Project overview

Ramdev Vaayu is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700010095. Ramdev Vaayu is located at New Survey No 251 And 263 Hissa No 1. This is a Ongoing being developed by Manoj Motaji Purohit.

Ramdev Vaayu has Residential Apartments with carpet areas ranging from 381 to 532 Sq.ft. Carpet. The Project has total 29 of which 29 are currently available for sale.

Ramdev Vaayu is being developed on a total land area of 141547 Sq.ft. out of which 10587 Sq.ft. i.e 7% is reserved for recreational purposes. Ramdev Vaayu has 1 Wings / Towers Ramdev Vaayu

ProjectDeveloperLocationPossession
Ostwal DarshanShree Ostwal Builders LtdSurvey No 154 Hissa No. 1A30-12-2023 00:00:00
Span Trident Wing BSpan VentureOld Survey No 663 New Survey No 23730-12-2027 00:00:00
Jak CelebrityJak InfraS No 227, H No 1, New S No2830-12-2021 00:00:00
New Yashodeep Co-Op. Hsg. Soc. LtdH K Constructions1551 Pt01-05-2019 00:00:00
Ramdev VaayuManoj Motaji PurohitNew Survey No 251 And 263 Hissa No 131-03-2018 00:00:00
OpulenceSonam Spark Infra Private LimitedS.No.327/328/339/340/34131-12-2027 00:00:00
N G Grand Empire Phase IiRna Builders (Ng)219 2 Pt 3B Pt 230 1,2,3 Pt31-12-2026 00:00:00
N G Grand Empire Phase IRna Builders (Ng)40110731-12-2026 00:00:00
Dev AanganSdc Properties Private Limited1681A,1682A,1683A,1684A,1685A30-12-2022 00:00:00
Mahadev ParadiseNandkumar Mahadev Patil317/1331-07-2019 00:00:00
Salasar AshishSalangpur RealtyOld Survey No 565, New Survey No 22014-03-2018 00:00:00
Darshana HeightsSudama Construction Co.Old 563/3 564/2 565/12 New 205/3 221/2 220/1230-12-2024 00:00:00
Gautam EstatesGautam EstatesThane, 40110131-12-2021 00:00:00
KasturiM/S Evergreen ConstructionOld Survey No 573/7,680/2 New Survey No 270/7,271/230-12-2021 00:00:00
Tirupati ComplexTirupati DevelopersOld Sno 349 New 13 Hno 2 Cts No 151430-12-2022 00:00:00
The Centre ParkSalasar Unique Realtors LlpNew 114/1,2 - 113/130-12-2023 00:00:00
Vitrag OrbitGoldfield Assosciates401105, Thane31-07-2018 00:00:00
D. G. MarketC9 Buildcon1015-07-2019 00:00:00
Radha KrishnaRamprasad Sohanlal Agrawal277/7C, 275/1, 2Pt,2Pt 3,5,6, 274/1,2,3,5,6, 271/1,2,3,4,5, 273/1,5,8, 213/1Pt, 1Pt-2,330-12-2022 00:00:00
Silver SquareRamdev Venkatesh HousingSno 558 Old 208 Sno New Hno 1, Sno 568 Old 218 New Hno 4,531-12-2026 00:00:00
Sai Hanuman Tower B WingOm Sai Baba BuildersOld Sno 221 New Sno 5 Hno 1 Part31-05-2025 00:00:00
Unique Estate Type-C Wing DSiddhivinayak DevelopersOld Sno 400 New Sno 58 Hno 9,13,14,16,17,19,20,21A31-03-2027 00:00:00
Ranuja Ramdev C TypeRanuja Ramdev C TypeOld Survey No 228, New Sno. 2731-12-2026 00:00:00
Kasturi Vandana EmpireTirupati Estate Developers LlpSurvey No 118(Old), 113(New), Hissa No31-12-2029 00:00:00
Project Details
  • Project:
    Ramdev Vaayu
  • Location:
  • New Survey No 251 And 263 Hissa No 1
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2018
Developer Details

  • Developer:
    Manoj Motaji Purohit
  • Phone:
  • Address:
  • Arjun Niwas Bungalow
Project RERA Details
MAHA REARA No: P51700010095
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Anish And Associates
Funding Bank INDUSIND BANK
Proposed Possession 31 Mar 2018
Revised Possession 31 Mar 2018
Extended Possession
Litigations No Litigations
Last Modified 24 Aug 2017
Last Retrived 26 Jul 2025
Ramdev Vaayu QR Code
Ramdev Vaayu
MahaRERA - P51700010095
Apartment Details & Configuration
TypeArea
Residential35.39 Sq.mts. ( 381 Sq.ft. )
Residential49.4 Sq.mts. ( 532 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ramdev Vaayulast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Wip
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
By Reliance Infrastructure
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
0
Landscaping & Tree Planting100% completed
95% Complete
0
Open Parking100% completed
95% Complete
0
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
0
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
0
Street Lighting100% completed
95% Complete
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Harvesting
Water Supply
By Mbmc After Oc
Buildings / Wings in Ramdev Vaayu
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ramdev Vaayu by Manoj Motaji Purohitlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

141547 Sq. ft.

Project Area

10587 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

29 apartments in total
Total
29
Booked
0
Available
29

Saleable Area Statistics (Sq. ft.)

12555 Total
Total
12555
Booked
0
Available
12555
Total 29 apartments in project. 0 apartments booked. 0% apartments booked.
Total 12555 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Ramdev Vaayu

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ramdev VaayuJan 190011101051
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential35.39 Sq.mts. ( 381 Sq.ft. )19
None Booked0% Booked
0% Booked
Residential49.4 Sq.mts. ( 532 Sq.ft. )10
None Booked0% Booked
0% Booked
29 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ramdev VaayuCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Manoj Motaji Purohit
for Project
Ramdev Vaayu
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation