Project overview

Reliable Swapna Nagri-9,10,11,12 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000008641. Reliable Swapna Nagri-9,10,11,12 is located at Sno.232 Hno.4,S.No.234. This is a Ongoing being developed by Reliable Tarang.

Reliable Swapna Nagri-9,10,11,12 has 1 BHK & 1RK Apartments with carpet areas ranging from 208 to 279 Sq.ft. Carpet. The Project has total 61 of which 7 are currently available for sale.

Reliable Swapna Nagri-9,10,11,12 is being developed on a total land area of 93130 Sq.ft. out of which 54426 Sq.ft. i.e 58% is reserved for recreational purposes. Reliable Swapna Nagri-9,10,11,12 has 4 Wings / Towers Bldg No 10,Bldg No 11,Bldg No 12,Bldg No 9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Reliable Swapna Nagri-9,10,11,12
  • Location:
  • Sno.232 Hno.4,S.No.234
  • Const. Stage:
    Ongoing
  • Possession:
    25 Dec 2019
Developer Details

  • Developer:
    Reliable Tarang
  • Phone:
  • Address:
  • Reliable Prestige -1
Project RERA Details
MAHA REARA No: P99000008641
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Prithvi Arch Consultant Prop Vipul Adhia
Funding Bank HDFC BANK
Proposed Possession 25 Dec 2019
Revised Possession 25 Dec 2019
Extended Possession 31 Dec 2025
Litigations No Litigations
Last Modified 19 Jan 2024
Last Retrived 28 Jul 2025
Reliable Swapna Nagri-9,10,11,12 QR Code
Reliable Swapna Nagri-9,10,11,12
MahaRERA - P99000008641
Apartment Details & Configuration
TypeArea
1 BHK25.94 Sq.mts. ( 279 Sq.ft. )
1RK19.31 Sq.mts. ( 208 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Reliable Swapna Nagri-9,10,11,12last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space20% completed
20% Complete
Msedcl
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Consultant
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting50% completed
50% Complete
Own
Open Parking50% completed
50% Complete
Own
Sewerage (Chamber, Lines, Septic Tank , STP)70% completed
70% Complete
Own
Solid Waste Management And Disposal
Na
Storm Water Drains70% completed
70% Complete
Own
Street Lighting70% completed
70% Complete
Own
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting30% completed
30% Complete
Own
Water Supply
Own Vvcmc
Buildings / Wings in Reliable Swapna Nagri-9,10,11,12
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Reliable Swapna Nagri-9,10,11,12 by Reliable Taranglast updated on 28 Jul 2025 as per information obtained from MARA RERA.

93130 Sq. ft.

Project Area

54426 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

61 apartments in total
Total
61
Booked
54
Available
7

Saleable Area Statistics (Sq. ft.)

15391 Total
Total
15391
Booked
13579
Available
1812
Total 61 apartments in project. 54 apartments booked. 88% apartments booked.
Total 15391 Sq.ft. saleable area. 13579 saleable area booked.
88% area booked.

Bldg No 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 10Dec 202141000200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.94 Sq.mts. ( 279 Sq.ft. )12
9 Booked75% Booked
75% Booked
1RK19.31 Sq.mts. ( 208 Sq.ft. )4
4 Booked100% Booked
100% Booked
16 total apartments / 13 apartments booked. 81% apartments booked.
Work Description in Building Bldg No 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Bldg No 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 11Dec 202141010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.94 Sq.mts. ( 279 Sq.ft. )12
12 Booked100% Booked
100% Booked
1RK19.31 Sq.mts. ( 208 Sq.ft. )4
4 Booked100% Booked
100% Booked
16 total apartments / 16 apartments booked. 100% apartments booked.
Work Description in Building Bldg No 11Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Bldg No 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 12Dec 202141010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.94 Sq.mts. ( 279 Sq.ft. )6
6 Booked100% Booked
100% Booked
1RK19.31 Sq.mts. ( 208 Sq.ft. )7
7 Booked100% Booked
100% Booked
13 total apartments / 13 apartments booked. 100% apartments booked.
Work Description in Building Bldg No 12Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 9Dec 202141000140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.94 Sq.mts. ( 279 Sq.ft. )8
6 Booked75% Booked
75% Booked
1RK19.31 Sq.mts. ( 208 Sq.ft. )8
6 Booked75% Booked
75% Booked
16 total apartments / 12 apartments booked. 75% apartments booked.
Work Description in Building Bldg No 9Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Reliable Tarang
for Project
Reliable Swapna Nagri-9,10,11,12
last updated on 28 Jul 2025 as per information obtained from MARA RERA.