033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.78 Sq.mts. ( 385 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sai Krupa Type-D2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sai Shraddha Apartment Type-F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sai Shraddha Apartment Type-FDec 20235101034
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.47 Sq.mts. ( 274 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK31.72 Sq.mts. ( 341 Sq.ft. )5
None Booked0% Booked
0% Booked
18 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sai Shraddha Apartment Type-FCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Sharada Apartment Type-A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sharada Apartment Type-ADec 20231100033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )3
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sharada Apartment Type-ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Siddh Apartment Type-E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Siddh Apartment Type-EDec 20231100022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.14 Sq.mts. ( 260 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.52 Sq.mts. ( 415 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK48.31 Sq.mts. ( 520 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Siddh Apartment Type-ECompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Silver Palace Type-C2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Silver Palace Type-C2Dec 20231100033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK16.16 Sq.mts. ( 174 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK43.01 Sq.mts. ( 463 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK52.38 Sq.mts. ( 564 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Silver Palace Type-C2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Riddhi Siddhi Builders
for Project
Riddhi Siddhi Park Phase-2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation