Project overview

Puranik City Sector 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000017954. Puranik City Sector 2 is located at 134 -1 Part - Plot 3. This is a New being developed by Puranik Builders Limited.

Puranik City Sector 2 has 1 BHK A, 1 BHK B, 1 BHK C, 1 BHK D, 1 BHK E & 1 BHK F Apartments with carpet areas ranging from 329 to 368 Sq.ft. Carpet. The Project has total 556 of which 225 are currently available for sale.

Puranik City Sector 2 is being developed on a total land area of 167561 Sq.ft. Puranik City Sector 2 has 10 Wings / Towers Hbc 1,Hbc 2,Jb 1,Jb 2,Kb,Lb 1,Lb 2,Ma,Pb 1,Pb 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Puranik City Sector 2
  • Location:
  • 134 -1 Part - Plot 3
  • Const. Stage:
    New
  • Possession:
    01 Jul 2028
Developer Details

  • Developer:
    Puranik Builders Limited
  • Phone:
  • Address:
  • Puraniks One
Project RERA Details
MAHA REARA No: P52000017954
Project Type Others
RERA Project Status New
Architect Vastushilpa Associates
Funding Bank HDFC BANK
Proposed Possession 01 Jul 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Sep 2018
Last Retrived 28 Jul 2025
Puranik City Sector 2 QR Code
Puranik City Sector 2
MahaRERA - P52000017954
Apartment Details & Configuration
TypeArea
2 BHK A43.92 Sq.mts. ( 473 Sq.ft. )
2 BHK B43.89 Sq.mts. ( 472 Sq.ft. )
2 BHK C43.82 Sq.mts. ( 472 Sq.ft. )
2 BHK D40.59 Sq.mts. ( 437 Sq.ft. )
2 BHK E40.63 Sq.mts. ( 437 Sq.ft. )
Shop11.84 Sq.mts. ( 127 Sq.ft. )
Shop19.51 Sq.mts. ( 210 Sq.ft. )
Shop20.21 Sq.mts. ( 218 Sq.ft. )
Shop22.98 Sq.mts. ( 247 Sq.ft. )
Shop27.14 Sq.mts. ( 292 Sq.ft. )
Shop28.94 Sq.mts. ( 312 Sq.ft. )
Shop29.34 Sq.mts. ( 316 Sq.ft. )
1 BHK A34.22 Sq.mts. ( 368 Sq.ft. )
1 BHK C34.14 Sq.mts. ( 367 Sq.ft. )
2 BHK B39.65 Sq.mts. ( 427 Sq.ft. )
1 BHK A34.23 Sq.mts. ( 368 Sq.ft. )
1 BHK C34.15 Sq.mts. ( 368 Sq.ft. )
1 BHK A29.94 Sq.mts. ( 322 Sq.ft. )
1 BHK D29.92 Sq.mts. ( 322 Sq.ft. )
1 BHK E30.04 Sq.mts. ( 323 Sq.ft. )
1 BHK F30.07 Sq.mts. ( 324 Sq.ft. )
2 BHK B38.9 Sq.mts. ( 419 Sq.ft. )
2 BHK C38.93 Sq.mts. ( 419 Sq.ft. )
1 RK C19.88 Sq.mts. ( 214 Sq.ft. )
1 RK D19.87 Sq.mts. ( 214 Sq.ft. )
1 RK E19.83 Sq.mts. ( 213 Sq.ft. )
1 BHK D30.08 Sq.mts. ( 324 Sq.ft. )
1 BHK E30.06 Sq.mts. ( 324 Sq.ft. )
1 RK B19.9 Sq.mts. ( 214 Sq.ft. )
1 BHK A30.62 Sq.mts. ( 330 Sq.ft. )
1 BHK C30.61 Sq.mts. ( 329 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Puranik City Sector 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Required For Oc Of Relevant Building
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Required For Oc Of Relevant Building
Energy management
As Required For Oc Of Relevant Building
Fire Protection And Fire Safety Requirements
As Required For Oc Of Relevant Building
Landscaping & Tree Planting
As Required For Oc Of Relevant Building
Open Parking
Only For 2 Wheeler &Amp; 4 Nos 4 Wheeler For Shops
Sewerage (Chamber, Lines, Septic Tank , STP)
As Required For Oc Of Relevant Building
Solid Waste Management And Disposal
As Required For Oc Of Relevant Building
Storm Water Drains
As Required For Oc Of Relevant Building
Street Lighting
As Required For Oc Of Relevant Building
Treatment And Disposal Of Sewage And Sullage Water
As Required For Oc Of Relevant Building
Water Conservation, Rain water Harvesting
As Required For Oc Of Relevant Building
Water Supply
As Required For Oc Of Relevant Building
Buildings / Wings in Puranik City Sector 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Puranik City Sector 2 by Puranik Builders Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

167561 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

556 apartments in total
Total
556
Booked
331
Available
225

Saleable Area Statistics (Sq. ft.)

196064 Total
Total
196064
Booked
125047
Available
71017
Total 556 apartments in project. 331 apartments booked. 59% apartments booked.
Total 196064 Sq.ft. saleable area. 125047 saleable area booked.
64% area booked.

Hbc 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Hbc 1Jul 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK A43.92 Sq.mts. ( 473 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK A143.92 Sq.mts. ( 473 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK B43.89 Sq.mts. ( 472 Sq.ft. )8
4 Booked50% Booked
50% Booked
2 BHK B143.89 Sq.mts. ( 472 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK C43.82 Sq.mts. ( 472 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK D40.59 Sq.mts. ( 437 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK E40.63 Sq.mts. ( 437 Sq.ft. )3
1 Booked33% Booked
33% Booked
2 BHK E140.63 Sq.mts. ( 437 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK F43.92 Sq.mts. ( 473 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK G43.89 Sq.mts. ( 472 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK H43.82 Sq.mts. ( 472 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK I40.59 Sq.mts. ( 437 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK J40.63 Sq.mts. ( 437 Sq.ft. )3
3 Booked100% Booked
100% Booked
Shop11.84 Sq.mts. ( 127 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.51 Sq.mts. ( 210 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.21 Sq.mts. ( 218 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.98 Sq.mts. ( 247 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.14 Sq.mts. ( 292 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.94 Sq.mts. ( 312 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.34 Sq.mts. ( 316 Sq.ft. )1
None Booked0% Booked
0% Booked
51 total apartments / 34 apartments booked. 66% apartments booked.
Work Description in Building Hbc 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Hbc 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Hbc 2Jul 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK A43.92 Sq.mts. ( 473 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK A143.92 Sq.mts. ( 473 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK B43.89 Sq.mts. ( 472 Sq.ft. )8
5 Booked62% Booked
62% Booked
2 BHK B143.89 Sq.mts. ( 472 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK C43.82 Sq.mts. ( 472 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK D40.59 Sq.mts. ( 437 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK E40.63 Sq.mts. ( 437 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK E140.63 Sq.mts. ( 437 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK F43.92 Sq.mts. ( 473 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK G43.89 Sq.mts. ( 472 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK H43.82 Sq.mts. ( 472 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK I40.59 Sq.mts. ( 437 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK J40.63 Sq.mts. ( 437 Sq.ft. )3
3 Booked100% Booked
100% Booked
Shop11.84 Sq.mts. ( 127 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.51 Sq.mts. ( 210 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.21 Sq.mts. ( 218 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.98 Sq.mts. ( 247 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.14 Sq.mts. ( 292 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.94 Sq.mts. ( 312 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.34 Sq.mts. ( 316 Sq.ft. )1
None Booked0% Booked
0% Booked
51 total apartments / 38 apartments booked. 74% apartments booked.
Work Description in Building Hbc 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Jb 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Jb 1Apr 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A34.22 Sq.mts. ( 368 Sq.ft. )9
5 Booked55% Booked
55% Booked
1 BHK C34.14 Sq.mts. ( 367 Sq.ft. )10
9 Booked90% Booked
90% Booked
1 BHK D34.22 Sq.mts. ( 368 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK F34.14 Sq.mts. ( 367 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK B39.65 Sq.mts. ( 427 Sq.ft. )20
18 Booked90% Booked
90% Booked
2 BHK E39.65 Sq.mts. ( 427 Sq.ft. )12
11 Booked91% Booked
91% Booked
63 total apartments / 51 apartments booked. 80% apartments booked.
Work Description in Building Jb 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Jb 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Jb 2Apr 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A34.23 Sq.mts. ( 368 Sq.ft. )9
3 Booked33% Booked
33% Booked
1 BHK C34.15 Sq.mts. ( 368 Sq.ft. )10
9 Booked90% Booked
90% Booked
1 BHK D34.23 Sq.mts. ( 368 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK F34.15 Sq.mts. ( 368 Sq.ft. )6
2 Booked33% Booked
33% Booked
2 BHK B39.65 Sq.mts. ( 427 Sq.ft. )20
14 Booked70% Booked
70% Booked
2 BHK E39.65 Sq.mts. ( 427 Sq.ft. )12
12 Booked100% Booked
100% Booked
63 total apartments / 45 apartments booked. 71% apartments booked.
Work Description in Building Jb 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Kb

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
KbApr 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A29.94 Sq.mts. ( 322 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK D29.92 Sq.mts. ( 322 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK E30.04 Sq.mts. ( 323 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK F30.07 Sq.mts. ( 324 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK G29.94 Sq.mts. ( 322 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK J29.92 Sq.mts. ( 322 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK K30.04 Sq.mts. ( 323 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK L30.07 Sq.mts. ( 324 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK B38.9 Sq.mts. ( 419 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK C38.93 Sq.mts. ( 419 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 BHK H38.9 Sq.mts. ( 419 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK I38.93 Sq.mts. ( 419 Sq.ft. )3
2 Booked66% Booked
66% Booked
47 total apartments / 37 apartments booked. 78% apartments booked.
Work Description in Building KbCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Lb 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lb 1Jul 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A30.07 Sq.mts. ( 324 Sq.ft. )10
8 Booked80% Booked
80% Booked
1 BHK B30.04 Sq.mts. ( 323 Sq.ft. )10
6 Booked60% Booked
60% Booked
1 BHK F30.07 Sq.mts. ( 324 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK G30.04 Sq.mts. ( 323 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK H30.07 Sq.mts. ( 324 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 RK C19.88 Sq.mts. ( 214 Sq.ft. )15
11 Booked73% Booked
73% Booked
1 RK D19.87 Sq.mts. ( 214 Sq.ft. )8
7 Booked87% Booked
87% Booked
1 RK E19.83 Sq.mts. ( 213 Sq.ft. )8
2 Booked25% Booked
25% Booked
63 total apartments / 45 apartments booked. 71% apartments booked.
Work Description in Building Lb 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Lb 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lb 2Jul 20278100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A30.07 Sq.mts. ( 324 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK B30.04 Sq.mts. ( 323 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK F30.07 Sq.mts. ( 324 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK G30.04 Sq.mts. ( 323 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK H30.07 Sq.mts. ( 324 Sq.ft. )3
None Booked0% Booked
0% Booked
1 RK C19.87 Sq.mts. ( 214 Sq.ft. )15
None Booked0% Booked
0% Booked
1 RK D19.87 Sq.mts. ( 214 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK E19.83 Sq.mts. ( 213 Sq.ft. )8
None Booked0% Booked
0% Booked
63 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lb 2Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Ma

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
MaJul 20275100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK D30.08 Sq.mts. ( 324 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK E30.06 Sq.mts. ( 324 Sq.ft. )5
None Booked0% Booked
0% Booked
1 RK A19.87 Sq.mts. ( 214 Sq.ft. )4
None Booked0% Booked
0% Booked
1 RK B19.9 Sq.mts. ( 214 Sq.ft. )10
None Booked0% Booked
0% Booked
1 RK C19.83 Sq.mts. ( 213 Sq.ft. )5
None Booked0% Booked
0% Booked
29 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building MaCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pb 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pb 1Apr 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A30.62 Sq.mts. ( 330 Sq.ft. )9
7 Booked77% Booked
77% Booked
1 BHK B34.23 Sq.mts. ( 368 Sq.ft. )20
11 Booked55% Booked
55% Booked
1 BHK C30.61 Sq.mts. ( 329 Sq.ft. )10
8 Booked80% Booked
80% Booked
1 BHK D30.62 Sq.mts. ( 330 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK E34.23 Sq.mts. ( 368 Sq.ft. )12
6 Booked50% Booked
50% Booked
1 BHK F30.61 Sq.mts. ( 329 Sq.ft. )6
4 Booked66% Booked
66% Booked
63 total apartments / 42 apartments booked. 66% apartments booked.
Work Description in Building Pb 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pb 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pb 2Jul 20258100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A30.62 Sq.mts. ( 330 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK B34.23 Sq.mts. ( 368 Sq.ft. )20
6 Booked30% Booked
30% Booked
1 BHK C30.61 Sq.mts. ( 329 Sq.ft. )10
7 Booked70% Booked
70% Booked
1 BHK D30.62 Sq.mts. ( 330 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK E34.23 Sq.mts. ( 368 Sq.ft. )12
8 Booked66% Booked
66% Booked
1 BHK F30.61 Sq.mts. ( 329 Sq.ft. )6
6 Booked100% Booked
100% Booked
63 total apartments / 39 apartments booked. 61% apartments booked.
Work Description in Building Pb 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress23% done
23% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Puranik Builders Limited
for Project
Puranik City Sector 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.