Project overview

Q Islands R6 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700048523. Q Islands R6 is located at Part Of Gen 4/1. This is a New being developed by Aurum Realestate Developers Limited.

Q Islands R6 has 2 BHK L & 4.5 BHK Apartments with carpet areas ranging from 1408 to 695 Sq.ft. Carpet. The Project has total 254 of which 254 are currently available for sale.

Q Islands R6 is being developed on a total land area of 16595 Sq.ft. out of which 6178 Sq.ft. i.e 37% is reserved for recreational purposes. Q Islands R6 has 1 Wings / Towers Q Islands R6

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Q Islands R6
  • Location:
  • Part Of Gen 4/1
  • Const. Stage:
    New
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    Aurum Realestate Developers Limited
  • Phone:
  • Address:
  • Loma It Park/Q Residences
Project RERA Details
MAHA REARA No: P51700048523
Project Type Residential / Group Housing
RERA Project Status New
Architect Abhikalpan Architects & Planners
Funding Bank STATE BANK OF INDIA
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 06 Jan 2023
Last Retrived 26 Jul 2025
Q Islands R6 QR Code
Q Islands R6
MahaRERA - P51700048523
Apartment Details & Configuration
TypeArea
2 BHK L64.6 Sq.mts. ( 695 Sq.ft. )
4.5 BHK130.84 Sq.mts. ( 1408 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Q Islands R6last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Provided
Community Buildings
Club House
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room
Energy management
Led Lighting
Fire Protection And Fire Safety Requirements
Hydrant And Sprinkler System
Landscaping & Tree Planting
Ground Covers And Shrubs
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp
Solid Waste Management And Disposal
Municipal Waste Collection System
Storm Water Drains
Concrete
Street Lighting
Led Street Lights
Treatment And Disposal Of Sewage And Sullage Water25% completed
25% Complete
Stp
Water Conservation, Rain water Harvesting
Zero Discharge
Water Supply85% completed
85% Complete
Ugt And Rain Water Harvesting Tank
Buildings / Wings in Q Islands R6
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Q Islands R6 by Aurum Realestate Developers Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

16595 Sq. ft.

Project Area

6178 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

254 apartments in total
Total
254
Booked
0
Available
254

Saleable Area Statistics (Sq. ft.)

204427 Total
Total
204427
Booked
0
Available
204427
Total 254 apartments in project. 0 apartments booked. 0% apartments booked.
Total 204427 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Q Islands R6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Q Islands R6Dec 2027911120363
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK L64.6 Sq.mts. ( 695 Sq.ft. )215
None Booked0% Booked
0% Booked
4.5 BHK130.84 Sq.mts. ( 1408 Sq.ft. )39
None Booked0% Booked
0% Booked
254 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Q Islands R6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
work-in-progress90% done
90% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress23% done
23% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Aurum Realestate Developers Limited
for Project
Q Islands R6
last updated on 26 Jul 2025 as per information obtained from MARA RERA.