Project overview

Qualcon Palms is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000015616. Qualcon Palms is located at 21/A. This is a New being developed by Qualcon Ecostar Realty Llp.

Qualcon Palms has Habitable Room Apartments with carpet areas ranging from 210 to 210 Sq.ft. Carpet. The Project has total 296 of which 109 are currently available for sale.

Qualcon Palms is being developed on a total land area of 79546 Sq.ft. out of which 7804 Sq.ft. i.e 10% is reserved for recreational purposes. Qualcon Palms has 7 Wings / Towers Building No - 1,Building No - 2,Building No - 3,Building No - 4,Building No - 5,Building No - 6,Building No - 7

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Qualcon Palms
  • Location:
  • 21/A
  • Const. Stage:
    New
  • Possession:
    01 May 2023
Developer Details

  • Developer:
    Qualcon Ecostar Realty Llp
  • Phone:
  • Address:
  • Bhoomi Landmark
Project RERA Details
MAHA REARA No: P52000015616
Project Type Residential / Group Housing
RERA Project Status New
Architect Anarch
Funding Bank DCB BANK LIMITED
Proposed Possession 01 May 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Mar 2018
Last Retrived 28 Jul 2025
Qualcon Palms QR Code
Qualcon Palms
MahaRERA - P52000015616
Apartment Details & Configuration
TypeArea
1 RK27.25 Sq.mts. ( 293 Sq.ft. )
1 RK27.44 Sq.mts. ( 295 Sq.ft. )
1 RK30.19 Sq.mts. ( 325 Sq.ft. )
1 RK30.37 Sq.mts. ( 327 Sq.ft. )
Habitable Room19.21 Sq.mts. ( 207 Sq.ft. )
Habitable Room19.51 Sq.mts. ( 210 Sq.ft. )
Habitable Room19.43 Sq.mts. ( 209 Sq.ft. )
Habitable Room19.44 Sq.mts. ( 209 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Qualcon Palmslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Cabin
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Garden
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Brick Work Nala
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Recharge Pit
Water Supply
Ground Water
Buildings / Wings in Qualcon Palms
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Qualcon Palms by Qualcon Ecostar Realty Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

79546 Sq. ft.

Project Area

7804 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

296 apartments in total
Total
296
Booked
187
Available
109

Saleable Area Statistics (Sq. ft.)

73692 Total
Total
73692
Booked
49438
Available
24254
Total 296 apartments in project. 187 apartments booked. 63% apartments booked.
Total 73692 Sq.ft. saleable area. 49438 saleable area booked.
67% area booked.

Building No - 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No - 1Jan 20225101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK27.25 Sq.mts. ( 293 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 RK27.44 Sq.mts. ( 295 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 RK30.19 Sq.mts. ( 325 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 RK30.37 Sq.mts. ( 327 Sq.ft. )6
6 Booked100% Booked
100% Booked
Habitable Room19.21 Sq.mts. ( 207 Sq.ft. )5
4 Booked80% Booked
80% Booked
Habitable Room19.51 Sq.mts. ( 210 Sq.ft. )5
5 Booked100% Booked
100% Booked
27 total apartments / 26 apartments booked. 96% apartments booked.
Work Description in Building Building No - 1Completion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No - 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No - 2Jan 20225101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK27.25 Sq.mts. ( 293 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 RK27.44 Sq.mts. ( 295 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 RK30.19 Sq.mts. ( 325 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 RK30.37 Sq.mts. ( 327 Sq.ft. )6
5 Booked83% Booked
83% Booked
Habitable Room19.21 Sq.mts. ( 207 Sq.ft. )5
5 Booked100% Booked
100% Booked
Habitable Room19.51 Sq.mts. ( 210 Sq.ft. )5
3 Booked60% Booked
60% Booked
28 total apartments / 25 apartments booked. 89% apartments booked.
Work Description in Building Building No - 2Completion
Basement (if any)
work-in-progress60% done
60% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress60% done
60% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No - 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No - 3Jan 20225101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK B wing27.44 Sq.mts. ( 295 Sq.ft. )8
7 Booked87% Booked
87% Booked
1 RK B wing30.37 Sq.mts. ( 327 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 RK C wing30.37 Sq.mts. ( 327 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 RK C wing27.44 Sq.mts. ( 295 Sq.ft. )8
4 Booked50% Booked
50% Booked
Habitable Room Awing19.51 Sq.mts. ( 210 Sq.ft. )29
11 Booked37% Booked
37% Booked
Habitable Room Bwing19.51 Sq.mts. ( 210 Sq.ft. )23
5 Booked21% Booked
21% Booked
Habitable Room Cwing19.51 Sq.mts. ( 210 Sq.ft. )15
95 total apartments / 39 apartments booked. 41% apartments booked.
Work Description in Building Building No - 3Completion
Basement (if any)
work-in-progress60% done
60% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress60% done
60% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No - 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No - 4Jan 20225101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK27.25 Sq.mts. ( 293 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 RK27.44 Sq.mts. ( 295 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 RK30.19 Sq.mts. ( 325 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 RK30.37 Sq.mts. ( 327 Sq.ft. )4
4 Booked100% Booked
100% Booked
Habitable Room19.51 Sq.mts. ( 210 Sq.ft. )15
10 Booked66% Booked
66% Booked
28 total apartments / 22 apartments booked. 78% apartments booked.
Work Description in Building Building No - 4Completion
Basement (if any)
work-in-progress60% done
60% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress60% done
60% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No - 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No - 5Jan 20225101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK A wing30.37 Sq.mts. ( 327 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 RK A wing27.44 Sq.mts. ( 295 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 RK B wing27.44 Sq.mts. ( 295 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 RK B wing30.37 Sq.mts. ( 327 Sq.ft. )6
5 Booked83% Booked
83% Booked
Habitable Room Awing19.51 Sq.mts. ( 210 Sq.ft. )18
8 Booked44% Booked
44% Booked
Habitable Room Bwing19.51 Sq.mts. ( 210 Sq.ft. )5
1 Booked20% Booked
20% Booked
Habitable Room Bwing19.21 Sq.mts. ( 207 Sq.ft. )10
5 Booked50% Booked
50% Booked
65 total apartments / 41 apartments booked. 63% apartments booked.
Work Description in Building Building No - 5Completion
Basement (if any)
work-in-progress70% done
70% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress70% done
70% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No - 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No - 6Jan 20225101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK27.44 Sq.mts. ( 295 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 RK30.37 Sq.mts. ( 327 Sq.ft. )4
3 Booked75% Booked
75% Booked
Habitable Room19.43 Sq.mts. ( 209 Sq.ft. )4
3 Booked75% Booked
75% Booked
Habitable Room19.44 Sq.mts. ( 209 Sq.ft. )1
None Booked0% Booked
0% Booked
Habitable Room19.51 Sq.mts. ( 210 Sq.ft. )20
10 Booked50% Booked
50% Booked
34 total apartments / 21 apartments booked. 61% apartments booked.
Work Description in Building Building No - 6Completion
Basement (if any)
work-in-progress60% done
60% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress60% done
60% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No - 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No - 7Jan 20225101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Habitable Room19.51 Sq.mts. ( 210 Sq.ft. )19
13 Booked68% Booked
68% Booked
19 total apartments / 13 apartments booked. 68% apartments booked.
Work Description in Building Building No - 7Completion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Qualcon Ecostar Realty Llp
for Project
Qualcon Palms
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation