Project overview

ProjectDeveloperLocationPossession
Project Details
  • Project:
  • Location:
  • Const. Stage:
  • Possession:
Developer Details

  • Developer:
  • Phone:
  • Address:
Project RERA Details
MAHA REARA No:
Project Type
RERA Project Status
Architect
Funding Bank
Proposed Possession
Revised Possession
Extended Possession
Litigations
Last Modified
Last Retrived
Apartment Details & Configuration
TypeArea
1 BHK38.09 Sq.mts. ( 410 Sq.ft. )
1 BHK40.32 Sq.mts. ( 434 Sq.ft. )
1 BHK41.34 Sq.mts. ( 445 Sq.ft. )
1 BHK41.99 Sq.mts. ( 452 Sq.ft. )
1RK24.06 Sq.mts. ( 259 Sq.ft. )
1RK24.99 Sq.mts. ( 269 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on as per information obtained from MARA RERA.

Project Area

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

42 apartments in total
Total
42
Booked
0
Available
42

Saleable Area Statistics (Sq. ft.)

15883 Total
Total
15883
Booked
0
Available
15883
Total 42 apartments in project. 0 apartments booked. 0% apartments booked.
Total 15883 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Ram Ratan Complex - B Wing - Laxman

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ram Ratan Complex - B Wing - LaxmanDec 20218101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.09 Sq.mts. ( 410 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK40.32 Sq.mts. ( 434 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK41.34 Sq.mts. ( 445 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK41.99 Sq.mts. ( 452 Sq.ft. )7
None Booked0% Booked
0% Booked
1RK24.06 Sq.mts. ( 259 Sq.ft. )7
None Booked0% Booked
0% Booked
1RK24.99 Sq.mts. ( 269 Sq.ft. )7
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ram Ratan Complex - B Wing - LaxmanCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
for Project
last updated on as per information obtained from MARA RERA.
Name Company Location Mobile Designation