Project overview

Poddar Wondercity Phase - Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020028. Poddar Wondercity Phase - Ii is located at 421503. This is a New Project being developed by Poddar Housing And Development Limited.

Poddar Wondercity Phase - Ii has ONE BHK S Apartments with carpet areas ranging from 304 to 304 Sq.ft. Carpet. The Project has total 540 of which 433 are currently available for sale.

Poddar Wondercity Phase - Ii is being developed on a total land area of 16082 Sq.ft. out of which 8913 Sq.ft. i.e 55% is reserved for recreational purposes. Poddar Wondercity Phase - Ii has 3 Wings / Towers B4,B5,B6

ProjectDeveloperLocationPossession
The EmpressUnique Shanti Developers LlpOld S.No.479/230-03-2023 00:00:00
Lotus ParkReal Enterprise842-A, Plot No. 02,0330-12-2022 00:00:00
Paramount BKalpataru Homes Private LimitedS.No. 114/8-Part,114/4-Part30-06-2025 00:00:00
Rental Building A-1 R2Sonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Raviraj ApartmentRajendra GhorpadeS.No 85,H. No 11, Plot No 930-12-2022 00:00:00
Krupa SindhuAshish Waman GoleS No 48 H No 8/428-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesTika No 16 Cts No 7830-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyS No 29/A H No 19 Plot No 8730-09-2019 00:00:00
Mauli MadhusudhanRameshwar Patil42160530-03-2023 00:00:00
Salangpur NirmanSalangpur Nirman252 6,7 Part30-12-2022 00:00:00
NandigramYogesh Kishor MahajanTikka No 5, 62A/131-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNew S. No./Old S. No./ H.No. 221/564/1,3,4A,4B,8. New S. No/Old S. No/ H.No/220/565/1,4,6,7,8,9,10. New S. No/Old S. No/H.No/267/567/1,2/1. New S. No/Old S. No/245/579/1A,1B,2,3A,3B,3C,4,5,6,731-12-2027 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdSurvey No 77 1A 2 4 501-12-2021 00:00:00
Silver ArcadeSiddhivinayak Enterprises5831-12-2018 00:00:00
Orion Business ParkNeminath EnterprisesGut No 33 Pt31-03-2019 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai31-12-2025 00:00:00
Suyog ApartmentTelange Builders & Developers Private Limited4693 To 469930-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction7015A/1A30-06-2023 00:00:00
Payal PrideMit Enterprises10430-03-2022 00:00:00
Panvelkar Estate - GreenfordPanvelkar Infrastructures Private LimitedSurvey No. 42 Hissa No 2 And 330-12-2022 00:00:00
Plot 1 Sector 10 GhansoliCidco Of Maharashtra Ltd.Plot No 130-06-2021 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private Limited1411, 2, 3, 144, 1451, 2, 4, 1462, 3, 4, 1481, 1421, 1483130-12-2023 00:00:00
Highland Springs B4- A WingSiddhi Real Estate Developers74/5Apart30-06-2023 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.50602-10-2026 00:00:00
Teri KudratVishnu Jethanand BadlaniPlot No 433, Sheet No 48, Cts No 2578331-10-2024 00:00:00
Kanha ResidencyKulkarnii Builder105A/4/2/3/4/5/4114-05-2025 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private Limited67/2/P, 67/3A, Sub Plot B30-12-2023 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedGut No 42/131-12-2018 00:00:00
Jai MatadeeAaradhana Developers37531-03-2018 00:00:00
Ten X Era Raymond Realty Tower CRaymond Limited121 Pt 83/3 83/130-01-2029 00:00:00
Guru Ganesh ChsVadnere Builder & DevelopersSurvey No 13 Hissa No 6(A) Plot No 2631-12-2025 00:00:00
Mangeshi NeptuneMangesh GaikarThane31-12-2027 00:00:00
Cosmos Horizon Phase IiConcorde Developers192/2A30-03-2024 00:00:00
Simone ResidencyM R M DevelopersDaighar Village30-12-2022 00:00:00
Delta WoodsDelta Venture1883Pt30-09-2023 00:00:00
Shreeji LandmarkVinayak DevelopersSurvey No 46 Hissa No 5-130-12-2029 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt Ltd47/1/2, 47/1/3, 47/1/4, 47/1/5, 47/1/7, 47/1/9, 47/1/1030-12-2021 00:00:00
One Indiabulls Thane - 1Tapir Constructions Limited71/1/A/1/1, 71/229-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/430-12-2021 00:00:00
Sarthi ElanzaSarthi DevelopersS No-264/58 Plot No-5531-10-2023 00:00:00
Bsc It ParkBansal Steel CorporationA21601-06-2024 00:00:00
Runwal Lands EndRunwal Construction Private Limited20/3 Part30-06-2029 00:00:00
Shivsai ParadiseBharat Agri Fert & Realty Realty Ltd112/2A,3,4,5/1,5/2,5/330-12-2028 00:00:00
RubaShreyas Enterprises112/5/430-09-2020 00:00:00
OrchidMehta RealtorsS No 378/131-03-2019 00:00:00
Golden Hills B- 3Vihang Enterprises921,923,9241,9243,928130-12-2024 00:00:00
Classic ResidencyClassic ConstructionThane30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersSurvey No. 28 H.No 530-03-2026 00:00:00
Trinity MokshRattanraj LifespacesS No 64 1 And 64 231-03-2025 00:00:00
Ganesh BhuvanMagnum Homes66830-09-2024 00:00:00
Audumber Flower ValleyAudumber SuperstructuresS No 5/4/D 5/4/B 5/23/B30-06-2025 00:00:00
Spm Dream City Phase 1D K BuildconS No 52 H No 4/531-12-2028 00:00:00
Paramount CKalpataru Homes Private LimitedSno 115/5Pt 115/9Pt 115/12Pt,115/13Pt Of Village Majiwade 212/1Pt Of Village Balkum30-06-2025 00:00:00
My City Phase Ii Cluster 5 Part IiHorizon Projects Pvt Ltd108/1 And 93 Part31-12-2027 00:00:00
Kashi Darshan B WingVarad Raj Construction98/1920-12-2023 00:00:00
Saroj Sadan Chs LtdShrusti DevelopersThane19-01-2026 00:00:00
Narang Privado - BNarang Realty Private Limited146/5/B And 146/6/B/131-03-2028 00:00:00
Bhagwan Krishna NiwasQuick Developers27/1201-07-2024 00:00:00
ZenithRunwal Developers Private LimitedSurvey No 51 Hissa No 1 To 15 Survey No 52 Hissa No 1 To 3 Survey No 5330-09-2028 00:00:00
Urban Nest Bldg - 1Cllaro Enterprises Llp127-1A31-12-2024 00:00:00
The Icon Phase 1Leading Frontier Private LimitedSurvey No 60/18,60/19,Survey No 61/2A To 61/2F, 61/3,62/3,62/5E,62/6,62/7,62/9C30-12-2022 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyThane31-12-2022 00:00:00
Green SquareSquarefeet Enterprises166/3131-12-2027 00:00:00
Larkins NestPride Property Developers68/13/3F And 68/13/3G31-12-2025 00:00:00
Shanti LegacyAnmol InfraOld S. No. 368, New S. No. 7031-03-2025 00:00:00
Highland Park Building 2- K25 Wing A Phase 2Siddhi Gaurav EnterprisesS. N. 87/2 And 82/630-12-2024 00:00:00
Falco CheshireAanya RealtorsThane, 42110231-10-2016 00:00:00
Highland Springs B4- C WingSiddhi Real Estate Developers74/5A 59/1A 59/1B 46/1830-12-2023 00:00:00
Seven Eleven CourtyardS.S.S AssoicatesThane30-11-2025 00:00:00
Shivanjali HeightsShivanjali ConstructionSurvey No 73, 74, 75, 7630-06-2022 00:00:00
Vardhman VatikaDiwali DevelopersSurvey No 21 Part And 22 Part31-12-2019 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedGut No.45/2,46/2,47,49/4,49/9,49/11,49/1230-12-2023 00:00:00
Delta VrindavanDelta VentureCts 1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 2103 2157 2221 2222 2294 2158 2295 174130-09-2020 00:00:00
Elegant OlympiaElegant Homes2314-05-2018 00:00:00
Ashar Metro TowersShree Saibaba Grihanirimiti Private LimitedS.No 229 Pt H.No 1,S.No 207 Pt And 208 Pt H No 7 Pt30-12-2024 00:00:00
Highland Park Building 6 And 7- K23 Phase 1Siddhi Gaurav EnterprisesS. N. 85 And 87/231-12-2019 00:00:00
Shree Moreshwar Chs LtdAjay Sanjay MohorikarS No 33 H No. 6/15 Cts No 897331-12-2024 00:00:00
Swami Narendra ResidencyRaj Ratneshwari Developers274/1-B31-12-2026 00:00:00
Shapoorji Pallonji Skyraa At Northern LightsJaykali Developers Private Limited509 And 510/A31-12-2027 00:00:00
Krishna - B WingNeelkanth Palm Realty149/4/1 Pt, 412/2 Pt30-05-2022 00:00:00
Indraprasth Wing CSonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Saket ImperialNirmaan Realty9570,957107-08-2025 00:00:00
Maruti Square Building No 7Maruti Dwellers Private LimitedNew Survey Nos 63 66 And 69 Pt31-12-2027 00:00:00
Paramount FKalpataru Homes Private LimitedSno 115/4/2 Pt 115/5 Pt 115/6 Pt 115/7/2 Pt 115/8/2 Pt 115/10/2 Pt Of Village Majiwade30-09-2024 00:00:00
Orion -3Vijay Suraksha Realty LlpSurvey No 238/9Pt, Survey No 252/3/3Pt, Survey No 252/4/1 30-12-2020 00:00:00
Sai SrushtiJyotirmay Developers55 Hissa No 331-05-2018 00:00:00
Highland Springs B4- E WingSiddhi Real Estate Developers46/18Pt, 47/13Pt31-10-2019 00:00:00
Krishna Vihar Co-Operative Housing Society LimitedBal Ganapati Laabh DevelopersCts Nos 20/7 And 33A T No 1630-12-2021 00:00:00
Yashanand Chsl Ojass ConstructionsOjass ConstructionsCts No. 4030-03-2022 00:00:00
Nirman SignatureShree Sha DevelopersSuevey No.180 Hissa No.3/231-03-2026 00:00:00
Hcs HorizonHcs Realtors LlpOld Survey No 271 New Survey No 82 Hissa No 1131-12-2026 00:00:00
Maplewoods Phase 1M/S Bks Galaxy Realtors Llp51(2) 56 And 57(2)31-12-2028 00:00:00
Rukmani ResidencyClay Nest Developers42130831-12-2027 00:00:00
Shree Chintamani Co Op Hsg Soc LtdShree Ganesh Construction400602, Thane, Kumbharwada Shivaji Path31-03-2024 00:00:00
Laxmi ArcadeSatish Kashinath Gujarathi36231-12-2024 00:00:00
Orion - Northern LightsJaykali Developers Private LimitedS No 509 And 510 P30-03-2025 00:00:00
Omega - Northern LightsJaykali Developers Private LimitedS No 509 And 510 P30-03-2025 00:00:00
Royal EmpireSai Pooja ConstructionsS No 184 H No 2A30-12-2024 00:00:00
Dosti West County - Dosti Nest - Phase 2Dosti Enterprises25/7(Pt) 25/9(Pt) 25/10A(Pt) 44/1(Pt) 43/1(Pt)30-06-2027 00:00:00
Umiya Nakshatra HeightsM/S. Jigar EnterpriseS No/H No 64/2 And 64/1/431-12-2027 00:00:00
Guru SakshatSadguru EnterprisesPlot No 3 Gut No 46/3 H No 4 And 530-12-2025 00:00:00
Poddar Wondercity Phase - ViPoddar Housing And Development Limited42150330-06-2024 00:00:00
Poddar Wondercity Phase - IiPoddar Housing And Development Limited42150330-06-2022 00:00:00
Poddar Wondercity Phase - IPoddar Housing And Development LimitedS No 29 H No 230-09-2023 00:00:00
Poddar Wondercity Phase - IiiPoddar Housing And Development Limited42150330-09-2024 00:00:00
Dream SolitaireSatyam Concast Private LimitedPlot No 103 And 11505-12-2018 00:00:00
Raj Tattva Phase Ii Wing C And DKothari Autoparts Manufacturers Pvt Ltd141/1, 2, 3, 144, 145/1, 2, 4, 145/3/1, 146/2, 3, 148/1, 414/2, 146/431-12-2019 00:00:00
SanyogAditya AssociatesCts No. 84, Tika No. 1530-06-2023 00:00:00
Sachinam Co Op Hsg SocietyShreekanth DevelopersS No 4 , H No 18 , Plot No 431-03-2024 00:00:00
Krishna KunjShashank C Mishra HufB K No A-513, Ulhasnagar, 421004, Thane31-12-2023 00:00:00
Poddar Wondercity Phase - IvPoddar Housing And Development LimitedJoveli Village31-07-2023 00:00:00
Poddar Wondercity Phase - VPoddar Housing And Development Limited42150330-06-2024 00:00:00
Newa Bhakti Park B WingNewa Technocity (I) Private LimitedIt 631-12-2027 00:00:00
Skyrise ResidencyNishith Subandhu LuharPlot No 6/Cts No 7469/S No 38/B/630-07-2025 00:00:00
Priyanka ParadisePriyanka Regency LlpPlot 16A Sector 24 Sanpada Navi Mumbai31-12-2024 00:00:00
Project Details
  • Project:
    Poddar Wondercity Phase - Ii
  • Location:
  • 421503
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Poddar Housing And Development Limited
  • Phone:
  • Address:
  • Unit No. 3-5, Poddar Group Building, 126 N M Joshi Marg, Mathuradas Mill Compound, Lower Parel West, 400013
Project RERA Details
MAHA REARA No: P51700020028
Project Type Residential
RERA Project Status New Project
Architect Architect Hafeez Contractor
Funding Bank HDFC BANK LIMITED
Proposed Possession 30 Jun 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Apr 2023
Last Retrived 28 Jul 2025
Poddar Wondercity Phase - Ii QR Code
Poddar Wondercity Phase - Ii
MahaRERA - P51700020028
Apartment Details & Configuration
TypeArea
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Poddar Wondercity Phase - Iilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Yet Commenced
Club House - Mini Cinema Theater, Library, Banquet / Multipurpose Town Hall, Gymnasium
Part Of Entire Project
Club House Indoor Games - Table Tennis, Chess & Carom Room, Pool, Cards, Health Club
Part Of Entire Project
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Yet Commenced
Energy management
Not Yet Commenced
Fire Protection And Fire Safety Requirements
Not Yet Commenced
Kids Play Area
Part Of Entire Project
Landscaping & Tree Planting
Not Yet Commenced
Mini Football Ground, Cricket Pitches, Tennis, Volleyball and Basketball Court / Multi Purpose Court
Part Of Entire Project
Neighbourhood Retail, Giant Jenga Play Area, Giant Chess Play Area, Outdoor games tables with boards
Part Of Entire Project
Open Air Gymnasium, Jogging/Walking Track, Picnic Area/Event Space & Arena/Activity Deck/Park
Part Of Entire Project
Open Parking
Not Yet Commenced
Organic farm Patch / Horticulture, Petting Zoo, Barbeque Area, Skating Rink, Café
Part Of Entire Project
Senior Citizens Corner, Dominos Tables, Dart Board, Yoga Corner/Room/Aerobic Room/Meditation Area
Part Of Entire Project
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Commenced
Solid Waste Management And Disposal
Not Yet Commenced
Storm Water Drains
Not Yet Commenced
Street Lighting
Not Yet Commenced
Swimming Pool Adult and Kids
Part Of Entire Project
Treatment And Disposal Of Sewage And Sullage Water
Not Yet Commenced
Water Conservation, Rain water Harvesting
Not Yet Commenced
Water Supply
Not Yet Commenced
Buildings / Wings in Poddar Wondercity Phase - Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Poddar Wondercity Phase - Ii by Poddar Housing And Development Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

16082 Sq. ft.

Project Area

8913 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

540 apartments in total
Total
540
Booked
107
Available
433

Saleable Area Statistics (Sq. ft.)

164089 Total
Total
164089
Booked
32514
Available
131575
Total 540 apartments in project. 107 apartments booked. 19% apartments booked.
Total 164089 Sq.ft. saleable area. 32514 saleable area booked.
20% area booked.

B4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B4Dec 202124101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )180
36 Booked20% Booked
20% Booked
180 total apartments / 36 apartments booked. 20% apartments booked.
Work Description in Building B4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress43% done
43% Booked

B5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B5Dec 202124101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )180
44 Booked24% Booked
24% Booked
180 total apartments / 44 apartments booked. 24% apartments booked.
Work Description in Building B5Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked

B6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B6Dec 202124101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )180
180 total apartments / 27 apartments booked. 15% apartments booked.
Work Description in Building B6Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress44% done
44% Booked
Channel Partners
Channel Partners Registered by Developer
Poddar Housing And Development Limited
for Project
Poddar Wondercity Phase - Ii
last updated on 28 Jul 2025 as per information obtained from MARA RERA.