Project overview

Rajmandir Gardens is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000016916. Rajmandir Gardens is located at Gut No-79, 80A, 80B. This is a New being developed by Raj Mandir Reality.

Rajmandir Gardens has FLAT Apartments with carpet areas ranging from 323 to 517 Sq.ft. Carpet. The Project has total 243 of which 197 are currently available for sale.

Rajmandir Gardens is being developed on a total land area of 119948 Sq.ft. Rajmandir Gardens has 10 Wings / Towers A Wing,B Wing,C Wing,D Wing,E Wing,F Wing,G Wing,H Wing,I Wing,J Wing

ProjectDeveloperLocationPossession
Mahadeep Building No. 1 Type A And Type A 2 Wing A And Wing BMahadeep Builders And DevelopersSurvey No. 154/A. 185, 18731-12-2019 00:00:00
Mukunda ParkSurendrakumar SinghVillage Umroli, Taluka Palghar Dist. Palghar, 40140431-12-2019 00:00:00
Abhishek ApartmentSandeep Vyas40140430-12-2022 00:00:00
Swapnalok Residency Phase Ii Riddhi Building Wing B And CDhanesh Chand PatwaGut No 462/B30-12-2020 00:00:00
Comfort Residency Bldg 4 Wing A And Bldg 5 Wing AComfort InfraPlot Bearing Gut No 19530-03-2022 00:00:00
Parasnath TownshipShreenath Enterprises392 393 394A 394B31-03-2020 00:00:00
Swapnalok Residency Phase IiAshapura Builders & DevelopersGhut No 46231-12-2018 00:00:00
Gokul Dham AptSaakar EnterprisesGut No 154/B,184/2,18506-12-2019 00:00:00
Adore Gardens Bldg No 2 And 3Satgharebuildcon Pvt.Ltd61 And 6230-12-2025 00:00:00
Ideal Park Bldg No 2Shree Ganesh EnterprisesUmroli East31-10-2019 00:00:00
Ideal ResidencyShree Shiv Shakti Builders And DevelopersStation Road30-06-2022 00:00:00
Building No.1, Ideal Garden, Type B1B, Wing BRajkumar Vishwakarma401404, Umroli, Palghar31-07-2019 00:00:00
Adore GardensAdore Realty LlpPalghar, Umroli, 40140430-12-2024 00:00:00
Ideal GardenShree Shiv Kripa Builders &Amp; Developer401404, Palghar, Umroli Road30-12-2019 00:00:00
Adore-4Ananta ContructionOpp. Umroli Station30-09-2020 00:00:00
Vrindhavan ComplexHolystone Construction Private Limited12630-12-2023 00:00:00
Ideal ResidencyIdeal PropertiesPalghar30-06-2022 00:00:00
Veer 2Veer Global Infraconstruction Limited154/A, 185, 18731-12-2019 00:00:00
Triveni LotusTrivenilandspacePalghar30-06-2018 00:00:00
Parasnath NagariShreenath EnterprisesUmroli31-08-2022 00:00:00
Rajmandir GardensRaj Mandir RealityGut No-79, 80A, 80B30-12-2023 00:00:00
Vajreshwari ApartmentShree Adeshwar BuildcomGut No 19330-12-2022 00:00:00
Godavari ParkGanesh Krupa DevelopersS N 71/B/130-06-2022 00:00:00
Ideal Avenue Building No 3 Type B1d Wing BShree Sai Samarth Builders And DevelopersSurvey No 179, 180, 18130-12-2022 00:00:00
Sai Yashodhan Bldg No.1Deepak Sadanand Hanchate14231-03-2018 00:00:00
Nest LotusNest Enterprises13331-12-2018 00:00:00
Gunaji Vasudeo ComplexPurshotam Gopaldas SehwaniG57ut No31-12-2019 00:00:00
Abhishek AppartmentOm Shri Sai ConstructionStation Road31-12-2020 00:00:00
Parasnath Garden-S No 182-3 196-7Shreenath EnterprisesUmroli31-08-2022 00:00:00
Diya EnclaveMegha Shah401404, Palghar31-10-2017 00:00:00
Parasnath Garden- Sno 200-1-2Shreenath EnterprisesS No 200-201-202-Umaroli30-09-2026 00:00:00
Aadeshwar-2Shree Adeshwar Buildcom154/A, 185,18730-12-2020 00:00:00
Shiv KrupaShivaay RealtyGut No.184/A, Village Umroli, District Palghar28-11-2022 00:00:00
Sadguru EmpireGuru Prasad Construction CompanyPalghar, 40140431-12-2024 00:00:00
Ajayraj ExcellencyAjayraj Realtors Pvt Ltd401404, Palghar31-07-2018 00:00:00
Renuka Appartment Type GAaryan SinghPalghar31-01-2019 00:00:00
Shree PuramVastu RealitiesGut No-190,19231-03-2019 00:00:00
Ideal City Building No3 Basant KunjDevbhoomi Builders And Developers401404, Palghar30-11-2018 00:00:00
Ideal GardenGajanan Builders & Developers179/180/18131-03-2019 00:00:00
Ideal EnclaveT. L. Realities232A230-09-2024 00:00:00
Project Details
  • Project:
    Rajmandir Gardens
  • Location:
  • Gut No-79, 80A, 80B
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Raj Mandir Reality
  • Phone:
  • Address:
  • Sahyadri Apartment
Project RERA Details
MAHA REARA No: P99000016916
Project Type Residential / Group Housing
RERA Project Status New
Architect Kiran Shivde
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Jan 2025
Last Retrived 28 Jul 2025
Rajmandir Gardens QR Code
Rajmandir Gardens
MahaRERA - P99000016916
Apartment Details & Configuration
TypeArea
1 BHK30 Sq.mts. ( 323 Sq.ft. )
2 BHK50 Sq.mts. ( 538 Sq.ft. )
FLAT60 Sq.mts. ( 646 Sq.ft. )
FLAT70 Sq.mts. ( 753 Sq.ft. )
FLAT49 Sq.mts. ( 527 Sq.ft. )
FLAT29 Sq.mts. ( 312 Sq.ft. )
FLAT25 Sq.mts. ( 269 Sq.ft. )
FLAT37 Sq.mts. ( 398 Sq.ft. )
FLAT38 Sq.mts. ( 409 Sq.ft. )
FLAT56 Sq.mts. ( 603 Sq.ft. )
FLAT67 Sq.mts. ( 721 Sq.ft. )
FLAT33 Sq.mts. ( 355 Sq.ft. )
FLAT43 Sq.mts. ( 463 Sq.ft. )
FLAT48 Sq.mts. ( 517 Sq.ft. )
FLAT58 Sq.mts. ( 624 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rajmandir Gardenslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room Will Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Landscaping Will Be Done
Open Parking
Open Parking Available
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Sewerage Will Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting Will Be Done
Water Supply
Borewell Will Be Provided
Buildings / Wings in Rajmandir Gardens
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rajmandir Gardens by Raj Mandir Realitylast updated on 28 Jul 2025 as per information obtained from MARA RERA.

119948 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

243 apartments in total
Total
243
Booked
46
Available
197

Saleable Area Statistics (Sq. ft.)

114281 Total
Total
114281
Booked
24241
Available
90041
Total 243 apartments in project. 46 apartments booked. 18% apartments booked.
Total 114281 Sq.ft. saleable area. 24241 saleable area booked.
21% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 20222100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK50 Sq.mts. ( 538 Sq.ft. )1
None Booked0% Booked
0% Booked
FLAT50 Sq.mts. ( 538 Sq.ft. )10
10 Booked100% Booked
100% Booked
FLAT60 Sq.mts. ( 646 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT70 Sq.mts. ( 753 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT49 Sq.mts. ( 527 Sq.ft. )2
2 Booked100% Booked
100% Booked
19 total apartments / 16 apartments booked. 84% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 20222100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT29 Sq.mts. ( 312 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT49 Sq.mts. ( 527 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT50 Sq.mts. ( 538 Sq.ft. )12
7 Booked58% Booked
58% Booked
FLAT60 Sq.mts. ( 646 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT70 Sq.mts. ( 753 Sq.ft. )2
2 Booked100% Booked
100% Booked
20 total apartments / 13 apartments booked. 65% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT25 Sq.mts. ( 269 Sq.ft. )8
None Booked0% Booked
0% Booked
FLAT37 Sq.mts. ( 398 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT38 Sq.mts. ( 409 Sq.ft. )16
8 Booked50% Booked
50% Booked
FLAT56 Sq.mts. ( 603 Sq.ft. )2
1 Booked50% Booked
50% Booked
FLAT67 Sq.mts. ( 721 Sq.ft. )2
None Booked0% Booked
0% Booked
30 total apartments / 9 apartments booked. 30% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress83% done
83% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT25 Sq.mts. ( 269 Sq.ft. )8
None Booked0% Booked
0% Booked
FLAT37 Sq.mts. ( 398 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT38 Sq.mts. ( 409 Sq.ft. )16
6 Booked37% Booked
37% Booked
FLAT56 Sq.mts. ( 603 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT67 Sq.mts. ( 721 Sq.ft. )2
None Booked0% Booked
0% Booked
30 total apartments / 6 apartments booked. 20% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress33% done
33% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingDec 20224100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT33 Sq.mts. ( 355 Sq.ft. )12
None Booked0% Booked
0% Booked
FLAT38 Sq.mts. ( 409 Sq.ft. )6
None Booked0% Booked
0% Booked
FLAT43 Sq.mts. ( 463 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT48 Sq.mts. ( 517 Sq.ft. )2
1 Booked50% Booked
50% Booked
22 total apartments / 1 apartments booked. 4% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingDec 20224100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT30 Sq.mts. ( 323 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT33 Sq.mts. ( 355 Sq.ft. )4
None Booked0% Booked
0% Booked
FLAT38 Sq.mts. ( 409 Sq.ft. )12
None Booked0% Booked
0% Booked
FLAT43 Sq.mts. ( 463 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT48 Sq.mts. ( 517 Sq.ft. )2
None Booked0% Booked
0% Booked
22 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G WingDec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT50 Sq.mts. ( 538 Sq.ft. )15
None Booked0% Booked
0% Booked
FLAT58 Sq.mts. ( 624 Sq.ft. )16
None Booked0% Booked
0% Booked
31 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building G WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress66% done
66% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress66% done
66% Booked

H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H WingDec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50 Sq.mts. ( 538 Sq.ft. )12
2 BHK58 Sq.mts. ( 624 Sq.ft. )12
None Booked0% Booked
0% Booked
24 total apartments / 1 apartments booked. 4% apartments booked.
Work Description in Building H WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress66% done
66% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress66% done
66% Booked

I Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
I WingDec 20224100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38 Sq.mts. ( 409 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK43 Sq.mts. ( 463 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK48 Sq.mts. ( 517 Sq.ft. )5
None Booked0% Booked
0% Booked
FLAT33 Sq.mts. ( 355 Sq.ft. )6
None Booked0% Booked
0% Booked
25 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building I WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

J Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
J WingDec 20224100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT30 Sq.mts. ( 323 Sq.ft. )1
None Booked0% Booked
0% Booked
FLAT33 Sq.mts. ( 355 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT38 Sq.mts. ( 409 Sq.ft. )12
None Booked0% Booked
0% Booked
FLAT43 Sq.mts. ( 463 Sq.ft. )1
None Booked0% Booked
0% Booked
FLAT48 Sq.mts. ( 517 Sq.ft. )4
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building J WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Raj Mandir Reality
for Project
Rajmandir Gardens
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation