Project overview

Rakhi Tower Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800005504. Rakhi Tower Phase 1 is located at 332A 332B 332C 332D 332E. This is a Ongoing being developed by Western Developments.

Rakhi Tower Phase 1 has 1 BHK & SHOP Apartments with carpet areas ranging from 141 to 101 Sq.ft. Carpet. The Project has total 92 of which 16 are currently available for sale.

Rakhi Tower Phase 1 is being developed on a total land area of 13361 Sq.ft. out of which 807 Sq.ft. i.e 6% is reserved for recreational purposes. Rakhi Tower Phase 1 has 2 Wings / Towers Phase 1 A Wing,Phase 1 B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Rakhi Tower Phase 1
  • Location:
  • 332A 332B 332C 332D 332E
  • Const. Stage:
    Ongoing
  • Possession:
    21 Dec 2019
Developer Details

  • Developer:
    Western Developments
  • Phone:
  • Address:
  • Kotusing Chawl
Project RERA Details
MAHA REARA No: P51800005504
Project Type Others
RERA Project Status Ongoing
Architect Sanjay B Shah
Funding Bank HDFC BANK
Proposed Possession 21 Dec 2019
Revised Possession 21 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 11 Aug 2017
Last Retrived 26 Jul 2025
Rakhi Tower Phase 1 QR Code
Rakhi Tower Phase 1
MahaRERA - P51800005504
Apartment Details & Configuration
TypeArea
1 BHK25 Sq.mts. ( 269 Sq.ft. )
SHOP61.4 Sq.mts. ( 661 Sq.ft. )
SHOP13.19 Sq.mts. ( 142 Sq.ft. )
SHOP16.8 Sq.mts. ( 181 Sq.ft. )
SHOP20.93 Sq.mts. ( 225 Sq.ft. )
1 BHK35.77 Sq.mts. ( 385 Sq.ft. )
SHOP9.38 Sq.mts. ( 101 Sq.ft. )
SHOP13.1 Sq.mts. ( 141 Sq.ft. )
SHOP25.36 Sq.mts. ( 273 Sq.ft. )
SHOP32.01 Sq.mts. ( 345 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rakhi Tower Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station92% completed
92% Complete
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements92% completed
92% Complete
Work In Progress
Landscaping & Tree Planting
Yet To Start
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Yet To Start
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Rakhi Tower Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rakhi Tower Phase 1 by Western Developmentslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

13361 Sq. ft.

Project Area

807 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

92 apartments in total
Total
92
Booked
76
Available
16

Saleable Area Statistics (Sq. ft.)

29846 Total
Total
29846
Booked
23801
Available
6045
Total 92 apartments in project. 76 apartments booked. 82% apartments booked.
Total 29846 Sq.ft. saleable area. 23801 saleable area booked.
80% area booked.

Phase 1 A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Phase 1 A WingJan 19009100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25 Sq.mts. ( 269 Sq.ft. )37
36 Booked97% Booked
97% Booked
SHOP61.4 Sq.mts. ( 661 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.19 Sq.mts. ( 142 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.8 Sq.mts. ( 181 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP20.93 Sq.mts. ( 225 Sq.ft. )2
2 Booked100% Booked
100% Booked
42 total apartments / 41 apartments booked. 97% apartments booked.
Work Description in Building Phase 1 A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Phase 1 B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Phase 1 B WingDec 201916100014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.77 Sq.mts. ( 385 Sq.ft. )45
30 Booked66% Booked
66% Booked
SHOP9.38 Sq.mts. ( 101 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.1 Sq.mts. ( 141 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP25 Sq.mts. ( 269 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP25.36 Sq.mts. ( 273 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP32.01 Sq.mts. ( 345 Sq.ft. )1
1 Booked100% Booked
100% Booked
50 total apartments / 35 apartments booked. 70% apartments booked.
Work Description in Building Phase 1 B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress92% done
92% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress92% done
92% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Western Developments
for Project
Rakhi Tower Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation