Project overview

Rajhans Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000003055. Rajhans Enclave is located at Palghar, 401501. This is a On-Going Project being developed by Rajhans Buildcom.

Rajhans Enclave has FLAT Apartments with carpet areas ranging from 302 to 429 Sq.ft. Carpet. The Project has total 36 of which 13 are currently available for sale.

Rajhans Enclave is being developed on a total land area of 19608 Sq.ft. Rajhans Enclave has 1 Wings / Towers Rajhans Enclave

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Rajhans Enclave
  • Location:
  • Palghar, 401501
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Jul 2019
Developer Details

  • Developer:
    Rajhans Buildcom
  • Phone:
  • Address:
  • 4, Sanjari Apt, Ambadi Road, Behind Panchvati Hotel, Vasai, 401202
Project RERA Details
MAHA REARA No: P99000003055
Project Type Residential
RERA Project Status On-Going Project
Funding Bank IDBI BANK
Proposed Possession 31 Jul 2019
Revised Possession 31 Jan 2021
Extended Possession
Litigations No Litigations
Last Modified 04 Oct 2018
Last Retrived 28 Jul 2025
Rajhans Enclave QR Code
Rajhans Enclave
MahaRERA - P99000003055
Apartment Details & Configuration
TypeArea
FLAT28.06 Sq.mts. ( 302 Sq.ft. )
FLAT32.1 Sq.mts. ( 346 Sq.ft. )
FLAT35.79 Sq.mts. ( 385 Sq.ft. )
FLAT39.82 Sq.mts. ( 429 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rajhans Enclavelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Electrical Room To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Be Provided
Street Lighting50% completed
50% Complete
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Be Provided
Water Supply
Yet To Be Provided
Buildings / Wings in Rajhans Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rajhans Enclave by Rajhans Buildcomlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

19608 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

36 apartments in total
Total
36
Booked
23
Available
13

Saleable Area Statistics (Sq. ft.)

11879 Total
Total
11879
Booked
7703
Available
4176
Total 36 apartments in project. 23 apartments booked. 63% apartments booked.
Total 11879 Sq.ft. saleable area. 7703 saleable area booked.
65% area booked.

Rajhans Enclave

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rajhans EnclaveJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT28.06 Sq.mts. ( 302 Sq.ft. )24
14 Booked58% Booked
58% Booked
FLAT32.1 Sq.mts. ( 346 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT35.79 Sq.mts. ( 385 Sq.ft. )8
5 Booked62% Booked
62% Booked
FLAT39.82 Sq.mts. ( 429 Sq.ft. )2
2 Booked100% Booked
100% Booked
36 total apartments / 23 apartments booked. 63% apartments booked.
Work Description in Building Rajhans EnclaveCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress51% done
51% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Rajhans Buildcom
for Project
Rajhans Enclave
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation