Project overview

Rai S Aaragya is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017230. Rai S Aaragya is located at Survey No 46 Hissa No 5 And 7. This is a New being developed by Rai Residency Private Limited.

Rai S Aaragya has Shop Apartments with carpet areas ranging from 112 to 198 Sq.ft. Carpet. The Project has total 401 of which 154 are currently available for sale.

Rai S Aaragya is being developed on a total land area of 51969 Sq.ft. Rai S Aaragya has 6 Wings / Towers Rai S Aaraghya Bldg 01 A Wing,Rai S Aaraghya Bldg 02 B Wing,Rais Aaraghya Bldg No 3 C Wing,Rais Aaraghya Bldg No 4 D Wing,Rais Aaraghya Bldg No 5 E Wing,Rais Aaraghya Proposed

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
SambhaviShree Vakratunda DevelopersSurvey No 531-10-2024 00:00:00
Shree Mangal Narayan ResidencyN V ConstructionCts 9721 To973431-12-2023 00:00:00
Vakratunda HomesNarayan Sunil RanePlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Hemant Shishir Co.Op HsgNarendra Kalyanji Patel3512-352131-12-2023 00:00:00
Fortune EmporioQuanta Realty LlpCts No 4090 To 4096,4166 To 4171,4240,4241 New Sno 37 Hno 3C31-12-2025 00:00:00
The Valaji EstateFore Holdings4065,4093-4097,4099-410205-07-2024 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Plot No -1A,Sector -19, Vashi Truck TerminalCity And Industrial Development Corporation Of Maharashtra LimitedPlot No -1A31-12-2025 00:00:00
Jp HarmonyJp Corp Developers (India) Llp12931-12-2023 00:00:00
Deep Royal ResidencyM/S. Deepali Infracon LlpSurvey No.80 Hissa No.231-12-2023 00:00:00
Belvedere-B And CMacrotech Developers Limited212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
Sai Dream OneGls InfrastructuresS No.88, H No 6 & 731-12-2025 00:00:00
Neelkanth Palm AvenueNeelkanth InfratechPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Vrundavan DhamShikhar LifespacesS.No 13, H No. 1 P31-12-2023 00:00:00
Riverwood Park Building No -3Shree Khidkaleshwar Property Developers Pvt. Ltd.26/2, 26/3 All In Parts30-06-2026 00:00:00
Vishwajeet Empire NxGulabrao Baburao Karanjule PatilSurvey No 39 Hissa No 2A, Hissa No 2B, Hissa No 2C And Hissa No 2D23-06-2026 00:00:00
Neelkanth Palm PresidentNeelkanth InfratechPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IiShree Balaji DevelopersSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAadarsh DevelopersCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Project Details
  • Project:
    Rai S Aaragya
  • Location:
  • Survey No 46 Hissa No 5 And 7
  • Const. Stage:
    New
  • Possession:
    30 Dec 2026
Developer Details

  • Developer:
    Rai Residency Private Limited
  • Phone:
  • Address:
  • Sai Ganesh Sankul
Project RERA Details
MAHA REARA No: P51700017230
Project Type Others
RERA Project Status New
Architect Dilip Tambday And Associates
Funding Bank KARNATAKA BANK LIMITED
Proposed Possession 30 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2019
Last Retrived 26 Jul 2025
Rai S Aaragya QR Code
Rai S Aaragya
MahaRERA - P51700017230
Apartment Details & Configuration
TypeArea
1 BHK28.08 Sq.mts. ( 302 Sq.ft. )
1 BHK31.86 Sq.mts. ( 343 Sq.ft. )
2 BHK45.1 Sq.mts. ( 485 Sq.ft. )
2 BHK48.89 Sq.mts. ( 526 Sq.ft. )
Shop8.53 Sq.mts. ( 92 Sq.ft. )
Shop9.57 Sq.mts. ( 103 Sq.ft. )
Shop10.32 Sq.mts. ( 111 Sq.ft. )
Shop13.75 Sq.mts. ( 148 Sq.ft. )
1 BHK31.68 Sq.mts. ( 341 Sq.ft. )
Shop9.48 Sq.mts. ( 102 Sq.ft. )
Shop10.35 Sq.mts. ( 111 Sq.ft. )
Shop13.77 Sq.mts. ( 148 Sq.ft. )
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )
1 BHK31.21 Sq.mts. ( 336 Sq.ft. )
1 BHK32.96 Sq.mts. ( 355 Sq.ft. )
2 BHK43.29 Sq.mts. ( 466 Sq.ft. )
2 BHK43.4 Sq.mts. ( 467 Sq.ft. )
Shop11.06 Sq.mts. ( 119 Sq.ft. )
Shop11.23 Sq.mts. ( 121 Sq.ft. )
Shop12.66 Sq.mts. ( 136 Sq.ft. )
Shop12.7 Sq.mts. ( 137 Sq.ft. )
Shop12.92 Sq.mts. ( 139 Sq.ft. )
Shop13.72 Sq.mts. ( 148 Sq.ft. )
Shop14.23 Sq.mts. ( 153 Sq.ft. )
Shop14.75 Sq.mts. ( 159 Sq.ft. )
Shop16.77 Sq.mts. ( 181 Sq.ft. )
Shop17.44 Sq.mts. ( 188 Sq.ft. )
1 BHK29.95 Sq.mts. ( 322 Sq.ft. )
1 BHK30.37 Sq.mts. ( 327 Sq.ft. )
1 BHK30.73 Sq.mts. ( 331 Sq.ft. )
1 BHK30.85 Sq.mts. ( 332 Sq.ft. )
1 BHK31.9 Sq.mts. ( 343 Sq.ft. )
1 BHK35.18 Sq.mts. ( 379 Sq.ft. )
1RK22.3 Sq.mts. ( 240 Sq.ft. )
2 BHK43.15 Sq.mts. ( 464 Sq.ft. )
Shop12.89 Sq.mts. ( 139 Sq.ft. )
Shop14.57 Sq.mts. ( 157 Sq.ft. )
Shop14.9 Sq.mts. ( 160 Sq.ft. )
Shop15.02 Sq.mts. ( 162 Sq.ft. )
Shop15.95 Sq.mts. ( 172 Sq.ft. )
Shop18.48 Sq.mts. ( 199 Sq.ft. )
Shop20.22 Sq.mts. ( 218 Sq.ft. )
1 BHK29.99 Sq.mts. ( 323 Sq.ft. )
1 BHK30.86 Sq.mts. ( 332 Sq.ft. )
1 BHK31.54 Sq.mts. ( 339 Sq.ft. )
2 BHK47.61 Sq.mts. ( 512 Sq.ft. )
Shop9.47 Sq.mts. ( 102 Sq.ft. )
Shop10.4 Sq.mts. ( 112 Sq.ft. )
Shop12.44 Sq.mts. ( 134 Sq.ft. )
Shop12.63 Sq.mts. ( 136 Sq.ft. )
Shop12.64 Sq.mts. ( 136 Sq.ft. )
Shop14.77 Sq.mts. ( 159 Sq.ft. )
Shop16.54 Sq.mts. ( 178 Sq.ft. )
Shop18.39 Sq.mts. ( 198 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rai S Aaragyalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Approved Plan
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Approved Plan
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Approved Plan
Water Supply
By Kdmc
Buildings / Wings in Rai S Aaragya
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rai S Aaragya by Rai Residency Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

51969 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

401 apartments in total
Total
401
Booked
247
Available
154

Saleable Area Statistics (Sq. ft.)

137616 Total
Total
137616
Booked
93134
Available
44482
Total 401 apartments in project. 247 apartments booked. 61% apartments booked.
Total 137616 Sq.ft. saleable area. 93134 saleable area booked.
68% area booked.

Rai S Aaraghya Bldg 01 A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rai S Aaraghya Bldg 01 A WingDec 20259000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.08 Sq.mts. ( 302 Sq.ft. )9
6 Booked66% Booked
66% Booked
1 BHK31.86 Sq.mts. ( 343 Sq.ft. )14
10 Booked71% Booked
71% Booked
2 BHK45.1 Sq.mts. ( 485 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK48.89 Sq.mts. ( 526 Sq.ft. )9
9 Booked100% Booked
100% Booked
Shop8.53 Sq.mts. ( 92 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop9.57 Sq.mts. ( 103 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.32 Sq.mts. ( 111 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.75 Sq.mts. ( 148 Sq.ft. )2
2 Booked100% Booked
100% Booked
41 total apartments / 29 apartments booked. 70% apartments booked.
Work Description in Building Rai S Aaraghya Bldg 01 A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rai S Aaraghya Bldg 02 B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rai S Aaraghya Bldg 02 B WingDec 20256000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.68 Sq.mts. ( 341 Sq.ft. )10
None Booked0% Booked
0% Booked
Shop9.48 Sq.mts. ( 102 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.35 Sq.mts. ( 111 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.77 Sq.mts. ( 148 Sq.ft. )2
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rai S Aaraghya Bldg 02 B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rais Aaraghya Bldg No 3 C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rais Aaraghya Bldg No 3 C WingJun 202613000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )36
29 Booked80% Booked
80% Booked
1 BHK31.21 Sq.mts. ( 336 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK32.96 Sq.mts. ( 355 Sq.ft. )12
7 Booked58% Booked
58% Booked
2 BHK43.29 Sq.mts. ( 466 Sq.ft. )12
10 Booked83% Booked
83% Booked
2 BHK43.4 Sq.mts. ( 467 Sq.ft. )9
8 Booked88% Booked
88% Booked
Shop11.06 Sq.mts. ( 119 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.23 Sq.mts. ( 121 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.66 Sq.mts. ( 136 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.7 Sq.mts. ( 137 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.92 Sq.mts. ( 139 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.72 Sq.mts. ( 148 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.23 Sq.mts. ( 153 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.75 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.77 Sq.mts. ( 181 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.44 Sq.mts. ( 188 Sq.ft. )2
None Booked0% Booked
0% Booked
83 total apartments / 57 apartments booked. 68% apartments booked.
Work Description in Building Rais Aaraghya Bldg No 3 C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rais Aaraghya Bldg No 4 D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rais Aaraghya Bldg No 4 D WingJun 20267000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.95 Sq.mts. ( 322 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK30.37 Sq.mts. ( 327 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK30.73 Sq.mts. ( 331 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK30.85 Sq.mts. ( 332 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK31.9 Sq.mts. ( 343 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK35.18 Sq.mts. ( 379 Sq.ft. )7
5 Booked71% Booked
71% Booked
1RK22.3 Sq.mts. ( 240 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK43.15 Sq.mts. ( 464 Sq.ft. )7
6 Booked85% Booked
85% Booked
Shop12.89 Sq.mts. ( 139 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.57 Sq.mts. ( 157 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop14.9 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.02 Sq.mts. ( 162 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.95 Sq.mts. ( 172 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.48 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.22 Sq.mts. ( 218 Sq.ft. )1
None Booked0% Booked
0% Booked
50 total apartments / 35 apartments booked. 70% apartments booked.
Work Description in Building Rais Aaraghya Bldg No 4 D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rais Aaraghya Bldg No 5 E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rais Aaraghya Bldg No 5 E WingJun 202624000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.99 Sq.mts. ( 323 Sq.ft. )72
43 Booked59% Booked
59% Booked
1 BHK30.86 Sq.mts. ( 332 Sq.ft. )24
13 Booked54% Booked
54% Booked
1 BHK31.54 Sq.mts. ( 339 Sq.ft. )44
34 Booked77% Booked
77% Booked
2 BHK47.61 Sq.mts. ( 512 Sq.ft. )48
35 Booked72% Booked
72% Booked
Shop9.47 Sq.mts. ( 102 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop10.4 Sq.mts. ( 112 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12.44 Sq.mts. ( 134 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12.63 Sq.mts. ( 136 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.64 Sq.mts. ( 136 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.77 Sq.mts. ( 159 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop16.54 Sq.mts. ( 178 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop18.39 Sq.mts. ( 198 Sq.ft. )2
None Booked0% Booked
0% Booked
202 total apartments / 126 apartments booked. 62% apartments booked.
Work Description in Building Rais Aaraghya Bldg No 5 E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rais Aaraghya Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rais Aaraghya ProposedJun 20260000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop10.4 Sq.mts. ( 112 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12.44 Sq.mts. ( 134 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop14.77 Sq.mts. ( 159 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop16.54 Sq.mts. ( 178 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop18.39 Sq.mts. ( 198 Sq.ft. )2
None Booked0% Booked
0% Booked
10 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rais Aaraghya ProposedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Rai Residency Private Limited
for Project
Rai S Aaragya
last updated on 26 Jul 2025 as per information obtained from MARA RERA.