Raj Silverstone Phase-2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700047261. Raj Silverstone Phase-2 is located at S No 63 H No 2 E. This is a New being developed by Skyspace Builtek.

Raj Silverstone Phase-2 has 2 BHK & 3 BHK Apartments with carpet areas ranging from 500 to 778 Sq.ft. Carpet. The Project has total 62 of which 25 are currently available for sale.

Raj Silverstone Phase-2 is being developed on a total land area of 23143 Sq.ft. Raj Silverstone Phase-2 has 1 Wings / Towers Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Raj Silverstone Phase-2
  • Location:
  • S No 63 H No 2 E
  • Const. Stage:
    New
  • Possession:
    31 Jul 2025
Developer Details

  • Developer:
    Skyspace Builtek
  • Phone:
  • Address:
  • Chandradarshan Apt.
Project RERA Details
MAHA REARA No: P51700047261
Project Type Residential / Group Housing
RERA Project Status New
Architect Nishant Zunjarrao
Funding Bank HDFC BANK
Proposed Possession 31 Jul 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Jul 2023
Last Retrived 26 Jul 2025
Raj Silverstone Phase-2 QR Code
Raj Silverstone Phase-2
MahaRERA - P51700047261
Apartment Details & Configuration
TypeArea
2 BHK46.44 Sq.mts. ( 500 Sq.ft. )
2 BHK47.64 Sq.mts. ( 513 Sq.ft. )
2 BHK50.19 Sq.mts. ( 540 Sq.ft. )
3 BHK72.27 Sq.mts. ( 778 Sq.ft. )
3 BHK72.32 Sq.mts. ( 778 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Raj Silverstone Phase-2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
Na
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp Not Provided Underground Drainage Connection
Solid Waste Management And Disposal
-
Storm Water Drains
-
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
-
Water Conservation, Rain water Harvesting
-
Water Supply
In Progress After Completion
Buildings / Wings in Raj Silverstone Phase-2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Raj Silverstone Phase-2 by Skyspace Builteklast updated on 26 Jul 2025 as per information obtained from MARA RERA.

23143 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

62 apartments in total
Total
62
Booked
37
Available
25

Saleable Area Statistics (Sq. ft.)

38855 Total
Total
38855
Booked
21546
Available
17309
Total 62 apartments in project. 37 apartments booked. 59% apartments booked.
Total 38855 Sq.ft. saleable area. 21546 saleable area booked.
55% area booked.

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJul 2025131010981
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.44 Sq.mts. ( 500 Sq.ft. )13
9 Booked69% Booked
69% Booked
2 BHK47.64 Sq.mts. ( 513 Sq.ft. )11
8 Booked72% Booked
72% Booked
2 BHK50.19 Sq.mts. ( 540 Sq.ft. )12
11 Booked91% Booked
91% Booked
3 BHK72.27 Sq.mts. ( 778 Sq.ft. )13
7 Booked53% Booked
53% Booked
3 BHK72.32 Sq.mts. ( 778 Sq.ft. )13
62 total apartments / 37 apartments booked. 59% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress88% done
88% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress88% done
88% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress88% done
88% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked
Channel Partners
Channel Partners Registered by Developer
Skyspace Builtek
for Project
Raj Silverstone Phase-2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation