Project overview

Poonam Imperia Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000017908. Poonam Imperia Phase I is located at S. No. 27, H. No. 3A. This is a New being developed by Poonam Skyline Construction.

Poonam Imperia Phase I has 1 BHK & 2 BHK Apartments with carpet areas ranging from 246 to 455 Sq.ft. Carpet. The Project has total 329 of which 136 are currently available for sale.

Poonam Imperia Phase I is being developed on a total land area of 56766 Sq.ft. out of which 13304 Sq.ft. i.e 23% is reserved for recreational purposes. Poonam Imperia Phase I has 4 Wings / Towers A Wing,B Wing,C Wing,H Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Poonam Imperia Phase I
  • Location:
  • S. No. 27, H. No. 3A
  • Const. Stage:
    New
  • Possession:
    30 Nov 2022
Developer Details

  • Developer:
    Poonam Skyline Construction
  • Phone:
  • Address:
  • Podar Chamber
Project RERA Details
MAHA REARA No: P99000017908
Project Type Residential / Group Housing
RERA Project Status New
Architect Encon Architectural & Structural Works Project Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Nov 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Feb 2024
Last Retrived 28 Jul 2025
Poonam Imperia Phase I QR Code
Poonam Imperia Phase I
MahaRERA - P99000017908
Apartment Details & Configuration
TypeArea
1 BHK32.81 Sq.mts. ( 353 Sq.ft. )
1 BHK33.23 Sq.mts. ( 358 Sq.ft. )
2 BHK41 Sq.mts. ( 441 Sq.ft. )
2 BHK41.14 Sq.mts. ( 443 Sq.ft. )
1 BHK33.31 Sq.mts. ( 359 Sq.ft. )
2 BHK40.73 Sq.mts. ( 438 Sq.ft. )
2 BHK40.87 Sq.mts. ( 440 Sq.ft. )
1 BHK32.9 Sq.mts. ( 354 Sq.ft. )
2 BHK40.11 Sq.mts. ( 432 Sq.ft. )
1 BHK22.81 Sq.mts. ( 246 Sq.ft. )
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )
1 BHK31.28 Sq.mts. ( 337 Sq.ft. )
1 BHK31.96 Sq.mts. ( 344 Sq.ft. )
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )
1 BHK34.62 Sq.mts. ( 373 Sq.ft. )
2 BHK42.28 Sq.mts. ( 455 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Poonam Imperia Phase Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Work In Progress
Energy management
Will Be Provided
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Work In Progress
Landscaping & Tree Planting80% completed
80% Complete
Stage Not Reached
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Work In Progress
Solid Waste Management And Disposal
Stage Not Reached
Storm Water Drains
Will Be Provided
Street Lighting
Will Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Will Be Provided
Water Conservation, Rain water Harvesting
Will Be Provided
Water Supply90% completed
90% Complete
Work In Progress
Buildings / Wings in Poonam Imperia Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Poonam Imperia Phase I by Poonam Skyline Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

56766 Sq. ft.

Project Area

13304 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

329 apartments in total
Total
329
Booked
193
Available
136

Saleable Area Statistics (Sq. ft.)

129484 Total
Total
129484
Booked
76927
Available
52557
Total 329 apartments in project. 193 apartments booked. 58% apartments booked.
Total 129484 Sq.ft. saleable area. 76927 saleable area booked.
59% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMay 2022141010044
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.81 Sq.mts. ( 353 Sq.ft. )26
1 BHK33.23 Sq.mts. ( 358 Sq.ft. )28
6 Booked21% Booked
21% Booked
2 BHK41 Sq.mts. ( 441 Sq.ft. )28
2 BHK41.14 Sq.mts. ( 443 Sq.ft. )28
6 Booked21% Booked
21% Booked
110 total apartments / 18 apartments booked. 16% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress72% done
72% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMay 2022141010053
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.81 Sq.mts. ( 353 Sq.ft. )26
15 Booked57% Booked
57% Booked
1 BHK33.23 Sq.mts. ( 358 Sq.ft. )14
10 Booked71% Booked
71% Booked
1 BHK33.31 Sq.mts. ( 359 Sq.ft. )14
13 Booked92% Booked
92% Booked
2 BHK40.73 Sq.mts. ( 438 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK40.87 Sq.mts. ( 440 Sq.ft. )28
26 Booked92% Booked
92% Booked
96 total apartments / 78 apartments booked. 81% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress89% done
89% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMay 2022141010045
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.9 Sq.mts. ( 354 Sq.ft. )13
8 Booked61% Booked
61% Booked
1 BHK33.31 Sq.mts. ( 359 Sq.ft. )13
7 Booked53% Booked
53% Booked
2 BHK40.11 Sq.mts. ( 432 Sq.ft. )56
55 Booked98% Booked
98% Booked
82 total apartments / 70 apartments booked. 85% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress89% done
89% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H WingMay 202271010231
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.81 Sq.mts. ( 246 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 BHK31.28 Sq.mts. ( 337 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK31.96 Sq.mts. ( 344 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK34.62 Sq.mts. ( 373 Sq.ft. )7
2 Booked28% Booked
28% Booked
2 BHK42.28 Sq.mts. ( 455 Sq.ft. )1
1 Booked100% Booked
100% Booked
41 total apartments / 27 apartments booked. 65% apartments booked.
Work Description in Building H WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress89% done
89% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Poonam Skyline Construction
for Project
Poonam Imperia Phase I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation