Project overview

Pushpa Park is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800010832. Pushpa Park is located at 757. This is a Ongoing being developed by Vas Infrastructure Ltd..

Pushpa Park has 0 Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 932 of which 523 are currently available for sale.

Pushpa Park is being developed on a total land area of 162732 Sq.ft. out of which 40295 Sq.ft. i.e 25% is reserved for recreational purposes. Pushpa Park has 11 Wings / Towers Ashopalav Existing,Extension Of Pushp Vinod 4 And Pushp Vinod 2 Podi,Pushp Vinod 1 A B Wings Existing,Pushp Vinod 1 Wing C D Proposed,Pushp Vinod 1 Wing E Proposed 16Th To 30Th Floor,Pushp Vinod 1 Wing E Proposed 31St To 50Th Floor,Pushp Vinod 1 Wing E Proposed Upto 15Th Floor,Pushp Vinod 2 A B Wings Existing,Pushp Vinod 2 Wing C Proposed,Pushp Vinod 4 Existing,Pushpa Park Parking And Public Parking Lot And Cl

ProjectDeveloperLocationPossession
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
Shreyas SapphireVinod Premjibhai TrapasiaPlot No- 1D-2 Sector-3A Karanjade Panvel Navi Mumbai31-03-2025 00:00:00
Upper Thane-Mlcp C ShopsMacrotech Developers Limited60/2 Part,60/1 Part31-12-2024 00:00:00
Innovative Infocom And It ParksInnovative Infocom & It Parks Private LimitedPlot No. Gen 71/1 And Gen 71/1/126-11-2027 00:00:00
Prem Ratna PlazaAditi Home MakerSurvey No 84 Hissa No 331-12-2027 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
SambhaviShree Vakratunda DevelopersSurvey No 531-10-2024 00:00:00
Shree Mangal Narayan ResidencyN V ConstructionCts 9721 To973431-12-2023 00:00:00
Vakratunda HomesNarayan Sunil RanePlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Siddhivinayak GardensA1 Buildcon991, 2, 3 And 1001830-12-2024 00:00:00
Shree ShaliniJay Service And ConsultantCts No 251 And 252A30-09-2023 00:00:00
M Square It ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
Arnav Wing DPrashant Raghunath PatilGut No 55 Hissa No 131-12-2027 00:00:00
Smit VistaSmit Megastructures(Old) Survey No. 242/17, 18,, ( New) Survey No. 33/17, 1831-12-2029 00:00:00
Ram Smruti Chs LtdSai Prakash Builders And DevelopersPlot No 139 Cts No 392531-12-2026 00:00:00
Kamdhenu CrownKamdhenu GreenPlot No-6+7, Sector-19, Sanpada31-12-2029 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Shree Ganesh SymphonyPawar GroupS. No.172, H.No.1/801-12-2025 00:00:00
Trimurti GardenSai Narayan DevelopersSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRaj GroupS No 39, H No 1,230-12-2022 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Hemant Shishir Co.Op HsgNarendra Kalyanji Patel3512-352131-12-2023 00:00:00
Fortune EmporioQuanta Realty LlpCts No 4090 To 4096,4166 To 4171,4240,4241 New Sno 37 Hno 3C31-12-2025 00:00:00
The Valaji EstateFore Holdings4065,4093-4097,4099-410205-07-2024 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Balaji AnnexM/S Om Swayambhu Siddhivinayak Builders And DevelopersSurvey No 93/3, 93/4, 93/530-12-2026 00:00:00
Arya ArianaAshapura Corporation5664/A30-03-2024 00:00:00
GajananGk BuildconB6330-06-2023 00:00:00
Belvedere IMacrotech Developers Limited25/2A Part 25/2B Part31-07-2028 00:00:00
Jay Meghdoot ChslS R DevelopersS.No.46/H.No.6/A/13,Plot No.2731-12-2025 00:00:00
Foresta EMacrotech Developers Limited53/1(Part), 53/2(Part), 53/3(Part)31-08-2028 00:00:00
Paras Apartment Co-Op. Housing Society LtdShiv Infra1314, Village Kohoj-Khuntvali02-06-2027 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
Plot No -1A,Sector -19, Vashi Truck TerminalCity And Industrial Development Corporation Of Maharashtra LimitedPlot No -1A31-12-2025 00:00:00
Jp HarmonyJp Corp Developers (India) Llp12931-12-2023 00:00:00
Deep Royal ResidencyM/S. Deepali Infracon LlpSurvey No.80 Hissa No.231-12-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Unique Estate - IiUnique Shanti RealtorsOld S.No. 400 New S.No. 58 Hissa No. 2 And 330-06-2028 00:00:00
Musica ApartmentE I ConstructionCts No. 36 B/1, Tikka No.8 Sector 2 Congested31-12-2026 00:00:00
Royal VillasAdarsh EnterprisesCts No 3535, Plot No 7, Final Plot No 7 Mauje Bhiwandi31-12-2025 00:00:00
Sky ViewShreeji IconSurvey No 115, Hiisa No 6(P)30-11-2028 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Fiora EMacrotech Developers Limited260/1A (Pt)31-03-2026 00:00:00
Savaliya HeightsShree Savaliya Homes LlpOld Sno 477 New Sno 119 Hno 131-12-2026 00:00:00
Ramakant ArcadeVastu EnterprisesCts No. 244, 25431-05-2023 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Vrundavan DhamShikhar LifespacesS.No 13, H No. 1 P31-12-2023 00:00:00
Riverwood Park Building No -3Shree Khidkaleshwar Property Developers Pvt. Ltd.26/2, 26/3 All In Parts30-06-2026 00:00:00
Vishwajeet Empire NxGulabrao Baburao Karanjule PatilSurvey No 39 Hissa No 2A, Hissa No 2B, Hissa No 2C And Hissa No 2D23-06-2026 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Cyber Square - 1Greenscape It Park LlpD-102,D-103 &D-10431-03-2027 00:00:00
Delta LuxuriaShreenathji Organisers Pvt LtdPlot No 6130-04-2027 00:00:00
Giriraj SparshDura Vida Associates77 Tika No 18 Naupada30-06-2025 00:00:00
Kamdhenu VogueM/S Kamdhenu Lifespaces20 Plus 2131-03-2027 00:00:00
Sai Galaxy A- Wing And C- WingJash DevelopersS. No. 10 Hissa No. 231-12-2025 00:00:00
Tanishka ResidencyAnmol DevelopersSurvey No 61 Hissa No 2C/9A/10D/2B, Survey No 80 Hissa No 9A15-01-2023 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Fenkin EmpireFen-Kin Realtors & Project Pvt LtdCts No 313 And 314B31-07-2023 00:00:00
Sai PearlM/S Mitra RealityS No 67 H No 331-12-2025 00:00:00
Baradia EkdantBaradia RealtyCts No 259,26022-07-2026 00:00:00
Spm Dream City Phase 2Swastik LifespaceSurvey No 52, Hissa No 4/531-12-2030 00:00:00
Blue Ladder Business EnclaveBlue LadderW-212 Part, W-212, W-21315-08-2028 00:00:00
Navrang HeightsAbode Builders & DevelopersS No 101 Hissa No 9(B) Pt And 9(C) Sector 0531-12-2027 00:00:00
L And T Realty Evara Heights T4Elante Properties Private LimitedS. No. 502/A(Pt), 67(Pt), 83/1 (Pt)30-04-2030 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Mukund VishnuShree Swami Samartha AssociatesTika No 12 Cst No 103A 2A 103A 2B Village Pachpakhadi30-12-2021 00:00:00
Anjani SparshGeeta Space Realtors249-2, 249-730-12-2020 00:00:00
Mohan Nano Estates IiiMohan Lifespaces Llp24/1,24/2P,24/6P,24/8,24/9,25/1,25/231-12-2019 00:00:00
Building No. 2 Wings A And B AlpineSd Corporation Private Limited840 A/130-12-2020 00:00:00
PrathamRoodraksh Probuilder And Infracon Private LimitedCts 284B 284D31-12-2019 00:00:00
Silver SpringAnudan Properties Private LimitedF. P.4330-12-2022 00:00:00
Shree Shambhav DarshanSwastik Enterprises2071 To 2075 Of Village Ghatkopar - Kirol30-12-2021 00:00:00
Gulraj TrinityM/S Reliable Builders And DevelopersPlot No B/3 And B/4 Survey No 161 Cts No 1 A Pt30-06-2021 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Unique ElanzaUnique Star Developers LlpS No 29 H No 4 And S No 30 H No 5 Village Ghodbunder25-03-2027 00:00:00
Sindhri SagarRounak Shyam PanjwaniU No 75(P) Cts No 30783 9458 (P) Sheet No 49 R .No 163931-12-2024 00:00:00
Swarup TowerBaba RealtySurvey No 124 Hissa No 1/B31-12-2024 00:00:00
Empire Industrial Centrum Phase-IiiEmpire Industries Limited22R30-03-2026 00:00:00
Empire Industrial Centrum Phase-IvEmpire Industries Limited2230-03-2025 00:00:00
Seasons Sahara Building No 2Samarth Sai Builders & DevelopersS No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan30-12-2024 00:00:00
Rock Mount ResidencyBuilt Charms46/6/A 46/1/A/5 46/1/A/3/4/6 47/2/A30-06-2026 00:00:00
Chandrabhaga HeightsJai Santoshi Mata Construction Builders And DevelopersS. No. 15731-07-2024 00:00:00
Ekatva SignetBhoomi DevelopersTikka No.15 Cts No.39/A/1/B Pt31-12-2023 00:00:00
Vivaan HeightsShree EnterprisesSurvey No 84, Hissa No 1431-12-2029 00:00:00
Rutu SamruddhiHarasiddh Realtors43/2B/231-12-2029 00:00:00
Seasons Sahara Nano Building No A And BSamarth Sai Builders & DevelopersS No. 23/ H. No.2, Village Adivali Dhokali31-12-2026 00:00:00
Shripat GalaxyShree Shripat Builders & DevelopersS. No 192/3/A, Sector 11, Village Shil31-12-2029 00:00:00
Kapleshwara ResidencyKapleshwara Homes Llp119/6C (Old), 84/6C (New)31-12-2029 00:00:00
Sara TowerHope Builders And Developers233 And 23431-12-2026 00:00:00
Vedang Lake CityVedang ConstructionS. No. 4 H. No. 2/1 And S. No. 12 H. No 1/331-12-2025 00:00:00
Manovi PrithviManovi PrithviS. No. 217 H. No.3/H Plot No. 731-05-2024 00:00:00
Sarvoday SymphonySwastik RealtorsSurvey No 91 Old 25New Hissa No 1 Survey 92 Old 3 New Hissa No 330-06-2026 00:00:00
PitrukrupaMellennium RealtyOld Survey No 326/A New Survey No 229/Part Plot No 33 Cts No 680 And68131-03-2023 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Tulsi AagmanRaj GroupS No 36 H No-1,2,3 S No-37 H No-1 S No-40 H No-530-04-2025 00:00:00
Raheja Solaris-1Raheja Universal (Pvt.) Ltd.Gen-2/1/B30-12-2026 00:00:00
Shree Vighneshwar HeightsMahesh Shyamsundar Goyal114/5/3/3,115/1,115/231-03-2027 00:00:00
Belvedere-B And CMacrotech Developers Limited212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
Sai Dream OneGls InfrastructuresS No.88, H No 6 & 731-12-2025 00:00:00
Neelkanth Palm AvenueNeelkanth InfratechPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Vijay HeightsShree Jari Mari ResidencyCts No.14137,S.No.44 H.No.2031-03-2028 00:00:00
North Imperial Greens - Tower 1Skylark Buildspace Private LimitedCts No. 450 Pt, 449 Pt, 451, 455/A Pt, 460 Pt, 461 Pt, 464/1 Pt, 465/1 Pt, 538/1, 46331-12-2032 00:00:00
Jasper C And DMacrotech Developers Limited54/5(Pt), 54/15(Pt)31-08-2028 00:00:00
Kamdhenu PinnacleKamdhenu GreenPlot No. 44, Sector-13, Nerul31-12-2029 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Runwal Gardens Phase 4 Bldg No. 33-34Runwal Residency Private LimitedSurvey Nos 4/5Pt, 5/1Pt, 5/2Pt, 5/3Pt, 5/4Pt, 5/5Pt30-06-2025 00:00:00
Sahara ResidencySahara ResidencySurvey No 20 Hissa No 931-12-2024 00:00:00
ZenR A ConstructionCts No 2086430-06-2024 00:00:00
Navrang Co Op Hsg SocietyYadav Bros ConstructionPlot No. 3, Gut No 5431-12-2024 00:00:00
Prathamesh ChslNirmal DevelopersSurvey No 26 Hissa No 2A Plot No 3 (Old Plot No.18)31-12-2024 00:00:00
S.S. ResidencyAl Siraj Construction10631-12-2025 00:00:00
Sunteck Forestworld 3Sunteck Realty Holdings Pvt Ltd311Pt31-12-2026 00:00:00
Swanand Bliss Phase - IiM/S Nityanand RealtorsSurvey No. 58 Hissa No. 4/330-06-2025 00:00:00
Akankshapurti ChslS R DevelopersSurvey No 32 Hissa No 2A Plot No 1531-12-2024 00:00:00
Celeste 612Hiralal Ramnarayan GuptaC. T. S No 1057 To 1083 At Village Mumbra Dist Thane31-12-2027 00:00:00
Shree Laxmi Narayan PrasadLaxmi Realty93/A/2931-12-2025 00:00:00
Neelkanth Palm PresidentNeelkanth InfratechPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IiShree Balaji DevelopersSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAadarsh DevelopersCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Emerald A And BMacrotech Developers Limited54/5(Pt)31-08-2028 00:00:00
Madar SignatureMadar Builders & DevelopersOld S.No.520,New S.No.57 Hs.No 1/B 1/H31-12-2027 00:00:00
Fortune GalaxySai ConstructionC.T.S. No. 22791, 22790, 31140, Block No. A-312/62331-07-2027 00:00:00
Sahyadri LifespacesSahyadri Lifespaces9414-06-2030 00:00:00
Rajeshwari Residency Phase IiShree Siddhi ConstructionSurvey No 30/2, 30/3/2/1, 30/3/2/230-03-2025 00:00:00
Pinnacle RoyalPinnacle InfraGut No41, Hissa No 20, Plot No 1530-03-2023 00:00:00
Kohinoor AashiyanaKgi Realty Private Limited24/3 37/130-10-2024 00:00:00
Shivalaya Complex Ph 2 Wing BM/S Balaji Group Of CompaniesSurvey No 17 Hissa No 131-12-2022 00:00:00
Amina Bi Inamdar TowerRoyal Infra61 To 6431-03-2024 00:00:00
Seva SmrutiNeelpadma AssociatesC.T.S.No 1150 To 115131-05-2024 00:00:00
Reliable ResidencyReliable InfraventuresPLOT NO 72 SC S NO 12, 130-04-2024 00:00:00
Aadi AarambhNirman Construction129/1 A And 129/1B28-02-2018 00:00:00
Pushpa ParkVas Infrastructure Ltd.75715-08-2023 00:00:00
Shilpa ChslOrchid Builtcon Pvt. Ltd.F P No 11830-12-2022 00:00:00
Allure CommercialAadi Properties Llp1196-B30-12-2024 00:00:00
Shreeji ParadiseBuilding Technologies India Pvt. Ltd.414C Pt. 414C/26 To 8830-12-2022 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Infinity Square28-Aeon Infinity LlpC.T.S. No. 434P31-12-2027 00:00:00
Mm Valley D1 D2Alfa Enterprises55/131-12-2028 00:00:00
Pearl ComplexM/S Sai Developers33/1/A & 33/1/B31-12-2026 00:00:00
Ramdev BaseraRamdev BaseraOld Sno 225 New Sno 188 Hno 7, 9Pt, 10Pt31-12-2025 00:00:00
Navkar AvenueNavkar EnterprisesCts No 18 & 19/ T No 1031-12-2025 00:00:00
Krishna Highlands Phase 1M/S Rohan ConstructionSurvey No 6 Hissa No 3B31-12-2025 00:00:00
Platinum Square B 1Radmin Developers & Consultants Private Limited21/2,21/3/1,22/1/2,1/3,1/5,1/6,1/830-05-2025 00:00:00
Aditya NishantPremnarayan Shukla14229-01-2023 00:00:00
Ten X Habitat Raymond Realty Tower JRaymond Limited126B 1/1 Part, 129/1 Part30-06-2025 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Shubham ResidencyShubham RealtyPlot No 79,Sector 2130-06-2025 00:00:00
Shree Mahalaxmi ResidencyShree Gajanan Builders And DevelopersS No 93 / H No A, S No 9431-07-2028 00:00:00
Thane ProjectMacrotech Developers Limited144/1 Part31-07-2029 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Shivdas ArcadeAdi EnterprisesOld Survey No. 245 Hissa No. 1 And New Survey No. 9 Hissa No. 131-01-2023 00:00:00
Watson ApartmentSai Prakash Builders And DevelopersPlot No 292, Cts No 440731-10-2024 00:00:00
Arihant Aaradhya Phase IArihant Superstructures Limited1431-03-2029 00:00:00
Kohinoor Kandivali ChslAmisha Constructions Pvt Ltd92430-04-2022 00:00:00
RootsMahindra Lifespace Developers Limited168 A30-09-2023 00:00:00
Shubham AtriaDipal Laxmichand ShahBuild N0 132 Mhada Layout 5677 Pt 5678 Survey No 236 A F P No 316Pt 31730-12-2022 00:00:00
GlenmarkMandar Construction (Mukund Balu Keni Huf)66/131-03-2022 00:00:00
Sunteck Forestworld 2Sunteck Realty Holdings Pvt Ltd309Pt30-06-2026 00:00:00
Magnus PrideMagnus BuildersS No. 69, H No. 10 And S No. 70, H No. 131-03-2024 00:00:00
EquinoxShreenath EnterprisesCts No.226A/2, Sub Plot No 1231-12-2028 00:00:00
Spm MidtownSpm Innovation LlpSurvey No 29/A/15, 29/A/1731-12-2029 00:00:00
Shirish ResidencyRl Constructions42/A/19/B/1, Cts No. 7396 To 740531-12-2026 00:00:00
The Address By Gs Tower ERaymond Limited65,66, 118/1, 118/2, 119/A/1/A,119/A/1/B,119/A/2,119-B,120/1/3,131/A1,131/B,132/231-03-2030 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Aroma HeightsVastu Sai Builders And DevelopersSurvey No 5 (New) 94 (Old) Hissa No 231-12-2028 00:00:00
Regency OnyxRegency Nirman LtdSurvey No 52 Hissa No 13B30-06-2025 00:00:00
Dosti West County - Dosti Nest - Phase 3Dosti Enterprises21(Pt), 22B, 25/5B, 25/6(Pt), 25/7B(Pt), 25/8(Pt), 25/10/A/2(Pt)31-08-2027 00:00:00
Pralhad Sakar ArcadeSakar DevelopersCts 1618 To 163230-06-2027 00:00:00
Priyadarshini HeightsAgnihotri RealtySurvey No. 29/2/A30-10-2027 00:00:00
Emperia I ParkManometer India Private LimitedPlot No-F-6-4, Midc Thane It Park Indl Area31-12-2030 00:00:00
Season Sahara Building No -6Samarth Sai Builders & DevelopersS No 33 H No 11, S No 34 H No 9, 10, 11, 12, 14 & 15 Of Village Pisavali 30-04-2026 00:00:00
Omkar AvenueOmkar RealtorsCts No. 761 (Old Survey No.87/11 Plot No.11)31-03-2028 00:00:00
Project Details
  • Project:
    Pushpa Park
  • Location:
  • 757
  • Const. Stage:
    Ongoing
  • Possession:
    15 Aug 2023
Developer Details

  • Developer:
    Vas Infrastructure Ltd.
  • Phone:
  • Address:
  • Jwala Estate
Project RERA Details
MAHA REARA No: P51800010832
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Tee Arch
Funding Bank
Proposed Possession 15 Aug 2023
Revised Possession 15 Aug 2023
Extended Possession
Litigations No Litigations
Last Modified 31 Aug 2017
Last Retrived 26 Jul 2025
Pushpa Park QR Code
Pushpa Park
MahaRERA - P51800010832
Apartment Details & Configuration
TypeArea
1 BHK33.38 Sq.mts. ( 359 Sq.ft. )
1 BHK35.29 Sq.mts. ( 380 Sq.ft. )
1 BHK56.39 Sq.mts. ( 607 Sq.ft. )
1 BHK70.4 Sq.mts. ( 758 Sq.ft. )
3 BHK97.81 Sq.mts. ( 1053 Sq.ft. )
4 BHK111.68 Sq.mts. ( 1202 Sq.ft. )
1 BHK39.8 Sq.mts. ( 428 Sq.ft. )
1 BHK44.52 Sq.mts. ( 479 Sq.ft. )
2 BHK65.11 Sq.mts. ( 701 Sq.ft. )
2 BHK66.16 Sq.mts. ( 712 Sq.ft. )
2 BHK69.63 Sq.mts. ( 749 Sq.ft. )
2 BHK71.88 Sq.mts. ( 774 Sq.ft. )
2 BHK71.89 Sq.mts. ( 774 Sq.ft. )
2BHk94.83 Sq.mts. ( 1021 Sq.ft. )
3 BHK94.97 Sq.mts. ( 1022 Sq.ft. )
3 BHK91.15 Sq.mts. ( 981 Sq.ft. )
5 BHK173.61 Sq.mts. ( 1869 Sq.ft. )
6 BHK166.02 Sq.mts. ( 1787 Sq.ft. )
1 BHK32.23 Sq.mts. ( 347 Sq.ft. )
1 BHK33.02 Sq.mts. ( 355 Sq.ft. )
1 BHK33.99 Sq.mts. ( 366 Sq.ft. )
1 BHK36.8 Sq.mts. ( 396 Sq.ft. )
1 BHK39.47 Sq.mts. ( 425 Sq.ft. )
1 BHK40.42 Sq.mts. ( 435 Sq.ft. )
1 BHK40.63 Sq.mts. ( 437 Sq.ft. )
2 BHK61.2 Sq.mts. ( 659 Sq.ft. )
2 BHK61.54 Sq.mts. ( 662 Sq.ft. )
2 BHK71.02 Sq.mts. ( 764 Sq.ft. )
2 BHK72.93 Sq.mts. ( 785 Sq.ft. )
3 BHK92.75 Sq.mts. ( 998 Sq.ft. )
2 BHK72.02 Sq.mts. ( 775 Sq.ft. )
Triplex Floor717 Sq.mts. ( 7718 Sq.ft. )
1 BHK36.49 Sq.mts. ( 393 Sq.ft. )
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )
1 BHK41.83 Sq.mts. ( 450 Sq.ft. )
1 BHK42.71 Sq.mts. ( 460 Sq.ft. )
1 BHK48.73 Sq.mts. ( 525 Sq.ft. )
1.5 BHK54.84 Sq.mts. ( 590 Sq.ft. )
1.5 BHK59.35 Sq.mts. ( 639 Sq.ft. )
1.5 BHK65.97 Sq.mts. ( 710 Sq.ft. )
1RK39.99 Sq.mts. ( 430 Sq.ft. )
1RK36.77 Sq.mts. ( 396 Sq.ft. )
1RK38.29 Sq.mts. ( 412 Sq.ft. )
1RK21.27 Sq.mts. ( 229 Sq.ft. )
1RK25.73 Sq.mts. ( 277 Sq.ft. )
1RK28.15 Sq.mts. ( 303 Sq.ft. )
1RK28.64 Sq.mts. ( 308 Sq.ft. )
1RK30.74 Sq.mts. ( 331 Sq.ft. )
1RK31.22 Sq.mts. ( 336 Sq.ft. )
1RK32.81 Sq.mts. ( 353 Sq.ft. )
1RK34.15 Sq.mts. ( 368 Sq.ft. )
2 BHK69.97 Sq.mts. ( 753 Sq.ft. )
2 BHK61.83 Sq.mts. ( 666 Sq.ft. )
2 BHK62.48 Sq.mts. ( 673 Sq.ft. )
2 BHK54.88 Sq.mts. ( 591 Sq.ft. )
2 BHK55.17 Sq.mts. ( 594 Sq.ft. )
2 BHK57.46 Sq.mts. ( 618 Sq.ft. )
1.5 BHK45.78 Sq.mts. ( 493 Sq.ft. )
1RK26.94 Sq.mts. ( 290 Sq.ft. )
1.5 bhk58.35 Sq.mts. ( 628 Sq.ft. )
1.5 bhk56.34 Sq.mts. ( 606 Sq.ft. )
1bhk56.79 Sq.mts. ( 611 Sq.ft. )
1bhk39.39 Sq.mts. ( 424 Sq.ft. )
1bhk39.81 Sq.mts. ( 429 Sq.ft. )
1bhk43.91 Sq.mts. ( 473 Sq.ft. )
1bhk44.74 Sq.mts. ( 482 Sq.ft. )
1bhk45 Sq.mts. ( 484 Sq.ft. )
1bhk54.16 Sq.mts. ( 583 Sq.ft. )
1bhk55 Sq.mts. ( 592 Sq.ft. )
2bhk65.12 Sq.mts. ( 701 Sq.ft. )
2bhk66.17 Sq.mts. ( 712 Sq.ft. )
2bhk69.64 Sq.mts. ( 750 Sq.ft. )
2bhk69.76 Sq.mts. ( 751 Sq.ft. )
2bhk92.02 Sq.mts. ( 991 Sq.ft. )
3bhk86.76 Sq.mts. ( 934 Sq.ft. )
00 Sq.mts. ( 0 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pushpa Parklast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
As Per Mcgm
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Mcgm
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Mcgm
Landscaping & Tree Planting100% completed
95% Complete
As Per Mcgm
Open Parking100% completed
95% Complete
As Per Mcgm
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Mcgm
Solid Waste Management And Disposal100% completed
95% Complete
As Per Mcgm
Storm Water Drains100% completed
95% Complete
As Per Mcgm
Street Lighting100% completed
95% Complete
As Per Mcgm
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
As Per Mcgm
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Mcgm
Water Supply100% completed
95% Complete
As Per Mcgm
Buildings / Wings in Pushpa Park
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pushpa Park by Vas Infrastructure Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

162732 Sq. ft.

Project Area

40295 Sq. ft.

Recreational Open Space

Total 11

Wings / Towers in Project

Apartments Statistics

932 apartments in total
Total
932
Booked
409
Available
523

Saleable Area Statistics (Sq. ft.)

546776 Total
Total
546776
Booked
248044
Available
298731
Total 932 apartments in project. 409 apartments booked. 43% apartments booked.
Total 546776 Sq.ft. saleable area. 248044 saleable area booked.
45% area booked.

Ashopalav Existing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ashopalav ExistingJan 1900110000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.38 Sq.mts. ( 359 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK35.29 Sq.mts. ( 380 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK56.39 Sq.mts. ( 607 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK70.4 Sq.mts. ( 758 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK97.81 Sq.mts. ( 1053 Sq.ft. )10
10 Booked100% Booked
100% Booked
4 BHK111.68 Sq.mts. ( 1202 Sq.ft. )10
10 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building Ashopalav ExistingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Extension Of Pushp Vinod 4 And Pushp Vinod 2 Podi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Extension Of Pushp Vinod 4 And Pushp Vinod 2 PodiJan 19006001491
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.8 Sq.mts. ( 428 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK44.52 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK65.11 Sq.mts. ( 701 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.16 Sq.mts. ( 712 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK69.63 Sq.mts. ( 749 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK71.88 Sq.mts. ( 774 Sq.ft. )2
None Booked0% Booked
0% Booked
9 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Extension Of Pushp Vinod 4 And Pushp Vinod 2 PodiCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Pushp Vinod 1 A B Wings Existing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod 1 A B Wings ExistingJan 1900201012984
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK71.89 Sq.mts. ( 774 Sq.ft. )34
34 Booked100% Booked
100% Booked
2BHk94.83 Sq.mts. ( 1021 Sq.ft. )26
26 Booked100% Booked
100% Booked
3 BHK94.97 Sq.mts. ( 1022 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK91.15 Sq.mts. ( 981 Sq.ft. )26
26 Booked100% Booked
100% Booked
5 BHK173.61 Sq.mts. ( 1869 Sq.ft. )2
2 Booked100% Booked
100% Booked
6 BHK166.02 Sq.mts. ( 1787 Sq.ft. )2
2 Booked100% Booked
100% Booked
94 total apartments / 94 apartments booked. 100% apartments booked.
Work Description in Building Pushp Vinod 1 A B Wings ExistingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Pushp Vinod 1 Wing C D Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod 1 Wing C D ProposedJan 190023131401
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.23 Sq.mts. ( 347 Sq.ft. )15
None Booked0% Booked
0% Booked
1 BHK33.02 Sq.mts. ( 355 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK33.99 Sq.mts. ( 366 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK36.8 Sq.mts. ( 396 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK39.47 Sq.mts. ( 425 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHK40.42 Sq.mts. ( 435 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK40.63 Sq.mts. ( 437 Sq.ft. )17
None Booked0% Booked
0% Booked
2 BHK61.2 Sq.mts. ( 659 Sq.ft. )17
None Booked0% Booked
0% Booked
2 BHK61.54 Sq.mts. ( 662 Sq.ft. )17
None Booked0% Booked
0% Booked
148 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pushp Vinod 1 Wing C D ProposedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Pushp Vinod 1 Wing E Proposed 16Th To 30Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod 1 Wing E Proposed 16Th To 30Th FloorJan 190015000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK71.02 Sq.mts. ( 764 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK72.93 Sq.mts. ( 785 Sq.ft. )30
None Booked0% Booked
0% Booked
3 BHK92.75 Sq.mts. ( 998 Sq.ft. )15
None Booked0% Booked
0% Booked
58 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pushp Vinod 1 Wing E Proposed 16Th To 30Th FloorCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Pushp Vinod 1 Wing E Proposed 31St To 50Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod 1 Wing E Proposed 31St To 50Th FloorJan 190020000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.02 Sq.mts. ( 775 Sq.ft. )14
None Booked0% Booked
0% Booked
2 BHK72.93 Sq.mts. ( 785 Sq.ft. )34
None Booked0% Booked
0% Booked
3 BHK92.75 Sq.mts. ( 998 Sq.ft. )17
None Booked0% Booked
0% Booked
Triplex Floor717 Sq.mts. ( 7718 Sq.ft. )1
None Booked0% Booked
0% Booked
66 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pushp Vinod 1 Wing E Proposed 31St To 50Th FloorCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Pushp Vinod 1 Wing E Proposed Upto 15Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod 1 Wing E Proposed Upto 15Th FloorJan 190016000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK71.02 Sq.mts. ( 764 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK72.93 Sq.mts. ( 785 Sq.ft. )30
None Booked0% Booked
0% Booked
3 BHK92.75 Sq.mts. ( 998 Sq.ft. )15
None Booked0% Booked
0% Booked
58 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pushp Vinod 1 Wing E Proposed Upto 15Th FloorCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Pushp Vinod 2 A B Wings Existing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod 2 A B Wings ExistingJan 19002311140171
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.49 Sq.mts. ( 393 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK41.83 Sq.mts. ( 450 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK42.71 Sq.mts. ( 460 Sq.ft. )50
50 Booked100% Booked
100% Booked
1 BHK48.73 Sq.mts. ( 525 Sq.ft. )2
2 Booked100% Booked
100% Booked
1.5 BHK54.84 Sq.mts. ( 590 Sq.ft. )2
2 Booked100% Booked
100% Booked
1.5 BHK59.35 Sq.mts. ( 639 Sq.ft. )3
3 Booked100% Booked
100% Booked
1.5 BHK65.97 Sq.mts. ( 710 Sq.ft. )3
3 Booked100% Booked
100% Booked
1RK44.52 Sq.mts. ( 479 Sq.ft. )8
8 Booked100% Booked
100% Booked
1RK39.99 Sq.mts. ( 430 Sq.ft. )6
6 Booked100% Booked
100% Booked
1RK36.77 Sq.mts. ( 396 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK38.29 Sq.mts. ( 412 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK21.27 Sq.mts. ( 229 Sq.ft. )10
10 Booked100% Booked
100% Booked
1RK25.73 Sq.mts. ( 277 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK28.15 Sq.mts. ( 303 Sq.ft. )30
30 Booked100% Booked
100% Booked
1RK28.64 Sq.mts. ( 308 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK30.74 Sq.mts. ( 331 Sq.ft. )15
15 Booked100% Booked
100% Booked
1RK31.22 Sq.mts. ( 336 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK32.81 Sq.mts. ( 353 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK34.15 Sq.mts. ( 368 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK69.97 Sq.mts. ( 753 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK61.83 Sq.mts. ( 666 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK62.48 Sq.mts. ( 673 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK54.88 Sq.mts. ( 591 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK55.17 Sq.mts. ( 594 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK57.46 Sq.mts. ( 618 Sq.ft. )4
4 Booked100% Booked
100% Booked
192 total apartments / 192 apartments booked. 100% apartments booked.
Work Description in Building Pushp Vinod 2 A B Wings ExistingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Pushp Vinod 2 Wing C Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod 2 Wing C ProposedJan 19003611143371
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK45.78 Sq.mts. ( 493 Sq.ft. )64
None Booked0% Booked
0% Booked
1RK26.94 Sq.mts. ( 290 Sq.ft. )120
None Booked0% Booked
0% Booked
184 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pushp Vinod 2 Wing C ProposedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Pushp Vinod 4 Existing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod 4 ExistingJan 19002211102165
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 bhk58.35 Sq.mts. ( 628 Sq.ft. )1
1 Booked100% Booked
100% Booked
1.5 bhk56.34 Sq.mts. ( 606 Sq.ft. )1
1 Booked100% Booked
100% Booked
1bhk56.79 Sq.mts. ( 611 Sq.ft. )3
3 Booked100% Booked
100% Booked
1bhk39.39 Sq.mts. ( 424 Sq.ft. )13
13 Booked100% Booked
100% Booked
1bhk39.81 Sq.mts. ( 429 Sq.ft. )6
6 Booked100% Booked
100% Booked
1bhk43.91 Sq.mts. ( 473 Sq.ft. )27
27 Booked100% Booked
100% Booked
1bhk44.74 Sq.mts. ( 482 Sq.ft. )12
12 Booked100% Booked
100% Booked
1bhk45 Sq.mts. ( 484 Sq.ft. )10
10 Booked100% Booked
100% Booked
1bhk54.16 Sq.mts. ( 583 Sq.ft. )1
1 Booked100% Booked
100% Booked
1bhk55 Sq.mts. ( 592 Sq.ft. )1
1 Booked100% Booked
100% Booked
2bhk65.12 Sq.mts. ( 701 Sq.ft. )5
5 Booked100% Booked
100% Booked
2bhk66.17 Sq.mts. ( 712 Sq.ft. )5
5 Booked100% Booked
100% Booked
2bhk69.64 Sq.mts. ( 750 Sq.ft. )5
5 Booked100% Booked
100% Booked
2bhk69.76 Sq.mts. ( 751 Sq.ft. )1
1 Booked100% Booked
100% Booked
2bhk71.88 Sq.mts. ( 774 Sq.ft. )6
6 Booked100% Booked
100% Booked
2bhk92.02 Sq.mts. ( 991 Sq.ft. )1
1 Booked100% Booked
100% Booked
3bhk86.76 Sq.mts. ( 934 Sq.ft. )1
1 Booked100% Booked
100% Booked
99 total apartments / 99 apartments booked. 100% apartments booked.
Work Description in Building Pushp Vinod 4 ExistingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Pushpa Park Parking And Public Parking Lot And Cl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushpa Park Parking And Public Parking Lot And ClJan 1900603140767
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Pushpa Park Parking And Public Parking Lot And ClCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Vas Infrastructure Ltd.
for Project
Pushpa Park
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation