Project overview

Rakhi Tower Phase 3 12Th To 15Th Floor Part is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800027354. Rakhi Tower Phase 3 12Th To 15Th Floor Part is located at 400066, Mumbai Suburban, Borivali. This is a New Project being developed by Western Developments.

Rakhi Tower Phase 3 12Th To 15Th Floor Part has 1 BHK Apartments with carpet areas ranging from 385 to 385 Sq.ft. Carpet. The Project has total 7 of which 3 are currently available for sale.

Rakhi Tower Phase 3 12Th To 15Th Floor Part is being developed on a total land area of 13361 Sq.ft. Rakhi Tower Phase 3 12Th To 15Th Floor Part has 1 Wings / Towers Rakhi Tower Phase 3 12Th To 15Th Floor Part

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Rakhi Tower Phase 3 12Th To 15Th Floor Part
  • Location:
  • 400066, Mumbai Suburban, Borivali
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2026
Developer Details

  • Developer:
    Western Developments
  • Phone:
  • Address:
  • Room Number-2, Kotusing Chawl, Kasturba Road No 2, Near Main Kasturba Road, Borivali East, 400066
Project RERA Details
MAHA REARA No: P51800027354
Project Type Others
RERA Project Status New Project
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2026
Revised Possession
Extended Possession
Litigations Yes
Last Modified 19 May 2022
Last Retrived 28 Jul 2025
Rakhi Tower Phase 3 12Th To 15Th Floor Part QR Code
Rakhi Tower Phase 3 12Th To 15Th Floor Part
MahaRERA - P51800027354
Apartment Details & Configuration
TypeArea
1 BHK35.76 Sq.mts. ( 385 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rakhi Tower Phase 3 12Th To 15Th Floor Partlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting100% completed
95% Complete
Done
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply100% completed
95% Complete
Done
Buildings / Wings in Rakhi Tower Phase 3 12Th To 15Th Floor Part
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rakhi Tower Phase 3 12Th To 15Th Floor Part by Western Developmentslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

13361 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

7 apartments in total
Total
7
Booked
4
Available
3

Saleable Area Statistics (Sq. ft.)

2694 Total
Total
2694
Booked
1540
Available
1155
Total 7 apartments in project. 4 apartments booked. 57% apartments booked.
Total 2694 Sq.ft. saleable area. 1540 saleable area booked.
57% area booked.

Rakhi Tower Phase 3 12Th To 15Th Floor Part

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rakhi Tower Phase 3 12Th To 15Th Floor PartDec 20254000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.76 Sq.mts. ( 385 Sq.ft. )7
4 Booked57% Booked
57% Booked
7 total apartments / 4 apartments booked. 57% apartments booked.
Work Description in Building Rakhi Tower Phase 3 12Th To 15Th Floor PartCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Western Developments
for Project
Rakhi Tower Phase 3 12Th To 15Th Floor Part
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation