Project overview

Raunak City Sector Ii - B7 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006182. Raunak City Sector Ii - B7 is located at 51/5 51/6 64/1/1 64/1/1 64/4 64/5 65/4 65/5. This is a Ongoing being developed by Raunak Corporation.

Raunak City Sector Ii - B7 has 1 BHK & SHOP Apartments with carpet areas ranging from 271 to 391 Sq.ft. Carpet. The Project has total 90 of which 16 are currently available for sale.

Raunak City Sector Ii - B7 is being developed on a total land area of 8966 Sq.ft. Raunak City Sector Ii - B7 has 1 Wings / Towers Raunak City Sector Ii Building B7

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Raunak City Sector Ii - B7
  • Location:
  • 51/5 51/6 64/1/1 64/1/1 64/4 64/5 65/4 65/5
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Raunak Corporation
  • Phone:
  • Address:
  • Kilachand Building
Project RERA Details
MAHA REARA No: P51700006182
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Design Consortium
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2017
Last Retrived 26 Jul 2025
Raunak City Sector Ii - B7 QR Code
Raunak City Sector Ii - B7
MahaRERA - P51700006182
Apartment Details & Configuration
TypeArea
1 BHK36.32 Sq.mts. ( 391 Sq.ft. )
1 BHK34.93 Sq.mts. ( 376 Sq.ft. )
SHOP35.3 Sq.mts. ( 380 Sq.ft. )
SHOP25.18 Sq.mts. ( 271 Sq.ft. )
SHOP28.8 Sq.mts. ( 310 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Raunak City Sector Ii - B7last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings100% completed
95% Complete
Completed
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Electric Sub Station Will Be Common For All Buildi
Energy management100% completed
95% Complete
Solar Panel Completed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Pipelines Only. Water Will Be Provided By Kdmc
Buildings / Wings in Raunak City Sector Ii - B7
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Raunak City Sector Ii - B7 by Raunak Corporationlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8966 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

90 apartments in total
Total
90
Booked
74
Available
16

Saleable Area Statistics (Sq. ft.)

34076 Total
Total
34076
Booked
28197
Available
5879
Total 90 apartments in project. 74 apartments booked. 82% apartments booked.
Total 34076 Sq.ft. saleable area. 28197 saleable area booked.
83% area booked.

Raunak City Sector Ii Building B7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Raunak City Sector Ii Building B7Dec 2018161010032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.32 Sq.mts. ( 391 Sq.ft. )27
25 Booked92% Booked
92% Booked
1 BHK34.93 Sq.mts. ( 376 Sq.ft. )60
49 Booked81% Booked
81% Booked
SHOP35.3 Sq.mts. ( 380 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP25.18 Sq.mts. ( 271 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP28.8 Sq.mts. ( 310 Sq.ft. )1
None Booked0% Booked
0% Booked
90 total apartments / 74 apartments booked. 82% apartments booked.
Work Description in Building Raunak City Sector Ii Building B7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Raunak Corporation
for Project
Raunak City Sector Ii - B7
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation