Project overview

Q Residences R3 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017304. Q Residences R3 is located at Gen 4/1. This is a New being developed by Aurum Realestate Developers Limited.

Q Residences R3 has 2 BHKL & 2 BHKS Apartments with carpet areas ranging from 638 to 645 Sq.ft. Carpet. The Project has total 240 of which 34 are currently available for sale.

Q Residences R3 is being developed on a total land area of 59742 Sq.ft. out of which 5397 Sq.ft. i.e 9% is reserved for recreational purposes. Q Residences R3 has 1 Wings / Towers R3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Q Residences R3
  • Location:
  • Gen 4/1
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Aurum Realestate Developers Limited
  • Phone:
  • Address:
  • Loma It Park/Q Residences
Project RERA Details
MAHA REARA No: P51700017304
Project Type Residential / Group Housing
RERA Project Status New
Architect Niral Patel
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Jul 2022
Last Retrived 26 Jul 2025
Q Residences R3 QR Code
Q Residences R3
MahaRERA - P51700017304
Apartment Details & Configuration
TypeArea
2 BHKL59.95 Sq.mts. ( 645 Sq.ft. )
2 BHKS59.28 Sq.mts. ( 638 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Q Residences R3last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
2700.05 Sq. Mtr. Including Podium
Community Buildings40% completed
40% Complete
Fitness Centre
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Electrical Metre Room/Substation
Energy management70% completed
70% Complete
Led Lights &Amp; Solar System
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Hydrant &Amp; Sprinkler System
Landscaping & Tree Planting
Ground Covers &Amp; Shrubs
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp
Solid Waste Management And Disposal
Garbage Chute &Amp; Municipal Waste Collection System
Storm Water Drains50% completed
50% Complete
Concrete Drains
Street Lighting
Led Street Lights
Treatment And Disposal Of Sewage And Sullage Water80% completed
80% Complete
Sewage Treatment Plant
Water Conservation, Rain water Harvesting100% completed
95% Complete
Ugt Tank &Amp; Rain Water Harwesting Tank
Water Supply100% completed
95% Complete
Midc Water Supply
Buildings / Wings in Q Residences R3
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Q Residences R3 by Aurum Realestate Developers Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

59742 Sq. ft.

Project Area

5397 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

240 apartments in total
Total
240
Booked
206
Available
34

Saleable Area Statistics (Sq. ft.)

154007 Total
Total
154007
Booked
132204
Available
21803
Total 240 apartments in project. 206 apartments booked. 85% apartments booked.
Total 154007 Sq.ft. saleable area. 132204 saleable area booked.
86% area booked.

R3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R3Dec 20223510142821
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHKL59.95 Sq.mts. ( 645 Sq.ft. )120
105 Booked87% Booked
87% Booked
2 BHKS59.28 Sq.mts. ( 638 Sq.ft. )120
101 Booked84% Booked
84% Booked
240 total apartments / 206 apartments booked. 85% apartments booked.
Work Description in Building R3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Aurum Realestate Developers Limited
for Project
Q Residences R3
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation