Project overview

Pride Industrial Estate is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000003219. Pride Industrial Estate is located at Survey No 77 Hissa No 1 Plot No 1. This is a Ongoing being developed by Riddhi Developers.

Pride Industrial Estate has INDUSTRIAL Apartments with carpet areas ranging from 140 to 610 Sq.ft. Carpet. The Project has total 78 of which 50 are currently available for sale.

Pride Industrial Estate is being developed on a total land area of 41145 Sq.ft. Pride Industrial Estate has 1 Wings / Towers Pride Industrial Estate

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Pride Industrial Estate
  • Location:
  • Survey No 77 Hissa No 1 Plot No 1
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Riddhi Developers
  • Phone:
  • Address:
  • Ram Villa
Project RERA Details
MAHA REARA No: P99000003219
Project Type Industrial
RERA Project Status Ongoing
Architect Mr Vipul M Adhia
Funding Bank RBL Bank Limited
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 18 Oct 2023
Last Retrived 28 Jul 2025
Pride Industrial Estate QR Code
Pride Industrial Estate
MahaRERA - P99000003219
Apartment Details & Configuration
TypeArea
INDUSTRIAL13.01 Sq.mts. ( 140 Sq.ft. )
INDUSTRIAL15.8 Sq.mts. ( 170 Sq.ft. )
INDUSTRIAL22.31 Sq.mts. ( 240 Sq.ft. )
INDUSTRIAL23.23 Sq.mts. ( 250 Sq.ft. )
INDUSTRIAL23.7 Sq.mts. ( 255 Sq.ft. )
INDUSTRIAL24.16 Sq.mts. ( 260 Sq.ft. )
INDUSTRIAL26.02 Sq.mts. ( 280 Sq.ft. )
INDUSTRIAL27.42 Sq.mts. ( 295 Sq.ft. )
INDUSTRIAL47.86 Sq.mts. ( 515 Sq.ft. )
INDUSTRIAL50.65 Sq.mts. ( 545 Sq.ft. )
INDUSTRIAL53.44 Sq.mts. ( 575 Sq.ft. )
INDUSTRIAL54.37 Sq.mts. ( 585 Sq.ft. )
INDUSTRIAL56.67 Sq.mts. ( 610 Sq.ft. )
INDUSTRIAL242.1 Sq.mts. ( 2606 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pride Industrial Estatelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
-
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
-
Landscaping & Tree Planting
Na
Open Parking100% completed
95% Complete
-
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
-
Solid Waste Management And Disposal100% completed
95% Complete
-
Storm Water Drains100% completed
95% Complete
-
Street Lighting100% completed
95% Complete
-
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
-
Water Supply100% completed
95% Complete
-
Buildings / Wings in Pride Industrial Estate
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pride Industrial Estate by Riddhi Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

41145 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

78 apartments in total
Total
78
Booked
28
Available
50

Saleable Area Statistics (Sq. ft.)

30435 Total
Total
30435
Booked
10604
Available
19832
Total 78 apartments in project. 28 apartments booked. 35% apartments booked.
Total 30435 Sq.ft. saleable area. 10604 saleable area booked.
35% area booked.

Pride Industrial Estate

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pride Industrial EstateJun 202341000180
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
INDUSTRIAL13.01 Sq.mts. ( 140 Sq.ft. )2
None Booked0% Booked
0% Booked
INDUSTRIAL15.8 Sq.mts. ( 170 Sq.ft. )1
None Booked0% Booked
0% Booked
INDUSTRIAL22.31 Sq.mts. ( 240 Sq.ft. )1
None Booked0% Booked
0% Booked
INDUSTRIAL23.23 Sq.mts. ( 250 Sq.ft. )4
2 Booked50% Booked
50% Booked
INDUSTRIAL23.7 Sq.mts. ( 255 Sq.ft. )12
4 Booked33% Booked
33% Booked
INDUSTRIAL24.16 Sq.mts. ( 260 Sq.ft. )4
2 Booked50% Booked
50% Booked
INDUSTRIAL26.02 Sq.mts. ( 280 Sq.ft. )23
14 Booked60% Booked
60% Booked
INDUSTRIAL27.42 Sq.mts. ( 295 Sq.ft. )5
3 Booked60% Booked
60% Booked
INDUSTRIAL47.86 Sq.mts. ( 515 Sq.ft. )4
None Booked0% Booked
0% Booked
INDUSTRIAL50.65 Sq.mts. ( 545 Sq.ft. )4
None Booked0% Booked
0% Booked
INDUSTRIAL53.44 Sq.mts. ( 575 Sq.ft. )12
INDUSTRIAL54.37 Sq.mts. ( 585 Sq.ft. )3
None Booked0% Booked
0% Booked
INDUSTRIAL56.67 Sq.mts. ( 610 Sq.ft. )2
None Booked0% Booked
0% Booked
INDUSTRIAL242.1 Sq.mts. ( 2606 Sq.ft. )1
1 Booked100% Booked
100% Booked
78 total apartments / 28 apartments booked. 35% apartments booked.
Work Description in Building Pride Industrial EstateCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Riddhi Developers
for Project
Pride Industrial Estate
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation