Project overview

Prem Belaire is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003675. Prem Belaire is located at 75/14/14. This is a Ongoing being developed by M/S Aryan Infra.

Prem Belaire has 1 BHK, 2 BHK, 2and 1\2 BHK & 3 BHK Apartments with carpet areas ranging from 466 to 901 Sq.ft. Carpet. The Project has total 89 of which 3 are currently available for sale.

Prem Belaire is being developed on a total land area of 22207 Sq.ft. Prem Belaire has 1 Wings / Towers Prem Belaire C And D Wing Phase-Ii

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Prem Belaire
  • Location:
  • 75/14/14
  • Const. Stage:
    Ongoing
  • Possession:
    02 Feb 2019
Developer Details

  • Developer:
    M/S Aryan Infra
  • Phone:
  • Address:
  • Skyline Wealth Space
Project RERA Details
MAHA REARA No: P51800003675
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ashish Bhatt & Assocites
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 02 Feb 2019
Revised Possession 02 Feb 2019
Extended Possession 31 Mar 2024
Litigations No Litigations
Last Modified 23 Jun 2025
Last Retrived 26 Jul 2025
Prem Belaire QR Code
Prem Belaire
MahaRERA - P51800003675
Apartment Details & Configuration
TypeArea
1 BHK43.29 Sq.mts. ( 466 Sq.ft. )
1 BHK44.03 Sq.mts. ( 474 Sq.ft. )
2 BHK57.5 Sq.mts. ( 619 Sq.ft. )
2 BHK58.71 Sq.mts. ( 632 Sq.ft. )
2and 1\2 BHK75.43 Sq.mts. ( 812 Sq.ft. )
3 BHK83.7 Sq.mts. ( 901 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Prem Belairelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
No Receiving Station
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
-
Landscaping & Tree Planting100% completed
95% Complete
Only Tree Planting
Open Parking100% completed
95% Complete
-
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
No Septic Tank &Amp; Stp
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Only Rain Water Harvesting
Water Supply100% completed
95% Complete
From Mcgm
Buildings / Wings in Prem Belaire
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Prem Belaire by M/S Aryan Infralast updated on 26 Jul 2025 as per information obtained from MARA RERA.

22207 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

89 apartments in total
Total
89
Booked
86
Available
3

Saleable Area Statistics (Sq. ft.)

57743 Total
Total
57743
Booked
55749
Available
1994
Total 89 apartments in project. 86 apartments booked. 96% apartments booked.
Total 57743 Sq.ft. saleable area. 55749 saleable area booked.
97% area booked.

Prem Belaire C And D Wing Phase-Ii

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Prem Belaire C And D Wing Phase-IiMar 201815101010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.29 Sq.mts. ( 466 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 BHK44.03 Sq.mts. ( 474 Sq.ft. )15
14 Booked93% Booked
93% Booked
2 BHK57.5 Sq.mts. ( 619 Sq.ft. )15
14 Booked93% Booked
93% Booked
2 BHK58.71 Sq.mts. ( 632 Sq.ft. )15
15 Booked100% Booked
100% Booked
2and 1\2 BHK75.43 Sq.mts. ( 812 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK83.7 Sq.mts. ( 901 Sq.ft. )15
14 Booked93% Booked
93% Booked
89 total apartments / 86 apartments booked. 96% apartments booked.
Work Description in Building Prem Belaire C And D Wing Phase-IiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress99% done
99% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S Aryan Infra
for Project
Prem Belaire
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation