Project overview

Prayag Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009260. Prayag Heights is located at 107 Part, 106. This is a Ongoing being developed by Jenvee Infrastructure Pvt Ltd.

Prayag Heights has 1 BHK Apartments with carpet areas ranging from 422 to 422 Sq.ft. Carpet. The Project has total 134 of which 0 are currently available for sale.

Prayag Heights is being developed on a total land area of 11356 Sq.ft. Prayag Heights has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Bhawani ConstructionBhawani ConstructionsOld Survey No.78 New Survey No.10-2,3A,3B30-12-2023 00:00:00
Vinayak TowerKosmos Developer144, 144/1 To 1131-12-2019 00:00:00
Prayag HeightsJenvee Infrastructure Pvt Ltd107 Part, 10630-12-2023 00:00:00
Mauli OmkarMauli Sai Developers Pvt Ltd701B/1/A To 701B/8/A, 701B/1A/1/1 And 701B/1A/1/1/9 To 3008-07-2023 00:00:00
Maple HeightsBholasai Developers291 A Pt31-12-2018 00:00:00
Sheth Blue IvySheth Developers Private LimitedCts 104-A Of Village Dindoshi At Malad East Mumbai 40009730-06-2023 00:00:00
Shah Arcade IiiShah Housecon Private Limited502 502 Pt And 502/301 To 388 510 And 510/1 To 5 512 513 513 /1 To 34 515 516 And 516/1 To 14 51730-07-2018 00:00:00
Sheetal DwarSheetal Enterprises53731-12-2019 00:00:00
Sanjar Developers And BuildersSanjar Developers & BuildersCts 278A/1B31-12-2019 00:00:00
Borivli Vasundhara Chs Ltd.Shree Sai Shraddha Developers290/4-B04-01-2020 00:00:00
Jyoti SukritiJyoti BuildersCts No 619, 620-A/1-A-3, 620 A1-B30-06-2021 00:00:00
Sunrise Orlem 2B Phase 3Dhaval Housing Aop438B, Cts No 438A30-06-2021 00:00:00
Malad Babel Chs LtdSiscorn DevelopersCts No 45931-12-2017 00:00:00
Leela SterlingVora Estate Developers400063, Mumbai Suburban31-12-2020 00:00:00
Noble HeightsNoble Infra Projects709 726 727 727 1 To 6 728 728 1 To 230-12-2019 00:00:00
Jp DecksJp Infra (Mumbai) Pvt. Ltd.Survey No 267 Hissa No 1-1 Pt Cts Nos 610A-1A-1B And 610-1A-1A Pt Of Vil Malad-E Tal-Borivili Mumbai31-12-2019 00:00:00
Mauli DesireMauli Sai Developers Pvt Ltd78/1 To 331-01-2019 00:00:00
Shree Sambhav Darshan ChsShree Sai Shraddha AssociatesMumbai Suburban20-06-2021 00:00:00
Western WoodsKarmvir Mumbai Housing Private Limited1B/9A31-12-2018 00:00:00
Shiv Shakti ChslGlasswood Realty Private Limited22-A 22 A/1 To 22 A/531-12-2019 00:00:00
Sharda SahaniwasSumit Chetna Ventures88 Part31-03-2018 00:00:00
Royal Crystal Wing BRoyal RealtorsMalad East31-12-2018 00:00:00
Keshav Shiv HeightsInventure Sejal Realtors Pvt. Ltd.422B, 422B 1 To 1531-03-2018 00:00:00
Shiv ShubharambhNavkarmik Infra & Development Private Limited77001-03-2024 00:00:00
Sheth Cnergy MaladSheth Developers Private LimitedPart Of Cts No 104/B Of Village Dindoshi30-06-2023 00:00:00
Elysian Tower AOberoi Realty Limited95/4/B/4 Pt Of Village Dindoshi30-06-2027 00:00:00
Sumit Garden GroveSumit Garden Grove Construction Llp374B/12 Part30-12-2021 00:00:00
Alta Monte And SignetEra Realtors Private Limited811 A/7Pt 812 813 814 A/1 To A/4 821Pt 824Pt 825Pt 844Pt30-12-2024 00:00:00
Green AcresNirman Realtors And Developers LtdCts No 738/B/1/A30-12-2025 00:00:00
Kanakia LevelsKanakia Spaces Realty Private LimitedSurvey No 288 Pt 503 Pt Corresponding Cts Nos Specified In Title Certificate Attach To This Form31-10-2019 00:00:00
Asmi Business CentreAsmi CorporationSurvey No.3 Part Hissa No.6 Old Cts No.51 Part And New Cts No 51A/B31-12-2025 00:00:00
Nahid HeightsM/S Nahid Enterprises595B30-12-2022 00:00:00
Kurar Sangeeta Aprtment Chs LtdL K Infracon Llp45530-03-2024 00:00:00
Pearl OasisBahist Enterprises Pvt Ltd136 Pt30-12-2024 00:00:00
111 Hyde ParkMdm Realty111/96/C/130-06-2022 00:00:00
Hiramani EnclaveDamji Hirji & Company28/1 To 8, Cts No. 28A01-06-2019 00:00:00
Gaurav DiscoveryVidhi Relators400097, Mumbai Suburban31-12-2021 00:00:00
Redevelopment Of Lamplight ChslShree Mahavir EstatesSurvey No.287, Cts.21 Pt, Plot 5/631-12-2019 00:00:00
Sheetal HeightsToughcons Realtors Private LimitedCts 569 570 570 1 To 931-12-2019 00:00:00
Shah Business CentreShah Housecon Private Limited472B Pt 472B / 1 To 78 472B / 82 To 90 472 B /93 To 12231-12-2019 00:00:00
Happy Home EnclaveJd & Fc Ventures Llp348 (Part)31-12-2026 00:00:00
Elysian Tower C, D, EOberoi Realty Limited95/4/B/3 & 95/4/B/4 Of Village Dindoshi & C.T.S. No.590/A/A/1 Of Village Pahadi Goregaon, C.T.S. Nos. 95/4/B/3 & 95/4/B/4 Of Village Dindoshi & C.T.S. No.590/A/A/1 Of Village Pahadi Goregaon$#$C.T.S. Nos. 95/4/B/1(Pt.), 95/4/B/2(Pt.)31-10-2031 00:00:00
Vaishno Neelkanth ApartmentShree Vaishno Homes Pvt. Ltd.542/C31-12-2024 00:00:00
Dindoshi Sai Sadan Chs LtdSanjay Bajranglal Agarwal106 10730-06-2021 00:00:00
Neminath Apartment Sra Chs And Shree Siddhagiri Sra ChsSubhash Velji Chawda276, 276/1 To 2031-12-2019 00:00:00
Avighna ResidencyKonark Shakti Group Of Companies21A/7A31-12-2018 00:00:00
Kabra Tiara - Redevelopment Of Dindoshi Darshan ChslKabra And Associates110 (Pt), 146 (Pt)31-12-2027 00:00:00
Sayba Signature SpacesStar SapphireCts No 530-06-2027 00:00:00
Ghanwat AccordGhanwat Developers Pvt. Ltd790(A)31-12-2027 00:00:00
Sugra ParkBlossom DevelopersSurvey No 27301-01-2021 00:00:00
Redevelopment Of Sita Sadan - Rishab VillaM/S S.S. DevelopersMumbai Suburban, 40009731-07-2020 00:00:00
Sheetal BhavanD.G.Realty423 423 1 To 1401-06-2023 00:00:00
Redevelopment Of Malad Jay Amrat Co-Operative Housing Society-Rishab Jay AmratRishabraj Toughcons City Homes Private LimitedPlot Bearing No 7 And 8 Cts No 227/3 And 227/430-06-2021 00:00:00
Madhav RealityJayesh Hiralal Gothi823/A 823/1 And 818 Survey Number 28415-06-2022 00:00:00
Sanjay BuildingShreeji Realties Private Limited400097, Mumbai Suburban31-12-2020 00:00:00
EsquireOberoi Realty Limited590/A/A/1 Pt Of Village Pahadi Goregaon30-06-2018 00:00:00
Garnet PaladiumGarnet Construction Limited1B/10A31-12-2018 00:00:00
Express Zone B WingCello Sonal Construction581/C/1, Cts No. 1B/1/B/130-06-2024 00:00:00
Shankeshwar ApartmentNavkar Developers568, 568/1 To 1230-09-2020 00:00:00
Upper East 97Prima Terra Buildtech Pvt. Ltd.97A/2430-12-2022 00:00:00
Project Details
  • Project:
    Prayag Heights
  • Location:
  • 107 Part, 106
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Jenvee Infrastructure Pvt Ltd
  • Phone:
  • Address:
  • Western Edge 2
Project RERA Details
MAHA REARA No: P51800009260
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Three Dimensional Consultant Llp
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 22 Aug 2017
Last Retrived 26 Jul 2025
Prayag Heights QR Code
Prayag Heights
MahaRERA - P51800009260
Apartment Details & Configuration
TypeArea
1 BHK38.92 Sq.mts. ( 419 Sq.ft. )
2 BHK45.61 Sq.mts. ( 491 Sq.ft. )
2 BHK48.49 Sq.mts. ( 522 Sq.ft. )
2 BHK58.24 Sq.mts. ( 627 Sq.ft. )
1 BHK39.19 Sq.mts. ( 422 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Prayag Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting100% completed
95% Complete
Done
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply100% completed
95% Complete
Done
Buildings / Wings in Prayag Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Prayag Heights by Jenvee Infrastructure Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

11356 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

134 apartments in total
Total
134
Booked
134
Available
0

Saleable Area Statistics (Sq. ft.)

64899 Total
Total
64899
Booked
64899
Available
0
Total 134 apartments in project. 134 apartments booked. 100% apartments booked.
Total 64899 Sq.ft. saleable area. 64899 saleable area booked.
100% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 202224100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.92 Sq.mts. ( 419 Sq.ft. )23
23 Booked100% Booked
100% Booked
2 BHK45.61 Sq.mts. ( 491 Sq.ft. )22
22 Booked100% Booked
100% Booked
2 BHK48.49 Sq.mts. ( 522 Sq.ft. )22
22 Booked100% Booked
100% Booked
2 BHK58.24 Sq.mts. ( 627 Sq.ft. )23
23 Booked100% Booked
100% Booked
90 total apartments / 90 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 202224101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.19 Sq.mts. ( 422 Sq.ft. )44
44 Booked100% Booked
100% Booked
44 total apartments / 44 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Jenvee Infrastructure Pvt Ltd
for Project
Prayag Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation