Project overview

Rahat Castle is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900032302. Rahat Castle is located at 1363 Of Mahim Division. This is a New being developed by Farid Hussen Solanki.

Rahat Castle has 1 BHK & 2 BHK Apartments with carpet areas ranging from 431 to 641 Sq.ft. Carpet. The Project has total 12 of which 12 are currently available for sale.

Rahat Castle is being developed on a total land area of 7218 Sq.ft. Rahat Castle has 1 Wings / Towers Rahat Castle

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Rahat Castle
  • Location:
  • 1363 Of Mahim Division
  • Const. Stage:
    New
  • Possession:
    31 May 2024
Developer Details

  • Developer:
    Farid Hussen Solanki
  • Phone:
  • Address:
  • 357 Hotel Al Taiba
Project RERA Details
MAHA REARA No: P51900032302
Project Type Residential / Group Housing
RERA Project Status New
Architect Usman Gani Shaikh
Funding Bank UNION BANK OF INDIA
Proposed Possession 31 May 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 Dec 2021
Last Retrived 26 Jul 2025
Rahat Castle QR Code
Rahat Castle
MahaRERA - P51900032302
Apartment Details & Configuration
TypeArea
1 BHK40 Sq.mts. ( 431 Sq.ft. )
2 BHK59.52 Sq.mts. ( 641 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rahat Castlelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Rahat Castle
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rahat Castle by Farid Hussen Solankilast updated on 26 Jul 2025 as per information obtained from MARA RERA.

7218 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

12 apartments in total
Total
12
Booked
0
Available
12

Saleable Area Statistics (Sq. ft.)

6427 Total
Total
6427
Booked
0
Available
6427
Total 12 apartments in project. 0 apartments booked. 0% apartments booked.
Total 6427 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Rahat Castle

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rahat CastleMay 202481101201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40 Sq.mts. ( 431 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK59.52 Sq.mts. ( 641 Sq.ft. )6
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rahat CastleCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Farid Hussen Solanki
for Project
Rahat Castle
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation