Project overview

Premier Exotica I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800004431. Premier Exotica I is located at 637/Ap 637/62 P637/63 637/64 637/65 63772P. This is a Ongoing being developed by Housing Development And Infrastructure Ltd.

Premier Exotica I has RESIDENTIAL Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 519 of which 37 are currently available for sale.

Premier Exotica I is being developed on a total land area of 97678 Sq.ft. out of which 176042 Sq.ft. i.e 180% is reserved for recreational purposes. Premier Exotica I has 6 Wings / Towers Wing - A,Wing - B,Wing - C,Wing - D,Wing - E,Wing - F

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Premier Exotica I
  • Location:
  • 637/Ap 637/62 P637/63 637/64 637/65 63772P
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jan 2021
Developer Details

  • Developer:
    Housing Development And Infrastructure Ltd
  • Phone:
  • Address:
  • Hdil Towers
Project RERA Details
MAHA REARA No: P51800004431
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Indrajeet S Desmukh
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 31 Jan 2021
Revised Possession 31 Jan 2021
Extended Possession
Litigations No Litigations
Last Modified 09 Aug 2017
Last Retrived 26 Jul 2025
Premier Exotica I QR Code
Premier Exotica I
MahaRERA - P51800004431
Apartment Details & Configuration
TypeArea
RESIDENTIAL40.6 Sq.mts. ( 437 Sq.ft. )
RESIDENTIAL42 Sq.mts. ( 452 Sq.ft. )
RESIDENTIAL42.2 Sq.mts. ( 454 Sq.ft. )
RESIDENTIAL60.25 Sq.mts. ( 649 Sq.ft. )
RESIDENTIAL64 Sq.mts. ( 689 Sq.ft. )
RESIDENTIAL41.1 Sq.mts. ( 442 Sq.ft. )
RESIDENTIAL61 Sq.mts. ( 657 Sq.ft. )
RESIDENTIAL64.85 Sq.mts. ( 698 Sq.ft. )
RESIDENTIAL40 Sq.mts. ( 431 Sq.ft. )
RESIDENTIAL60.7 Sq.mts. ( 653 Sq.ft. )
RESIDENTIAL64.5 Sq.mts. ( 694 Sq.ft. )
RESIDENTIAL43.2 Sq.mts. ( 465 Sq.ft. )
RESIDENTIAL0 Sq.mts. ( 0 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Premier Exotica Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Common Recreational Space Is For Entire Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station60% completed
60% Complete
Work In Progress
Energy management
Yet To Commence
Fire Protection And Fire Safety Requirements
Yet To Commence
Landscaping & Tree Planting
Yet To Commence
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Work In Progress
Solid Waste Management And Disposal
Yet To Commence
Storm Water Drains70% completed
70% Complete
Work I N Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting
Yet To Commence
Water Supply
Yet To Commence
Buildings / Wings in Premier Exotica I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Premier Exotica I by Housing Development And Infrastructure Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

97678 Sq. ft.

Project Area

176042 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

519 apartments in total
Total
519
Booked
482
Available
37

Saleable Area Statistics (Sq. ft.)

289305 Total
Total
289305
Booked
265341
Available
23964
Total 519 apartments in project. 482 apartments booked. 92% apartments booked.
Total 289305 Sq.ft. saleable area. 265341 saleable area booked.
92% area booked.

Wing - A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - AJan 1900141400055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL40.6 Sq.mts. ( 437 Sq.ft. )24
24 Booked100% Booked
100% Booked
RESIDENTIAL42 Sq.mts. ( 452 Sq.ft. )26
26 Booked100% Booked
100% Booked
RESIDENTIAL42.2 Sq.mts. ( 454 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL60.25 Sq.mts. ( 649 Sq.ft. )26
25 Booked96% Booked
96% Booked
RESIDENTIAL64 Sq.mts. ( 689 Sq.ft. )26
25 Booked96% Booked
96% Booked
103 total apartments / 101 apartments booked. 98% apartments booked.
Work Description in Building Wing - ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress79% done
79% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing - B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - BJan 1900141400055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL40.6 Sq.mts. ( 437 Sq.ft. )49
49 Booked100% Booked
100% Booked
RESIDENTIAL41.1 Sq.mts. ( 442 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDENTIAL42.2 Sq.mts. ( 454 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDENTIAL61 Sq.mts. ( 657 Sq.ft. )26
24 Booked92% Booked
92% Booked
RESIDENTIAL64.85 Sq.mts. ( 698 Sq.ft. )26
26 Booked100% Booked
100% Booked
105 total apartments / 103 apartments booked. 98% apartments booked.
Work Description in Building Wing - BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress79% done
79% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing - C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - CJan 1900141400055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL40.6 Sq.mts. ( 437 Sq.ft. )48
48 Booked100% Booked
100% Booked
RESIDENTIAL41.1 Sq.mts. ( 442 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDENTIAL42.2 Sq.mts. ( 454 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDENTIAL61 Sq.mts. ( 657 Sq.ft. )26
22 Booked84% Booked
84% Booked
RESIDENTIAL64.85 Sq.mts. ( 698 Sq.ft. )26
25 Booked96% Booked
96% Booked
104 total apartments / 99 apartments booked. 95% apartments booked.
Work Description in Building Wing - CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing - D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - DJan 1900141400055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL40 Sq.mts. ( 431 Sq.ft. )48
48 Booked100% Booked
100% Booked
RESIDENTIAL41.1 Sq.mts. ( 442 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDENTIAL42.2 Sq.mts. ( 454 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDENTIAL60.7 Sq.mts. ( 653 Sq.ft. )26
14 Booked53% Booked
53% Booked
RESIDENTIAL64.5 Sq.mts. ( 694 Sq.ft. )26
25 Booked96% Booked
96% Booked
104 total apartments / 91 apartments booked. 87% apartments booked.
Work Description in Building Wing - DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress45% done
45% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress35% done
35% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress43% done
43% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress45% done
45% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing - E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - EJan 1900141400059
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL40 Sq.mts. ( 431 Sq.ft. )24
24 Booked100% Booked
100% Booked
RESIDENTIAL42.2 Sq.mts. ( 454 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL43.2 Sq.mts. ( 465 Sq.ft. )26
25 Booked96% Booked
96% Booked
RESIDENTIAL60.7 Sq.mts. ( 653 Sq.ft. )26
14 Booked53% Booked
53% Booked
RESIDENTIAL64.5 Sq.mts. ( 694 Sq.ft. )26
25 Booked96% Booked
96% Booked
103 total apartments / 88 apartments booked. 85% apartments booked.
Work Description in Building Wing - ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing - F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - FJan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Wing - FCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Housing Development And Infrastructure Ltd
for Project
Premier Exotica I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.