Project overview
Rg-A,B,E,F is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000003885. Rg-A,B,E,F is located at 401208. This is a On-Going Project being developed by Reliable Realtouch.
Rg-A,B,E,F has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 226 to 485 Sq.ft. Carpet. The Project has total 283 of which 25 are currently available for sale.
Rg-A,B,E,F is being developed on a total land area of 38628 Sq.ft. out of which 24415 Sq.ft. i.e 63% is reserved for recreational purposes. Rg-A,B,E,F has 4 Wings / Towers A Wing,B Wing,E Wing,F Wing
| Project | Developer | Location | Possession |
-
Project:
Rg-A,B,E,F
-
Location:
-
401208
-
Const. Stage:
On-Going Project
-
Possession:
25 Dec 2019
-
Developer:
Reliable Realtouch
-
Phone:
-
Address:
-
Shop No.138, Reliable Prestige, Chandan Naka Achole Road, Idbi Bank, Nalasopara East, 401209
| MAHA REARA No: |
P99000003885 |
| Project Type |
Others |
| RERA Project Status |
On-Going Project |
| Architect |
Vijay Gurav And Associates |
| Funding Bank |
DCB BANK LTD |
| Proposed Possession |
25 Dec 2019 |
| Revised Possession |
25 Dec 2019 |
| Extended Possession |
31 Dec 2025 |
| Litigations |
No Litigations |
| Last Modified |
15 Dec 2023 |
| Last Retrived |
28 Jul 2025 |
Rg-A,B,E,F QR Code
Rg-A,B,E,F
MahaRERA - P99000003885
| Type | Area |
| 1 BHK | 31 Sq.mts. ( 334 Sq.ft. ) |
| 1RK | 21.36 Sq.mts. ( 230 Sq.ft. ) |
| 1RK | 22.29 Sq.mts. ( 240 Sq.ft. ) |
| Shop | 10.54 Sq.mts. ( 113 Sq.ft. ) |
| Shop | 10.87 Sq.mts. ( 117 Sq.ft. ) |
| Shop | 13.46 Sq.mts. ( 145 Sq.ft. ) |
| Shop | 14.22 Sq.mts. ( 153 Sq.ft. ) |
| Shop | 15.35 Sq.mts. ( 165 Sq.ft. ) |
| Shop | 10.86 Sq.mts. ( 117 Sq.ft. ) |
| 1 BHK | 31.31 Sq.mts. ( 337 Sq.ft. ) |
| 2 BHK | 40.86 Sq.mts. ( 440 Sq.ft. ) |
| Shop | 12.1 Sq.mts. ( 130 Sq.ft. ) |
| Shop | 12.66 Sq.mts. ( 136 Sq.ft. ) |
| Shop | 13.09 Sq.mts. ( 141 Sq.ft. ) |
| Shop | 14.23 Sq.mts. ( 153 Sq.ft. ) |
| 1 BHK | 28.92 Sq.mts. ( 311 Sq.ft. ) |
| 1RK | 21.02 Sq.mts. ( 226 Sq.ft. ) |
| 2 BHK | 45.1 Sq.mts. ( 485 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Rg-A,B,E,Flast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
0 |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Na |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Na |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
|
|
0 |
Solid Waste Management And Disposal
|
|
Na |
Storm Water Drains80% completed
|
|
0 |
Street Lighting50% completed
|
|
0 |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
0 |
Water Supply100% completed
|
|
Borewell |
Buildings / Wings in Rg-A,B,E,F
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rg-A,B,E,F by Reliable Realtouchlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
283
apartments in total
Saleable Area Statistics (Sq. ft.)
86123
Total
Total 283 apartments in project. 258 apartments booked. 91% apartments booked.
Total 86123 Sq.ft. saleable area. 78346 saleable area booked.
91% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A Wing | Jun 2021 | 11 | 1 | 0 | 1 | 0 | 10 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31 Sq.mts. ( 334 Sq.ft. ) | 45 | |
| 1RK | 21.36 Sq.mts. ( 230 Sq.ft. ) | 9 | |
| 1RK | 22.29 Sq.mts. ( 240 Sq.ft. ) | 18 | |
| Shop | 10.54 Sq.mts. ( 113 Sq.ft. ) | 3 | |
| Shop | 10.87 Sq.mts. ( 117 Sq.ft. ) | 2 | |
| Shop | 13.46 Sq.mts. ( 145 Sq.ft. ) | 2 | |
| Shop | 14.22 Sq.mts. ( 153 Sq.ft. ) | 2 | |
| Shop | 15.35 Sq.mts. ( 165 Sq.ft. ) | 5 | |
86 total apartments / 79 apartments booked. 91% apartments booked. |
| Work Description in Building A Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B Wing | Jun 2021 | 11 | 1 | 0 | 1 | 0 | 25 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31 Sq.mts. ( 334 Sq.ft. ) | 72 | |
| Shop | 10.54 Sq.mts. ( 113 Sq.ft. ) | 2 | |
| Shop | 10.86 Sq.mts. ( 117 Sq.ft. ) | 2 | |
| Shop | 13.46 Sq.mts. ( 145 Sq.ft. ) | 2 | |
| Shop | 14.22 Sq.mts. ( 153 Sq.ft. ) | 2 | |
| Shop | 15.35 Sq.mts. ( 165 Sq.ft. ) | 3 | |
83 total apartments / 77 apartments booked. 92% apartments booked. |
| Work Description in Building B Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| E Wing | Jun 2021 | 10 | 1 | 0 | 1 | 0 | 5 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31 Sq.mts. ( 334 Sq.ft. ) | 36 | |
| 1 BHK | 31.31 Sq.mts. ( 337 Sq.ft. ) | 9 | |
| 2 BHK | 40.86 Sq.mts. ( 440 Sq.ft. ) | 9 | |
| Shop | 12.1 Sq.mts. ( 130 Sq.ft. ) | 1 | |
| Shop | 12.66 Sq.mts. ( 136 Sq.ft. ) | 1 | |
| Shop | 13.09 Sq.mts. ( 141 Sq.ft. ) | 1 | |
| Shop | 14.23 Sq.mts. ( 153 Sq.ft. ) | 1 | |
| Shop | 15.35 Sq.mts. ( 165 Sq.ft. ) | 2 | |
60 total apartments / 57 apartments booked. 95% apartments booked. |
| Work Description in Building E Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| F Wing | Jun 2021 | 10 | 1 | 0 | 1 | 0 | 27 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 28.92 Sq.mts. ( 311 Sq.ft. ) | 9 | |
| 1 BHK | 31 Sq.mts. ( 334 Sq.ft. ) | 18 | |
| 1RK | 21.02 Sq.mts. ( 226 Sq.ft. ) | 18 | |
| 2 BHK | 45.1 Sq.mts. ( 485 Sq.ft. ) | 9 | |
54 total apartments / 45 apartments booked. 83% apartments booked. |
| Work Description in Building F Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Reliable Realtouch
for Project
Rg-A,B,E,F
last updated on
28 Jul 2025 as per information obtained from MARA RERA.