Project overview

Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700008352. Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E is located at 48/1/3, 49/1A. This is a Ongoing being developed by Rajesh Estates And Nirman Pvt Ltd.

Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E has 2 BHK & 3 BHK Apartments with carpet areas ranging from 738 to 1032 Sq.ft. Carpet. The Project has total 568 of which 318 are currently available for sale.

Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E is being developed on a total land area of 22632 Sq.ft. out of which 10532 Sq.ft. i.e 47% is reserved for recreational purposes. Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E has 5 Wings / Towers Raj Torres Wing A,Raj Torres Wing B,Raj Torres Wing C,Raj Torres Wing D,Raj Torres Wing E

ProjectDeveloperLocationPossession
Amanda ShoppingHiranandani Properties Private LimitedChitalsar Manpada Gut No 47/1 Pt, 52/8, 52/1131-12-2019 00:00:00
Saptashree HeightsSaptashree Reality Private LimitedGut No 25 Hissa No 2 , 331-05-2018 00:00:00
IrisHiranandani Properties Private LimitedVillage Chitalsar Manpada Gut No 52/8 Pt, 52/1431-12-2019 00:00:00
DandeliaAcme Housing India Private LimitedGut No- 61/1/1, Gut No-61/1/1/2/3/4, Gut No - 61/2/1/2/3.31-12-2018 00:00:00
Gingelia ResidentialAcme Housing India Private LimitedGut No- 61/1/1, Gut No-61/1/1/2/3/4, Gut No - 61/2/1/2/3.30-12-2022 00:00:00
HerbeliaAcme Housing India Private LimitedGut No- 61/1/1, Gut No-61/1/1/2/3/4, Gut No - 61/2/1/2/3.30-12-2022 00:00:00
Crystal SpiresLuxora Realtors Private Limited68/1 Part, 68/3A Part, 59/A/30/2/3 Part31-01-2021 00:00:00
Orion Business ParkNeminath EnterprisesGut No 33 Pt31-03-2019 00:00:00
Elite Solitaire 16Vijay Associates (Wadhwa)Part Of Survey No 37-1330-12-2021 00:00:00
Hyde Park Residency F6 Building PhaseNexus Builders And Developers Pvt Ltd47/1/2, 47/1/3, 47/1/4, 47/1/5, 47/1/7, 47/1/8, 47/1/9, 47/1/1030-12-2021 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt Ltd47/1/2, 47/1/3, 47/1/4, 47/1/5, 47/1/7, 47/1/9, 47/1/1030-12-2021 00:00:00
Marigold B WingShree Tirupati Greenfield Developers1/1C, 1/1D, 1/1E, 1/1F, 1/1G30-12-2022 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private Limited1411, 2, 3, 144, 1451, 2, 4, 1462, 3, 4, 1481, 1421, 1483130-12-2023 00:00:00
Krishna - B WingNeelkanth Palm Realty149/4/1 Pt, 412/2 Pt30-05-2022 00:00:00
Runwal PearlRunwal Construction Private LimitedGut No 21/B1 Gut No 21/B231-05-2019 00:00:00
Terraform ArcadeMoney Magnum Constructions37/10, 38/1, 146/1, 146/2P31-07-2022 00:00:00
Highland Springs B4- A WingSiddhi Real Estate Developers74/5Apart30-06-2023 00:00:00
Highland Park Building 2- K25 Wing A Phase 2Siddhi Gaurav EnterprisesS. N. 87/2 And 82/630-12-2024 00:00:00
Falco CheshireAanya RealtorsThane, 42110231-10-2016 00:00:00
Pioneer Park 2Shubham Enterprises400607, Thane31-03-2019 00:00:00
BasiliaAcme Housing India Private LimitedGat No 61/1/1, Gat No 61/1/2/3/4, Gat No 61/2/1/2/331-12-2017 00:00:00
Dosti Imperia - Dosti MajestaDosti Realty LtdNew Gut No. 52 1B 2 Pt31-12-2018 00:00:00
Highland Springs B4- C WingSiddhi Real Estate Developers74/5A 59/1A 59/1B 46/1830-12-2023 00:00:00
Elite Solitaire 15Vijay Associates (Wadhwa)Part Of Survey No 37-1330-12-2021 00:00:00
Highland Park Building 6 And 7- K23 Phase 1Siddhi Gaurav EnterprisesS. N. 85 And 87/231-12-2019 00:00:00
Y SquareShree Mallinath Enterprise Llp37/1,37/2,37/3,37/4,37/5,37/6,37/7,37/8,37/9,37/10,37/11,37/12,37/13-283-A(Old), New S No 38/1,38/2 - 283-B(Old), New S No-36/1,36/2A,36/2B-146/128-02-2025 00:00:00
Ashar Edge Wing A Phase IiMs Ashar VenturesS.No. 342 Hissa No 4 Part Village Majiwade, Thane 40061030-10-2023 00:00:00
Ashar Edge Wing B Phase IiiMs Ashar VenturesS No 342 Hissa No 4 Pt Village Majiwade Thane West 40061030-10-2023 00:00:00
Ashar Edge Galleria- Phase IMs Ashar VenturesS.No. 342 Hissa No 4 Part, Village Majiwade, Thane-400 61030-10-2023 00:00:00
Orion -3Vijay Suraksha Realty LlpSurvey No 238/9Pt, Survey No 252/3/3Pt, Survey No 252/4/1 30-12-2020 00:00:00
Ashar Sapphire And GalleriaMs Ashar VenturesGut No 32-2G And 32-1-6 Sub Plot B Village Chitalsar Manpada Thane31-12-2019 00:00:00
Raj Tattva Phase Ii Wing C And DKothari Autoparts Manufacturers Pvt Ltd141/1, 2, 3, 144, 145/1, 2, 4, 145/3/1, 146/2, 3, 148/1, 414/2, 146/431-12-2019 00:00:00
Raj Tattva Phase 1 CommercialKothari Autoparts Manufacturers Pvt Ltd1411, 2, 3, 144, 1451,2,4, 1462,3,4, 1481, 14821, 148,130-06-2018 00:00:00
Hg- A1Siddhi Real Estate Developers66/24B 66/22C 66/18Bpt 66/2330-12-2024 00:00:00
Highland Springs B4- B WingSiddhi Real Estate Developers74/5A30-06-2023 00:00:00
Hansraj HeightsParshvanath Enterprises63/4/2 And 63/5/231-12-2018 00:00:00
Elite Platina 19Vijay Associates (Wadhwa)Part Of Survey No 37-11B30-12-2021 00:00:00
Project Details
  • Project:
    Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E
  • Location:
  • 48/1/3, 49/1A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Mar 2022
Developer Details

  • Developer:
    Rajesh Estates And Nirman Pvt Ltd
  • Phone:
  • Address:
  • Seksaria Chambers
Project RERA Details
MAHA REARA No: P51700008352
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Anil Jagwani
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Mar 2022
Revised Possession 30 Mar 2022
Extended Possession
Litigations No Litigations
Last Modified 18 Aug 2017
Last Retrived 26 Jul 2025
Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E QR Code
Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E
MahaRERA - P51700008352
Apartment Details & Configuration
TypeArea
3 BHK88.98 Sq.mts. ( 958 Sq.ft. )
3 BHK89.62 Sq.mts. ( 965 Sq.ft. )
3 BHK95.99 Sq.mts. ( 1033 Sq.ft. )
3 BHK96.2 Sq.mts. ( 1035 Sq.ft. )
2 BHK67.82 Sq.mts. ( 730 Sq.ft. )
2 BHK68 Sq.mts. ( 732 Sq.ft. )
2 BHK68.08 Sq.mts. ( 733 Sq.ft. )
2 BHK68.34 Sq.mts. ( 736 Sq.ft. )
3 BHK89.65 Sq.mts. ( 965 Sq.ft. )
3 BHK90.08 Sq.mts. ( 970 Sq.ft. )
3 BHK96.9 Sq.mts. ( 1043 Sq.ft. )
3 BHK96.93 Sq.mts. ( 1043 Sq.ft. )
4 BHK128.57 Sq.mts. ( 1384 Sq.ft. )
2 BHK67.21 Sq.mts. ( 723 Sq.ft. )
2 BHK67.68 Sq.mts. ( 729 Sq.ft. )
2 BHK68.59 Sq.mts. ( 738 Sq.ft. )
2 BHK69.03 Sq.mts. ( 743 Sq.ft. )
3 BHK95.92 Sq.mts. ( 1032 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing Elast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Before Oc
CLUB HOUSE AND ADDITIONAL FACILITIES
As Per Afs For The Residential Units
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Before Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
Before Oc
Landscaping & Tree Planting
Before Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Before Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Before Oc
Street Lighting
Before Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Before Oc
Water Supply
Before Oc
Buildings / Wings in Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E by Rajesh Estates And Nirman Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

22632 Sq. ft.

Project Area

10532 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

568 apartments in total
Total
568
Booked
250
Available
318

Saleable Area Statistics (Sq. ft.)

509594 Total
Total
509594
Booked
210741
Available
298854
Total 568 apartments in project. 250 apartments booked. 44% apartments booked.
Total 509594 Sq.ft. saleable area. 210741 saleable area booked.
41% area booked.

Raj Torres Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Raj Torres Wing AMar 20213011130110
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK88.98 Sq.mts. ( 958 Sq.ft. )29
11 Booked37% Booked
37% Booked
3 BHK89.62 Sq.mts. ( 965 Sq.ft. )29
7 Booked24% Booked
24% Booked
3 BHK95.99 Sq.mts. ( 1033 Sq.ft. )29
3 BHK96.2 Sq.mts. ( 1035 Sq.ft. )22
6 Booked27% Booked
27% Booked
109 total apartments / 29 apartments booked. 26% apartments booked.
Work Description in Building Raj Torres Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress33% done
33% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress65% done
65% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress65% done
65% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress65% done
65% Booked
X number of Slabs of Super Structure

Raj Torres Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Raj Torres Wing BMar 20213011130110
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK67.82 Sq.mts. ( 730 Sq.ft. )29
17 Booked58% Booked
58% Booked
2 BHK68 Sq.mts. ( 732 Sq.ft. )29
16 Booked55% Booked
55% Booked
2 BHK68.08 Sq.mts. ( 733 Sq.ft. )22
9 Booked40% Booked
40% Booked
2 BHK68.34 Sq.mts. ( 736 Sq.ft. )29
19 Booked65% Booked
65% Booked
109 total apartments / 61 apartments booked. 55% apartments booked.
Work Description in Building Raj Torres Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress31% done
31% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress55% done
55% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress55% done
55% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress55% done
55% Booked
X number of Slabs of Super Structure

Raj Torres Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Raj Torres Wing CMar 20213011130168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK89.65 Sq.mts. ( 965 Sq.ft. )29
6 Booked20% Booked
20% Booked
3 BHK90.08 Sq.mts. ( 970 Sq.ft. )29
15 Booked51% Booked
51% Booked
3 BHK96.9 Sq.mts. ( 1043 Sq.ft. )22
3 BHK96.93 Sq.mts. ( 1043 Sq.ft. )29
25 Booked86% Booked
86% Booked
4 BHK128.57 Sq.mts. ( 1384 Sq.ft. )29
138 total apartments / 52 apartments booked. 37% apartments booked.
Work Description in Building Raj Torres Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress55% done
55% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress62% done
62% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress50% done
50% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress55% done
55% Booked
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked

Raj Torres Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Raj Torres Wing DMar 20212911130107
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK67.21 Sq.mts. ( 723 Sq.ft. )56
35 Booked62% Booked
62% Booked
2 BHK67.68 Sq.mts. ( 729 Sq.ft. )50
33 Booked66% Booked
66% Booked
106 total apartments / 68 apartments booked. 64% apartments booked.
Work Description in Building Raj Torres Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress55% done
55% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress62% done
62% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress50% done
50% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress55% done
55% Booked
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked

Raj Torres Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Raj Torres Wing EMar 20212911130107
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK68.59 Sq.mts. ( 738 Sq.ft. )22
7 Booked31% Booked
31% Booked
2 BHK69.03 Sq.mts. ( 743 Sq.ft. )28
17 Booked60% Booked
60% Booked
3 BHK95.92 Sq.mts. ( 1032 Sq.ft. )56
16 Booked28% Booked
28% Booked
106 total apartments / 40 apartments booked. 37% apartments booked.
Work Description in Building Raj Torres Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress36% done
36% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress40% done
40% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress36% done
36% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Rajesh Estates And Nirman Pvt Ltd
for Project
Raj Torres Phase Ii Wing A Wing B Wing C Wing D Wing E
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation