Project overview

Raj Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700019343. Raj Residency is located at Thane, Mangal Murti Dham. This is a New Project being developed by Paragon Buildcon.

Raj Residency has 1 BHK, 1 RK & 1RK Apartments with carpet areas ranging from 203 to 287 Sq.ft. Carpet. The Project has total 33 of which 33 are currently available for sale.

Raj Residency is being developed on a total land area of 10667 Sq.ft. Raj Residency has 1 Wings / Towers Raj Residency

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Raj Residency
  • Location:
  • Thane, Mangal Murti Dham
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Paragon Buildcon
  • Phone:
  • Address:
  • 601, 6Th Floor, Mangal Murthi, Near Old Petrol Pump, Badlapur, 421503
Project RERA Details
MAHA REARA No: P51700019343
Project Type Residential
RERA Project Status New Project
Funding Bank Kotak Mahindra Bank
Proposed Possession 30 Dec 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Jan 2019
Last Retrived 28 Jul 2025
Raj Residency QR Code
Raj Residency
MahaRERA - P51700019343
Apartment Details & Configuration
TypeArea
1 BHK22.3 Sq.mts. ( 240 Sq.ft. )
1 BHK25.16 Sq.mts. ( 271 Sq.ft. )
1 BHK26.68 Sq.mts. ( 287 Sq.ft. )
1 RK20.19 Sq.mts. ( 217 Sq.ft. )
1RK21 Sq.mts. ( 226 Sq.ft. )
1RK18.89 Sq.mts. ( 203 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Raj Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Started
Landscaping & Tree Planting
Na
Open Parking
Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Started
Solid Waste Management And Disposal
Not Started
Storm Water Drains
Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Not Started
Water Conservation, Rain water Harvesting
Not Started
Water Supply
Not Started
Buildings / Wings in Raj Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Raj Residency by Paragon Buildconlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10667 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

33 apartments in total
Total
33
Booked
0
Available
33

Saleable Area Statistics (Sq. ft.)

8013 Total
Total
8013
Booked
0
Available
8013
Total 33 apartments in project. 0 apartments booked. 0% apartments booked.
Total 8013 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Raj Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Raj ResidencyDec 20204000110
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.3 Sq.mts. ( 240 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK25.16 Sq.mts. ( 271 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK26.68 Sq.mts. ( 287 Sq.ft. )6
None Booked0% Booked
0% Booked
1 RK20.19 Sq.mts. ( 217 Sq.ft. )6
None Booked0% Booked
0% Booked
1RK21 Sq.mts. ( 226 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK18.89 Sq.mts. ( 203 Sq.ft. )5
None Booked0% Booked
0% Booked
33 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Raj ResidencyCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Paragon Buildcon
for Project
Raj Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation