Project overview

Pushp Vinod - 15 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007682. Pushp Vinod - 15 is located at F.P. No.648. This is a Ongoing being developed by Vas Infrastructure Ltd..

Pushp Vinod - 15 has 1RK, 2 BHK & I BHK Apartments with carpet areas ranging from 277 to 708 Sq.ft. Carpet. The Project has total 54 of which 10 are currently available for sale.

Pushp Vinod - 15 is being developed on a total land area of 9746 Sq.ft. Pushp Vinod - 15 has 2 Wings / Towers Pushp Vinod - 15 Phase 1,Pushp Vinod - 15 Phase 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Pushp Vinod - 15
  • Location:
  • F.P. No.648
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Vas Infrastructure Ltd.
  • Phone:
  • Address:
  • Jwala Estate
Project RERA Details
MAHA REARA No: P51800007682
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sanjay B Shah
Funding Bank
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 17 Aug 2017
Last Retrived 26 Jul 2025
Pushp Vinod - 15 QR Code
Pushp Vinod - 15
MahaRERA - P51800007682
Apartment Details & Configuration
TypeArea
1 BHK35.72 Sq.mts. ( 384 Sq.ft. )
1 BHK42.31 Sq.mts. ( 455 Sq.ft. )
1 BHK45.21 Sq.mts. ( 487 Sq.ft. )
1RK22.12 Sq.mts. ( 238 Sq.ft. )
1RK23.02 Sq.mts. ( 248 Sq.ft. )
1RK25.78 Sq.mts. ( 277 Sq.ft. )
2 BHK53.33 Sq.mts. ( 574 Sq.ft. )
2 BHK56.22 Sq.mts. ( 605 Sq.ft. )
2 BHK61.73 Sq.mts. ( 664 Sq.ft. )
2 BHK65.74 Sq.mts. ( 708 Sq.ft. )
3 BHK69.3 Sq.mts. ( 746 Sq.ft. )
2 BHK55.96 Sq.mts. ( 602 Sq.ft. )
2 BHK56.28 Sq.mts. ( 606 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pushp Vinod - 15last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Mcgm Approval
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Mcgm Approval
Landscaping & Tree Planting100% completed
95% Complete
As Per Mcgm Approval
Open Parking100% completed
95% Complete
As Per Mcgm Approval
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Mcgm Approval
Solid Waste Management And Disposal100% completed
95% Complete
As Per Mcgm Approval
Storm Water Drains100% completed
95% Complete
As Per Mcgm Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
As Per Mcgm Approval
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Mcgm Approval
Water Supply100% completed
95% Complete
As Per Mcgm Approval
Buildings / Wings in Pushp Vinod - 15
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pushp Vinod - 15 by Vas Infrastructure Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

9746 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

54 apartments in total
Total
54
Booked
44
Available
10

Saleable Area Statistics (Sq. ft.)

29964 Total
Total
29964
Booked
24585
Available
5379
Total 54 apartments in project. 44 apartments booked. 81% apartments booked.
Total 29964 Sq.ft. saleable area. 24585 saleable area booked.
82% area booked.

Pushp Vinod - 15 Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod - 15 Phase 1Jan 190091010426
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.72 Sq.mts. ( 384 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK42.31 Sq.mts. ( 455 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK45.21 Sq.mts. ( 487 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK22.12 Sq.mts. ( 238 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK23.02 Sq.mts. ( 248 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK25.78 Sq.mts. ( 277 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK53.33 Sq.mts. ( 574 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK56.22 Sq.mts. ( 605 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK61.73 Sq.mts. ( 664 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK65.74 Sq.mts. ( 708 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK69.3 Sq.mts. ( 746 Sq.ft. )1
1 Booked100% Booked
100% Booked
44 total apartments / 44 apartments booked. 100% apartments booked.
Work Description in Building Pushp Vinod - 15 Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Pushp Vinod - 15 Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pushp Vinod - 15 Phase 2Jan 19002000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK25.78 Sq.mts. ( 277 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK55.96 Sq.mts. ( 602 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK56.28 Sq.mts. ( 606 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK61.73 Sq.mts. ( 664 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK65.74 Sq.mts. ( 708 Sq.ft. )1
None Booked0% Booked
0% Booked
I BHK45.21 Sq.mts. ( 487 Sq.ft. )2
None Booked0% Booked
0% Booked
10 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pushp Vinod - 15 Phase 2Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Vas Infrastructure Ltd.
for Project
Pushp Vinod - 15
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation