Project overview

Poonam Hills is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700018630. Poonam Hills is located at Tauzwkca0gnrydvbv1lvzdx1dre8srks6pi0r+9B4rq=. This is a New being developed by M/S. Ashapura Developer.

Poonam Hills has TYPE 1, TYPE 2, TYPE 3, TYPE 4, TYPE 5 & TYPE 6 Apartments with carpet areas ranging from 319 to 322 Sq.ft. Carpet. The Project has total 170 of which 128 are currently available for sale.

Poonam Hills is being developed on a total land area of 59902 Sq.ft. out of which 5985 Sq.ft. i.e 10% is reserved for recreational purposes. Poonam Hills has 6 Wings / Towers 1A,1B,2A,2B,3A,3B

ProjectDeveloperLocationPossession
Poonam HillsM/S. Ashapura DeveloperTauzwkca0gnrydvbv1lvzdx1dre8srks6pi0r+9B4rq=30-12-2020 00:00:00
Project Details
  • Project:
    Poonam Hills
  • Location:
  • Tauzwkca0gnrydvbv1lvzdx1dre8srks6pi0r+9B4rq=
  • Const. Stage:
    New
  • Possession:
    30 Dec 2020
Developer Details

  • Developer:
    M/S. Ashapura Developer
  • Phone:
  • Address:
  • Swarajya Building
Project RERA Details
MAHA REARA No: P51700018630
Project Type Residential / Group Housing
RERA Project Status New
Architect Rajesh Shah
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2020
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 Jul 2025
Last Retrived 13 Feb 2026
Poonam Hills QR Code
Poonam Hills
MahaRERA - P51700018630
Apartment Details & Configuration
TypeArea
Type 129.98 Sq.mts. ( 323 Sq.ft. )
TYPE 229.86 Sq.mts. ( 321 Sq.ft. )
TYPE 329.88 Sq.mts. ( 322 Sq.ft. )
TYPE 423.19 Sq.mts. ( 250 Sq.ft. )
TYPE 529.7 Sq.mts. ( 320 Sq.ft. )
TYPE 629.58 Sq.mts. ( 318 Sq.ft. )
TYPE 129.81 Sq.mts. ( 321 Sq.ft. )
TYPE 229.77 Sq.mts. ( 320 Sq.ft. )
TYPE 329.79 Sq.mts. ( 321 Sq.ft. )
TYPE 229.68 Sq.mts. ( 319 Sq.ft. )
TYPE 329.75 Sq.mts. ( 320 Sq.ft. )
TYPE 429.83 Sq.mts. ( 321 Sq.ft. )
TYPE 529.45 Sq.mts. ( 317 Sq.ft. )
TYPE 629.36 Sq.mts. ( 316 Sq.ft. )
TYPE 129.87 Sq.mts. ( 322 Sq.ft. )
TYPE 529.66 Sq.mts. ( 319 Sq.ft. )
TYPE 229.95 Sq.mts. ( 322 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Poonam Hillslast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Recreation Area
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
As Per Plan
Open Parking
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Chamber Lines And Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Storm Water Drain
Street Lighting80% completed
80% Complete
As Per Requirement
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply95% completed
95% Complete
Municipal
Buildings / Wings in Poonam Hills
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Poonam Hills by M/S. Ashapura Developerlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

59902 Sq. ft.

Project Area

5985 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

170 apartments in total
Total
170
Booked
42
Available
128

Saleable Area Statistics (Sq. ft.)

54080 Total
Total
54080
Booked
13446
Available
40635
Total 170 apartments in project. 42 apartments booked. 24% apartments booked.
Total 54080 Sq.ft. saleable area. 13446 saleable area booked.
25% area booked.

1A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1AJun 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Type 129.98 Sq.mts. ( 323 Sq.ft. )4
4 Booked100% Booked
100% Booked
TYPE 229.86 Sq.mts. ( 321 Sq.ft. )5
4 Booked80% Booked
80% Booked
TYPE 329.88 Sq.mts. ( 322 Sq.ft. )5
2 Booked40% Booked
40% Booked
TYPE 423.19 Sq.mts. ( 250 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 529.7 Sq.mts. ( 320 Sq.ft. )5
5 Booked100% Booked
100% Booked
TYPE 629.58 Sq.mts. ( 318 Sq.ft. )5
2 Booked40% Booked
40% Booked
29 total apartments / 17 apartments booked. 58% apartments booked.
Work Description in Building 1ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress99% done
99% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

1B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1BJun 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.7 Sq.mts. ( 320 Sq.ft. )4
4 Booked100% Booked
100% Booked
TYPE 129.81 Sq.mts. ( 321 Sq.ft. )5
2 Booked40% Booked
40% Booked
TYPE 229.77 Sq.mts. ( 320 Sq.ft. )5
4 Booked80% Booked
80% Booked
TYPE 329.79 Sq.mts. ( 321 Sq.ft. )5
2 Booked40% Booked
40% Booked
TYPE 429.86 Sq.mts. ( 321 Sq.ft. )5
2 Booked40% Booked
40% Booked
TYPE 629.58 Sq.mts. ( 318 Sq.ft. )4
3 Booked75% Booked
75% Booked
28 total apartments / 17 apartments booked. 60% apartments booked.
Work Description in Building 1BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress99% done
99% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

2A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
2AJun 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 129.77 Sq.mts. ( 320 Sq.ft. )4
2 Booked50% Booked
50% Booked
TYPE 229.68 Sq.mts. ( 319 Sq.ft. )4
None Booked0% Booked
0% Booked
TYPE 329.75 Sq.mts. ( 320 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 429.83 Sq.mts. ( 321 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 529.45 Sq.mts. ( 317 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 629.36 Sq.mts. ( 316 Sq.ft. )5
None Booked0% Booked
0% Booked
28 total apartments / 2 apartments booked. 7% apartments booked.
Work Description in Building 2ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked

2B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
2BJun 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.68 Sq.mts. ( 319 Sq.ft. )5
1 Booked20% Booked
20% Booked
TYPE 129.77 Sq.mts. ( 320 Sq.ft. )5
1 Booked20% Booked
20% Booked
TYPE 329.75 Sq.mts. ( 320 Sq.ft. )5
1 Booked20% Booked
20% Booked
TYPE 429.83 Sq.mts. ( 321 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 529.45 Sq.mts. ( 317 Sq.ft. )4
None Booked0% Booked
0% Booked
TYPE 629.36 Sq.mts. ( 316 Sq.ft. )4
3 Booked75% Booked
75% Booked
28 total apartments / 6 apartments booked. 21% apartments booked.
Work Description in Building 2BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked

3A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
3AJun 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 129.87 Sq.mts. ( 322 Sq.ft. )4
None Booked0% Booked
0% Booked
TYPE 229.87 Sq.mts. ( 322 Sq.ft. )4
None Booked0% Booked
0% Booked
TYPE 329.87 Sq.mts. ( 322 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 429.87 Sq.mts. ( 322 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 529.66 Sq.mts. ( 319 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 629.66 Sq.mts. ( 319 Sq.ft. )5
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 3ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

3B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
3BJun 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 129.87 Sq.mts. ( 322 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 229.95 Sq.mts. ( 322 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 329.95 Sq.mts. ( 322 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 429.95 Sq.mts. ( 322 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 529.66 Sq.mts. ( 319 Sq.ft. )5
None Booked0% Booked
0% Booked
TYPE 629.66 Sq.mts. ( 319 Sq.ft. )4
None Booked0% Booked
0% Booked
29 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 3BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
M/S. Ashapura Developer
for Project
Poonam Hills
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation