Project overview

Rajan Dinakar Phatak And Others is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800028236. Rajan Dinakar Phatak And Others is located at Tmtbziwj715jf3pf9etbhu7gyic79bcnzx+Gv0g0er4=. This is a New being developed by Westin Sankalp Developers.

Rajan Dinakar Phatak And Others has 1 BHK, 1 BHK ALLOTTED MEMBER, 2 BHK, 2 BHK ALLOTTED MEMBER, 2 BHK ALLOTTEDMEMBER, 3 BHK & 3 BHK ALLOTTED MEMBER Apartments with carpet areas ranging from 1164 to 1024 Sq.ft. Carpet. The Project has total 21 of which 0 are currently available for sale.

Rajan Dinakar Phatak And Others is being developed on a total land area of 5086 Sq.ft. out of which 109 Sq.ft. i.e 2% is reserved for recreational purposes. Rajan Dinakar Phatak And Others has 1 Wings / Towers Rajan Dinakar Phatak And Others

ProjectDeveloperLocationPossession
New Bhagyashree Chs LtdK. Anand Construction Private LimitedE31md1pfpr9ln0mk/R4lctsuwl379dahds2xjcvjrgs=31-12-2017 00:00:00
CONWOOD PARAGONCONSOLIDATED CROP PROTECTION PRIVATE LIMITEDMumbai Suburban, 40006301-07-2020 00:00:00
Om Sai Amrut ChsShree Sai Swami DevelopersMocylbokodv47s080qloqhzm1dwi7gxut0k2fsqlc5dwercerscqzat0xbjhyt/631-12-2018 00:00:00
Express Zone MallCello Sonal ConstructionZapkitd4l1wt69m3d1txuckzt16cy4tbyvn8jzfax4ujkcdzmjodkvv3s1kyhinbexn6ue4d9d7c92bgmsakf3c45yb98k0im47nyhndjzi=30-06-2024 00:00:00
Kush PrestigeKush Buildcon LlpCihf2iymxv5edrnds4omba==31-12-2017 00:00:00
RadhakrishnaK.Pateland CoZdtn3ra/Mdu8w7lkeds3bg==31-12-2017 00:00:00
Romell Aether Wing B 2-Phase 2 34Th To 39Th FloorsRomell Properties Private LimitedOqto+Xrtkmhgqkgr/Rptlg==30-12-2025 00:00:00
Un NamedSanjay Fakirchand GargHry3caiht7n+Y9fqn177eq==28-02-2021 00:00:00
Axiom AvenAxiom Realty Pvt LtdMumbai Suburban31-12-2018 00:00:00
GulmoharUdyam Enterprises400063, Mumbai Suburban30-06-2022 00:00:00
Sheetal KundD.G.Land Developers Pvt LtdIo+1Wbwd9opiqc9tstyeu31yjtabf6qqvbgmy486v6s=01-07-2023 00:00:00
ShivshaktiSamarth Erectors & Developers7Ubnbs4dvvlladacpnbqrw==31-12-2018 00:00:00
Jaywant Villa Co.Operative Housing Society LtdMahendra SawantMumbai Suburban, 40006330-06-2018 00:00:00
Sector R 3 MhadaGuruashish Construction Private LimitedAwly9m8oewol0chuqkwy9i4dj42ndarbfakfu5s34li=31-12-2017 00:00:00
Premleela HeightsPrem Leela DevelopersMumbai Suburban31-12-2015 00:00:00
Dgs HeightsD.G.BuildersMwmls6whkvhgjypbcy4z70jfh7+Lhh3w00lmpvn5ask=31-12-2018 00:00:00
Lodha FiorenzaLodha Developers LimitedCho5lyxxmrqc0rpaqhxctg==31-01-2018 00:00:00
Hetali BlessingsHetali EnterprisesHiajnbiiqjbr43spmxr6ow==04-08-2019 00:00:00
Redevelopment Of Niwara Co-Op Hsg Society LtdThe Niwara Co-Operative Housing Society LtdEh11unrtyapfdmvl8gb3zq==30-06-2024 00:00:00
Sheetal KrupaD.G.Land Developers Private LimitedAvegpruce9pivwb4lacit2+S+Wooapncgyjuu2wivotluqws/Cuwczt0sv12vz9f3rcp5nisbhgnbin3pefbqw==31-12-2018 00:00:00
Vkg CenturionM/S. Frontman Multitrade Pvt. Ltd.Dopao9cci+Xlwctnfat/Gm1pwov2qxuvk6fys/Ykpou=31-12-2025 00:00:00
Kenorita Jewels Phase IiK R Shoppers Private LimitedKg0i6oilardt4x50nkiffbzlikmfr28ohmcrjh+Nytlxbjcm48+Faaebqumxdnhmkllxnahajwq6vev7bdpv1fipsfmdgtyfyhwpyozbncm=31-12-2025 00:00:00
Rajan Dinakar Phatak And OthersWestin Sankalp DevelopersTmtbziwj715jf3pf9etbhu7gyic79bcnzx+Gv0g0er4=30-06-2024 00:00:00
VijayagarSkyline Landmark Projects Private LimitedK8hu2vtid5odseo42wq9tq==31-12-2022 00:00:00
The AceTanvi Construction Pvt Ltd37Idyf11cbknm2qfsmcht9iwrgv0z8qoa8xtd99t1gv5f5akadb068hfe0y4gjairctnpwxg0pgpnlo2unhb5y+Dwqdjygzebhvwcifx6jdswoq2uph0f4eb8cyuh5zn31-12-2024 00:00:00
Chaitanya ResidencyEthics Infra Development Pvt LtdPdyav5kfzw52yldgi7wzm6l/W6p2kxjlebclgpam0ds=30-04-2018 00:00:00
Aspen ParkMessrs. Unique Real Estate DevelopersBvtbqgnv+V7r1mdzrzj9sq==30-12-2020 00:00:00
Samarth TanishNitin Dattaram SamantYudse+B/Ecnyl9egku1mpqenqfveiakil4rsglwyeyk=30-12-2023 00:00:00
Iris Business ParkIris Business Park400063, Mumbai Suburban31-12-2018 00:00:00
Ronit ResidencyRushi Builders And Developers400063, Mumbai Suburban31-12-2017 00:00:00
Chandan HiraBali Shelters LlpH75eowec+C7lzlptciu026plyrn8xzua6gxrhr5yiwc=30-09-2024 00:00:00
Vidya NidhiLaxmi Aakar RealtyIxydwjz4g4u9/Ccnn5slaq==31-03-2024 00:00:00
Krishna NiwasK.Pateland CoUjrknf7eu5ysq4jwvzypaa==31-12-2025 00:00:00
Asmi DreamzAjay Malshi DedhiaE0wpn3trhqpkcpjdbcd1na==31-03-2018 00:00:00
Janardan ChslMahesh Laxman ThakkarBtbmxxthtwmuqaoifffeaa==31-03-2019 00:00:00
Global ResidencyGlobal Housing VenturesNbtel7u4bwp3wlqhkysyxa==01-07-2023 00:00:00
Yash OrionYash Skyscrapers Private LimitedQondqddxppcmsxqplkzjxw==30-06-2018 00:00:00
Shivoham HeightsRajputana HeightsSbfz/Snwi0yv0m36um+Pebbbvw9kctbejmd5c6sx12q=31-12-2017 00:00:00
Shashikala Premises Co-Operative Society LimitedHeartland Habitats LlpQap/Wf//Nx4uvl1iidby5g==31-07-2019 00:00:00
MotivillaAakar Shiv Infra VentureCyr8vrtizaifmug+Meft2q==31-03-2024 00:00:00
Goregaon Manorath Chs LtdK Anand Infra1Imropker7/Eyktfi96pkblowwftueyho9g06n+Cgdwg//Hwywog4hrc2wtpquaj31-03-2026 00:00:00
Redevelopment Of Plot No. 212Pranav Constructions LimitedM7v2u6l1chtfhwhodjf3va==25-02-2025 00:00:00
Aether Wing B2 - Phase 1B - From 21St To 33Rd FloorRomell Properties Private LimitedAnurglvywj1hea1b+Owaba==30-12-2023 00:00:00
Redevelopment Of Mettivilla ChslPranav Constructions LimitedLhmqrx5od4ar9nizu11tzo1kun9zlzyu8v8uyttgsgs=30-12-2028 00:00:00
Om Shubh LabhBali Realty LlpVhezt7o40vttai8v+1Chqct8pim3fkli6ylp7054z8y=30-06-2018 00:00:00
HorizonJaycee Homes Private Limited400063, Mumbai Suburban31-03-2018 00:00:00
Dharmanath KrupaBali Landmarks LlpKrpqswzh18y1ythclrnf8q4zppylgipgvxhg+Tubc5k=31-12-2018 00:00:00
Jaliyan Heights GoregaonJaliyan Developer4C3oczi1xrjv8lhudrcs4dasatkfigeaxvx3n2sajke=30-12-2022 00:00:00
GHARKULAJITKUMAR CHS LTDMumbai Suburban, 40006331-12-2019 00:00:00
Applaud-38I M BuildconMnr+88E81bbhcccsxu+Hlyyt6w66xghxtbz/2Cjgqt4=30-12-2024 00:00:00
Samruddhi HeightsSavita GajarePahadi Goregaon (West)30-12-2023 00:00:00
Redevelopment Of Navchandrakunj ChslPranav Constructions Limited35Zkt4kdvsynz+Jazdbiiy4rco3qsqq8/Y+Yc0e8clujhxcfkyrmspvyxsvutztv30-03-2022 00:00:00
Aether Wing B2 - Phase 1A - Upto 20Th FloorRomell Properties Private LimitedAnurglvywj1hea1b+Owaba==30-12-2023 00:00:00
Svarna KojagiriSvarna Realties LlpOfwydnwq/Zqamvn14cgyfyqxed0bku3+Jyuwpdaiftop/Jtttzk7k1oy4jrl9ruo30-12-2021 00:00:00
Bali DivineBali Estates Llp080Tuj2qubwelf70q3qf5krxbmu340yfyldoxwlr68i=31-07-2025 00:00:00
Parekh CelesteYash Akar Developers LlpLwuoxeoelzfusayrxarjbw==30-04-2027 00:00:00
Happy Home EnclaveJd & Fc Ventures LlpT8+7Okzlniyrbmz/Oazlog==31-12-2026 00:00:00
AshwinSkyline Landmark Projects Private LimitedYxkdmepbbbbjpzmbemg3lw==30-09-2025 00:00:00
Ashwin HeightsWestinrely Developers Pvt LtdDukgb9/Ysupj/Tnranawig==31-12-2026 00:00:00
Aasamanta Laxmi NarayanAasamanta RealtyVhk0cehk5puazkuo62tqcq==31-03-2028 00:00:00
Ariha VincereVelstand Realty LlpQwj9kohmsvt7h+Hc39ot/Nuunm25moxpfypnblaf1mj9o4cmqvauhiatcbdegdkscfz068+Ylqwlwjzatwd84g0mjew3ha9j671b319maqscw2zdbmwfgjxrnrcfohb230-06-2027 00:00:00
Hansini EleganceKarsan Bachu SatraUkxisu1g0o0hj+Eugkghf0uouwjkd4rtixg3oaqlggrzhximw7pbluknladowuk3v3sw6ca3llapaj2h5humqq==31-12-2019 00:00:00
Romell Aether Wing B1Romell Properties Private LimitedLpwj592wwk1rod3gljpaaa==30-12-2021 00:00:00
VivantaKeyland Developers Private Limited+F+Jv4qmuan8t+T63cv9ew4ygpc6bk3ddw/Yzy/Nhl4=31-12-2029 00:00:00
Vallabh Krupa ChslGun Rajan ConstructionsQ3nooxahce3xfik8mdnx+Q==31-10-2026 00:00:00
Damyanti Villa Co Operative Housing SocietyDamyanti Villa Co Operative Housing Society0Rjjnsl2wq3q5rmrgqpnywrgntsowamhusgsptkbr9e=31-12-2026 00:00:00
Bhoomi Samarth B WingSamarth Erectors & DevelopersXj8rs5oberm0saimypwkig==30-06-2024 00:00:00
Empire TowersSahakar VenturesFeziv+/Ncn5xzdgbj1skdkmmr+Rq4rw63ms+Hu/Cuxko4sqzsybpz1yzs0wkvguqplaafxt9n/Mygjznwzgmitfzd2x4/Z7mrajkhsbv0oikrxcs6jy3z4yuntp1ce9wboncuwfv6osacrcygnm5jfhphafogntalxlal8i2vqg=30-09-2024 00:00:00
Rajputana ResidencyRajputana Residency LlpViiyoojc+Wlxyjxgxllz7+Mnchrmulnea0u8h6biro5bxtxugunajxifwvoessuyorgikydadjd0vcclcfxepnqjk6oyuhrt3c0euq9mcjm=31-12-2028 00:00:00
Arkade ViewsArkade Developers LimitedZpiemlntxpbv4gtxkvuzaa==31-12-2027 00:00:00
Hanuman Nagar Azad Nagar Sra ChsPratha ConstructionsRnecojgrg13ob8+/0Obh8q==31-12-2029 00:00:00
LUXURY CHSL LTDLAXMIDEVI DEVELOPERSBehind Filmistan30-06-2025 00:00:00
SmritiMahesh Balkrishna SambhusLu6zipklsquudyzpzszg/W==31-03-2026 00:00:00
Rekha ChslD S M Group0Gt/Hmhkpa4pyc/Rfschra==31-12-2026 00:00:00
Bhoomi Samarth C WingSamarth Erectors & Developers+Bwk0ec3h1b4xkszdtqb7w==30-06-2025 00:00:00
Ashish Building Of Emticibom Employees Chs LtdKarwa And Kewal Kiran Realtors4Kshw1xjzsam4rv550svd5wod840v79ctntrorkirugjaga+C02ehxqljt3gasuk30-09-2024 00:00:00
VindhyagiriGio PropertiesSsrshdhvchpss9hjc/Nd8fist4o+Qsdl6z4a+Xb4junvkwjgwugfdzrskdzmp0mbk8i4xkzgbmmdbc7hfmq83xcrwzzwv412hfzsr/Ogixk=25-02-2025 00:00:00
Shree Hari EnclavePARESH HARILAL PATELGoregaon West, Mumbai Suburban31-12-2025 00:00:00
Avant HillwayRaghvendra Construction Company Pvt LtdByjqhcgvbytgesetnugzxvc/R9qokghw8snkruispes=30-12-2024 00:00:00
Avant HillwayRaghvendra Construction Company Pvt LtdUqfidhlg4frv+54Ptqv2yef7pid/Rbzlwxgc6uwo7fs=30-12-2024 00:00:00
Bhoomi Samarth A WingSamarth Erectors & DevelopersXj8rs5oberm0saimypwkig==30-12-2021 00:00:00
OpulenceAriha Buildtech LlpQkto1ezypgfxrdejliwyrmz5dmm7vipicbddwz+Un4zyjpn8x+Qmnmt25aserenqmlcbjd/9Qa+8+Wwy8raqoo0aq/Vurgwwfd0+Gaslepk+Itysyez8s271g8/6Vdrh/Uqbxeiry/Uazyymxramphmgh7a4mvuxe7k8my9jobqunthertsutq+R0b14g9mtqzg2qccpzrxxn3xy5ax1xisxhulnvpx3pz2kfp8qvsnoxh08nlj1qx0dmghh+Wbtyqfmi/Oqxiwdbr9uz7kamlp1ib5ql7nuh3thv5ilvkk=31-12-2029 00:00:00
SamruddhiShree Sai Bhoomi RealtorsQgegkt1eu/Jgvgycexcvdt1d7ztfjrkhg9gsa827xluwywla7p4rniw+Zy73fjhtydblcallgxnpjrsy6vh1vnee+Cl6g/1Yrshw78/Ul3fhpowgg+57Ssceec9bayom31-12-2029 00:00:00
Navnath NandikeshNavnath Infrastructures Private LimitedOxbw08gxatfhexjq7vsrlg==31-12-2027 00:00:00
Joseph VillaK.Pateland CoZtsddvytxpnlkgp9uomrcw==31-12-2024 00:00:00
Khanolkar Bhavan Chsl - ParadiseC H Patil And Sons LlpUpnzxwy3roix/Ruygqwhta==31-12-2025 00:00:00
Asmi Business CentreAsmi Corporation01Upmeic575dul4ocrl0l+D5ky8c9qu/Wmjvb52tqtfzhk9uxuttk/N7zlpjmypala4euayz7akg0czn5yxcwa+0Une8ozkzkbuo5g6mbes=31-12-2025 00:00:00
Delta MeadowsDelta Synergy Llp6Tuaig2wtlovd3e7fazafg==30-06-2027 00:00:00
Ariha One08Ariha Spaces LlpGjjeld0v5xlzfvvaksb0s5tlnsi19u0ecxigl5e6q4cpjnhtl1cwfukausfkmyix31-12-2027 00:00:00
Shri Kripa Kutir ChslMadhu AssociatesKtzxje5uhi9gqu/Pvt3uzw==31-03-2027 00:00:00
Ranbir Green Path EGreen Developers LlpZt0jgiz//Z1oy3rzefmu2y+Okcigbcvvwf6ctcisaomm8f4gzmyovakucm+Zafsg28-01-2029 00:00:00
Kanchan ChslC H Patil And Sons LlpKx4pdjdi9t59npebb8y4yg==31-03-2019 00:00:00
Nirlon Employees Cooperative Housing Society Limited Building No 11, 12 ,13Shivam Parivar Developers Pvt LtdTxhcyfmezohskgvbnx/Zgg==30-12-2024 00:00:00
KrishnaK Patel And Co Pvt LtdTdcn+Isohit/Fsbjszcdwq==30-06-2024 00:00:00
Deep Darshani ChsSarvoday Builders And DevelopersVqmukkchozfxcusmj6u7mq==30-12-2021 00:00:00
Saan SymphonySantosh Raosaheb NavleSx2hvy0/Wwlshh6+Ntgkew==31-05-2027 00:00:00
Goregaon Adwait Chsl - Vijay SadanPrashant Shirsat/Pnegt/5Coplf0ogc2d4za==30-12-2026 00:00:00
Goregaon Matrusmruti ChslMadhu Associates7Onkyjqqw8wihmkpan/G5aneqi+P11ucjtyqq/Facgu=31-12-2025 00:00:00
Sheetal KiaraA & A DevelopersWow+5Jcc92nximbw+Ffnms3umqvcmbhktyk0tugzhqze0lefflv4fbi9frcxlprt31-12-2028 00:00:00
Manju VillaMeghna Developers AopOobe5bkuezf8ohej1nbxesg7bew6fhhjjz/H1tmgisa=28-12-2026 00:00:00
Shiv GangaAnjani Kumar Co Pvt LtdLlazcyqp8lvzwf3k/Zmbla==30-06-2023 00:00:00
Mandor Heights Phase-IiA S K Construction CoSr0svyo+Gpitcwwiae95xa==30-03-2023 00:00:00
Sixty 3 W.E. BizparkAgm Vijaylaxmi Elite Llp30-06-2031 00:00:00
Dps Capital Bp Infra Highrise Llp09-10-2028 00:00:00
Mehta Angelo 1978Shreeram Builders31-12-2029 00:00:00
Sanghvi CrystalSanghvip Builders LlpYbs8yidnfzxbsitdvrzlaq==29-02-2028 00:00:00
Ariha SkyesAriha Globe Llp30-03-2029 00:00:00
Sheetal AniketD.G. Land Developers Private Limited400063, Mumbai Suburban31-12-2018 00:00:00
Ranbir Green Path A, B And CGreen Developers LlpKlblydiibnw6ch7g3y9p/Wr0seg4vg7vaqni+T4z1vcwq1hdqa8caz6easvi3jnv9g2hzsk4xlwbwqp0xldq3rwdzabebicfzv6a77hnofejhogomj8wzmjtkmwihltn28-01-2029 00:00:00
Accord ClassicSuyojana Impex Pvt. LtdQ+Nh9pgl+O1d8gbg3bwdzw==30-03-2022 00:00:00
Solaris BhagyashreeSolaris Developers Private LimitedMumbai Suburban, 40006331-12-2018 00:00:00
Hirani ElixirOm Sjk Realty Llp31-03-2028 00:00:00
Vardhman SpringsVardhman Developers Ltd31-12-2028 00:00:00
Sahakar VedSahakar Builders & Developers 31-12-2028 00:00:00
Mehta Marquina 1978Shreeram Builders31-12-2030 00:00:00
Sunteck Pinnacle 1Sunteck Realty LimitedGkddf0xfri2dll5ylwpccw==31-12-2025 00:00:00
KrupaAasamanta RealtyM68jnruwravyanqjmv4xiq==31-03-2024 00:00:00
Rishab Luv Kush Chsl LtdRishab Infra30-06-2028 00:00:00
Sixty 3 W.E. ResidencesAgm Vijaylaxmi Elite Llp31-12-2031 00:00:00
Paras Goregaon Co-Op Hsg Soc LtdMadhav Enterprise31-12-2028 00:00:00
Project Details
  • Project:
    Rajan Dinakar Phatak And Others
  • Location:
  • Tmtbziwj715jf3pf9etbhu7gyic79bcnzx+Gv0g0er4=
  • Const. Stage:
    New
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Westin Sankalp Developers
  • Phone:
  • Address:
  • Shree Gokul Chs Ltd
Project RERA Details
MAHA REARA No: P51800028236
Project Type Residential / Group Housing
RERA Project Status New
Architect Vinayak V Patil
Funding Bank SARASWAT COOPERATIVE BANK LIMITED
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Feb 2021
Last Retrived 13 Feb 2026
Rajan Dinakar Phatak And Others QR Code
Rajan Dinakar Phatak And Others
MahaRERA - P51800028236
Apartment Details & Configuration
TypeArea
1 BHK37.9 Sq.mts. ( 408 Sq.ft. )
1 BHK38.18 Sq.mts. ( 411 Sq.ft. )
1 BHK ALLOTTED MEMBER38 Sq.mts. ( 409 Sq.ft. )
1 BHK ALLOTTED MEMBER36.88 Sq.mts. ( 397 Sq.ft. )
1 BHK ALLOTTED MEMBER36.98 Sq.mts. ( 398 Sq.ft. )
1 BHK ALLOTTED MEMBER37.07 Sq.mts. ( 399 Sq.ft. )
2 BHK49.15 Sq.mts. ( 529 Sq.ft. )
2 BHK56.21 Sq.mts. ( 605 Sq.ft. )
2 BHK ALLOTTED MEMBER45.15 Sq.mts. ( 486 Sq.ft. )
2 BHK ALLOTTEDMEMBER44.69 Sq.mts. ( 481 Sq.ft. )
3 BHK72.19 Sq.mts. ( 777 Sq.ft. )
3 BHK ALLOTTED MEMBER87.51 Sq.mts. ( 942 Sq.ft. )
3 BHK ALLOTTED MEMBER95.13 Sq.mts. ( 1024 Sq.ft. )
3 BHK ALLOTTED MEMBER108.14 Sq.mts. ( 1164 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rajan Dinakar Phatak And Otherslast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
FITNESS CENTER100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
SOCIETY OFFICE100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Borewell Work Done
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Rajan Dinakar Phatak And Others
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rajan Dinakar Phatak And Others by Westin Sankalp Developerslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

5086 Sq. ft.

Project Area

109 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

21 apartments in total
Total
21
Booked
21
Available
0

Saleable Area Statistics (Sq. ft.)

11979 Total
Total
11979
Booked
11979
Available
0
Total 21 apartments in project. 21 apartments booked. 100% apartments booked.
Total 11979 Sq.ft. saleable area. 11979 saleable area booked.
100% area booked.

Rajan Dinakar Phatak And Others

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rajan Dinakar Phatak And OthersDec 202391010017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.9 Sq.mts. ( 408 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK38.18 Sq.mts. ( 411 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK ALLOTTED MEMBER38 Sq.mts. ( 409 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK ALLOTTED MEMBER36.88 Sq.mts. ( 397 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK ALLOTTED MEMBER36.98 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK ALLOTTED MEMBER37.07 Sq.mts. ( 399 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK49.15 Sq.mts. ( 529 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK56.21 Sq.mts. ( 605 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK ALLOTTED MEMBER45.15 Sq.mts. ( 486 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK ALLOTTEDMEMBER44.69 Sq.mts. ( 481 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK72.19 Sq.mts. ( 777 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK ALLOTTED MEMBER87.51 Sq.mts. ( 942 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK ALLOTTED MEMBER95.13 Sq.mts. ( 1024 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK ALLOTTED MEMBER108.14 Sq.mts. ( 1164 Sq.ft. )1
1 Booked100% Booked
100% Booked
21 total apartments / 21 apartments booked. 100% apartments booked.
Work Description in Building Rajan Dinakar Phatak And OthersCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Westin Sankalp Developers
for Project
Rajan Dinakar Phatak And Others
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation