Project overview

Regency Sarvam Phase - 10 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700007704. Regency Sarvam Phase - 10 is located at 020Igevg0wjaotlav9lk3j6inq9iiibtwduqoqv/Kt07snuitoz80pcoglmhgu/5Hpqy1jglpbgwiqb8+Cnaqrues1exntajzutj8rdatva4jzrd0d4io2gxqmpmwrbhf8uk7bqsxl1bckqiambnna==. This is a Ongoing being developed by Regency Nirman Ltd.

Regency Sarvam Phase - 10 has OFFICE Apartments with carpet areas ranging from 9552 to 9552 Sq.ft. Carpet. The Project has total 127 of which 14 are currently available for sale.

Regency Sarvam Phase - 10 is being developed on a total land area of 94122 Sq.ft. out of which 9257 Sq.ft. i.e 10% is reserved for recreational purposes. Regency Sarvam Phase - 10 has 3 Wings / Towers Building No 29,Commercial Building No 1,Commercial Building No 2

ProjectDeveloperLocationPossession
Aryan ParadiesNidhi DevelopersH8ytq+0Hhcr7w8p6gdd14pemc1v9ks5qaernq8kvmu1zsuf1hvhnswhkaefhkjxpzrife6fcv8ku8cpwbshdqw==11-08-2023 00:00:00
Charms Paradise C WingCharms CorporationTukv2dj/4Lbjs07s0civlcbbccm7alko9fzurbdpvsy=31-03-2018 00:00:00
Charms Park Phase 1Charms CorporationOrsp65zvdtgvb3ftkpyboicom0lyyxbdioshux2zzxa=31-03-2018 00:00:00
Charms Park Phase 2Charms CorporationOrsp65zvdtgvb3ftkpyboicom0lyyxbdioshux2zzxa=30-12-2021 00:00:00
Shree Mahaganpati TowerMahesh Shyamsundar GoyalJkepslksjbm7nnge9l+H5m2i4wu6j8n2ghj1xyfmg3c=31-12-2020 00:00:00
Vihan ApartmentManoj Atmaram Pawar6Afmdhlj2atpoyhf5fe9q0za2x39bs8rleevkxd067acmjv/Pco1kezygckedgte31-12-2018 00:00:00
Virat Aangan Building No 1Siddhivinayak Developers4Xleqwrnxvr2fieqvtoah3xff8+M/Bseybuxnmh44ym=31-12-2019 00:00:00
Sai Siddhi Residency A WingSai Siddhi DevelopersVsdysblih3dwonn7/Ewain9v+Fan+Bdneevdtq1ap5c=30-06-2021 00:00:00
Sai ArcadeSaiprasad EnterprisesWfbpnhf6yayhi/Apa2ggcnvywjypian8qegnyrchblhvwy+5E395guru/Nnuny825f5mv1uf83w3ghejikhpcq==31-07-2019 00:00:00
Dattaram TowerM/S Suvarna Construction Company40006030-12-2022 00:00:00
Rusttagi Aarambha Phase-IiRustagi Estates Private LimitedRkiegqovrntwerp+Zxh66yswwee7j4m5vljsacebwbrbby2lzzjsjrzkjndgrudvgyvl+Vgtpuitfql02xbcrmvjxz8oebd3t/Azut6ozwe2lukfsps/Tqbeorkywntxar3aqabzcyj4w3kfbwf+Padetwmevme+T844dmnwykgcvwrw33hvos0bgl9q2zlvk1e/68Weeerywmdqcjj31nn5sz1nkiosaszyvpeeihc4mun3+F+Zh8edabaiidxnkpiqrnpdkvb+Ps5oqnhfmw==22-02-2026 00:00:00
Rusttagi Aarambha Phase- IRustagi Estates Private LimitedRkiegqovrntwerp+Zxh66yswwee7j4m5vljsacebwbrbby2lzzjsjrzkjndgrudvgyvl+Vgtpuitfql02xbcrmvjxz8oebd3t/Azut6ozwe2lukfsps/Tqbeorkywntxar3aqabzcyj4w3kfbwf+Padetwmevme+T844dmnwykgcvwrw33hvos0bgl9q2zlvk1e/68Weeerywmdqcjj31nn5sz1nkiosaszyvpeeihclocf4f7kb3hoaafxaiwev8zery0cw7qg2pozd6nfndq==22-02-2024 00:00:00
Mayfair VishwarajaMayfair Housing Private LimitedYgphttx3ddvs5ze9pw7xzfwnrn8gw5tddzxd6hwipos=30-06-2018 00:00:00
Shankheshwar Crystal-Phase 1Shankheshwar Kreaters9Abwmwmc7hiqdualiacwrq==31-12-2018 00:00:00
Uma GalaxyUmiya EnterprisesTzqmu8wme6m+3Nrsxk4pya==30-06-2021 00:00:00
Umiya Arcade Wing A And BUmiya Construction CompanyI89v4rrkwqzo1vu9qt6c+W==30-04-2018 00:00:00
Rukmini Garden Building No 2Maruti Raghunath JadhavGxnt/Gsl1gca9xwegt8+Ua==31-12-2018 00:00:00
Shree Siddhivinayak HeightsAjit Krishnan RatnamVglj1aflbta6cetfrrbzpfc9dtbelhrtsvj0j0n/Ylw=31-12-2018 00:00:00
Aastha EvershineM/S. Aastha RealtorsBjr36purzgjbcj1io/Iehwu3jm6v0nr/Cudlqdt9h6q=31-12-2018 00:00:00
hillcrest appartmentsaasanghar construction421605, Thane18-03-2016 00:00:00
Poonam HeightsVip Realtors Private LimitedJhgm0u1kkacv3wivwjx3gq==30-12-2023 00:00:00
Pramila AvenueNidhi AssociatesFr33t03mosmkrhwhbrdfsdotnxkgpbuptd+Dyfv6tic=11-12-2023 00:00:00
Mohan Heights -Phase 1Bhavani EnterprisesEwq+Upejj/Cv8mi8klnoqbkdg50glvdszgjasjxv3mta/E4auyin6bmzslziylzpwidglidaemw7mlsgaxg2q+Shxgswcsildacgw0p7afq=31-03-2018 00:00:00
Vedant Millenia Happiness Phase Ii Wing EMohan Hardasmal TharwaniNggtacl8thk2oshl/Bnr0yfk56srzdkffv15qkn1r4l09silw7mksig5wykplqbyrdd5lg+Fr3uh9ua5urlr/Q==31-12-2026 00:00:00
Aditya HeightsRatnakar Dharma PatilJn89vb7spg8siuy6db+Pmzxeyxlpwrrosw8c2uhepfc=30-06-2025 00:00:00
Marathe FortuneSaiji DevelopersUs+Rnuro/Rtojlhac2ck0w==31-03-2019 00:00:00
Kuber GanrajKuber Abhiraj InfraLoj+Dgqhb7zdvda1iak+5G==31-12-2019 00:00:00
EkdantayR K Buildcon2Bnjqwdwhs93lxzwpvftag==31-12-2017 00:00:00
Vedant Millenia Happiness Phase Ii Wing CMohan Hardasmal TharwaniVktefdbdjcmpdtjrioedjh6qmfr2drrkikjhd2flh4fb8u102o1yvudi8txd3qr431-12-2027 00:00:00
Kasturi Home TowerShree Morya AssociatesJr0egffsbg9gdq3d0v7wmju9jfloi+Tuqfebntzsxlnsgebqyp0b1gazyxvvr1gdyckorixyj+S7a5x31sognq==08-09-2025 00:00:00
Aster A Wing Rucha VatikaMilan Housing Complex Pvt. Ltd.Kahcmeopmtqkwe253gvglg==31-05-2018 00:00:00
Mandakini ResidencyMandakini Realtors42160531-05-2016 00:00:00
Regency Sarvam Phase - 9Regency Nirman Ltd020Igevg0wjaotlav9lk3j6inq9iiibtwduqoqv/Kt07snuitoz80pcoglmhgu/5Hpqy1jglpbgwiqb8+Cnaqrues1exntajzutj8rdatva4jzrd0d4io2gxqmpmwrbhf8uk7bqsxl1bckqiambnna==30-06-2018 00:00:00
Rameshwaram Palace-BPyarelal Bhrigunath SinghXasulh2p9wsaunvpjvzp1g==31-12-2019 00:00:00
Regency Sarvam Phase - 10Regency Nirman Ltd020Igevg0wjaotlav9lk3j6inq9iiibtwduqoqv/Kt07snuitoz80pcoglmhgu/5Hpqy1jglpbgwiqb8+Cnaqrues1exntajzutj8rdatva4jzrd0d4io2gxqmpmwrbhf8uk7bqsxl1bckqiambnna==31-12-2019 00:00:00
Empress C WingVenture BuildersLo9ka6sgoluitkbbr4b7ow==30-09-2020 00:00:00
Soham PlazaSaibhakti BuildersTw+Xtp8spcicwvss0rzpgx5llaqyeeeqodhw5uomye8qgrmfggi7iu/D0qbxseuo31-12-2017 00:00:00
Anand HomeM/S. Morya GroupLpq2zdwla3vdcyzd8ixltq==31-03-2025 00:00:00
Marathe EmpireSaiji BuildersQrnamkwsriadx53zxymrnq==30-09-2020 00:00:00
Shree Ganraya ApartmentsMahesh Shyamsundar GoyalQlb0kmqghxp5wdagkps/Oq==31-12-2018 00:00:00
Anand Homes- Phase 2M/S. Morya GroupLpq2zdwla3vdcyzd8ixltq==01-06-2026 00:00:00
Vedant Millenia Happiness Phase Ii Wing DMohan Hardasmal TharwaniBcsj5egq86/Plarmgm+2Xhihufqsdi4nobezi3i439n9oaxe1leyqqfohai5vbaj31-07-2028 00:00:00
Adwait AvanyaAdwait Real Estate31-12-2029 00:00:00
Padamavati Royal Phase 2Sujeet Kumar Jeetpratap Singh81/1, 98/3A28-11-2025 00:00:00
SHANKHESHWAR CRYSTAL PHASE 2SHANKHESHWAR KREATERSSurvey No 6/2 And Survey No 73 Hissa No 5/2/130-12-2024 00:00:00
Ganadish Krupa PalaceGanadish Krupa PalaceW5e1tyngzhpijzpyux3hpq==18-03-2018 00:00:00
Om Sai SiddhiAshtavinayak EnterprisesZdc4k2wc8scsiiohwskgs4bx2bxonuo4+Zwor/Lxywg=31-12-2019 00:00:00
Sadguru Landmark - Wing A And ESadguru Group421605, Thane, Titwala30-12-2022 00:00:00
Ved ResidencyOm CorporatinU4cxsl8aoaqfdvvqcvqmvogdx7pszud7azfv2p2uglfncnxbw8sow+Oyqkavkpfz30-12-2021 00:00:00
Rusttagi Aarambha 2.0RUSTAGI ESTATES PRIVATE LIMITED101/1/D30-11-2026 00:00:00
The NatureUma InfratechS. No. 147 Hissa No. 2/2/1, 2/A30-06-2030 00:00:00
Project Details
  • Project:
    Regency Sarvam Phase - 10
  • Location:
  • 020Igevg0wjaotlav9lk3j6inq9iiibtwduqoqv/Kt07snuitoz80pcoglmhgu/5Hpqy1jglpbgwiqb8+Cnaqrues1exntajzutj8rdatva4jzrd0d4io2gxqmpmwrbhf8uk7bqsxl1bckqiambnna==
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Regency Nirman Ltd
  • Phone:
  • Address:
  • Regency House
Project RERA Details
MAHA REARA No: P51700007704
Project Type Others
RERA Project Status Ongoing
Architect Vitan Consultants
Funding Bank SARASWAT COOPERATIVE BANK LIMITED
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 17 Aug 2017
Last Retrived 13 Feb 2026
Regency Sarvam Phase - 10 QR Code
Regency Sarvam Phase - 10
MahaRERA - P51700007704
Apartment Details & Configuration
TypeArea
1 BHK COMPACT34.81 Sq.mts. ( 375 Sq.ft. )
OFFICE436.4 Sq.mts. ( 4697 Sq.ft. )
OFFICE887.38 Sq.mts. ( 9552 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Regency Sarvam Phase - 10last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Prior To Oc
Community Buildings100% completed
95% Complete
Prior To Oc
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Prior To Oc
Energy management100% completed
95% Complete
Prior To Oc
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Prior To Oc
Landscaping & Tree Planting100% completed
95% Complete
Prior To Oc
Open Parking100% completed
95% Complete
Prior To Oc
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Prior To Oc
Solid Waste Management And Disposal100% completed
95% Complete
Prior To Oc
Storm Water Drains100% completed
95% Complete
Prior To Oc
Street Lighting100% completed
95% Complete
Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Prior To Oc
Water Conservation, Rain water Harvesting100% completed
95% Complete
Prior To Oc
Water Supply100% completed
95% Complete
Prior To Oc
Buildings / Wings in Regency Sarvam Phase - 10
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Regency Sarvam Phase - 10 by Regency Nirman Ltdlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

94122 Sq. ft.

Project Area

9257 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

127 apartments in total
Total
127
Booked
113
Available
14

Saleable Area Statistics (Sq. ft.)

61086 Total
Total
61086
Booked
42341
Available
18746
Total 127 apartments in project. 113 apartments booked. 88% apartments booked.
Total 61086 Sq.ft. saleable area. 42341 saleable area booked.
69% area booked.

Building No 29

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 29Dec 20191710102322
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK COMPACT34.81 Sq.mts. ( 375 Sq.ft. )125
113 Booked90% Booked
90% Booked
125 total apartments / 113 apartments booked. 90% apartments booked.
Work Description in Building Building No 29Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Commercial Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Commercial Building No 1Dec 20192100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
OFFICE436.4 Sq.mts. ( 4697 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Commercial Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Commercial Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Commercial Building No 2Dec 20192100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
OFFICE887.38 Sq.mts. ( 9552 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Commercial Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Regency Nirman Ltd
for Project
Regency Sarvam Phase - 10
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation