Project overview

Poddar Wondercity Phase - I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020032. Poddar Wondercity Phase - I is located at S No 29 H No 2. This is a New being developed by Poddar Housing And Development Limited.

Poddar Wondercity Phase - I has ONE BHK S Apartments with carpet areas ranging from 304 to 304 Sq.ft. Carpet. The Project has total 459 of which 459 are currently available for sale.

Poddar Wondercity Phase - I is being developed on a total land area of 16082 Sq.ft. out of which 9411 Sq.ft. i.e 59% is reserved for recreational purposes. Poddar Wondercity Phase - I has 3 Wings / Towers B1,B2,B3

ProjectDeveloperLocationPossession
The EmpressUnique Shanti Developers LlpOld S.No.479/230-03-2023 00:00:00
Lotus ParkReal Enterprise842-A, Plot No. 02,0330-12-2022 00:00:00
Paramount BKalpataru Homes Private LimitedS.No. 114/8-Part,114/4-Part30-06-2025 00:00:00
Rental Building A-1 R2Sonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Raviraj ApartmentRajendra GhorpadeS.No 85,H. No 11, Plot No 930-12-2022 00:00:00
Krupa SindhuAshish Waman GoleS No 48 H No 8/428-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesTika No 16 Cts No 7830-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyS No 29/A H No 19 Plot No 8730-09-2019 00:00:00
Mauli MadhusudhanRameshwar Patil42160530-03-2023 00:00:00
Salangpur NirmanSalangpur Nirman252 6,7 Part30-12-2022 00:00:00
Golden Hills B- 3Vihang Enterprises921,923,9241,9243,928130-12-2024 00:00:00
Classic ResidencyClassic ConstructionThane30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersSurvey No. 28 H.No 530-03-2026 00:00:00
Payal PrideMit Enterprises10430-03-2022 00:00:00
Panvelkar Estate - GreenfordPanvelkar Infrastructures Private LimitedSurvey No. 42 Hissa No 2 And 330-12-2022 00:00:00
Plot 1 Sector 10 GhansoliCidco Of Maharashtra Ltd.Plot No 130-06-2021 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdSurvey No 77 1A 2 4 501-12-2021 00:00:00
Silver ArcadeSiddhivinayak Enterprises5831-12-2018 00:00:00
Orion Business ParkNeminath EnterprisesGut No 33 Pt31-03-2019 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private Limited1411, 2, 3, 144, 1451, 2, 4, 1462, 3, 4, 1481, 1421, 1483130-12-2023 00:00:00
Highland Springs B4- A WingSiddhi Real Estate Developers74/5Apart30-06-2023 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.50602-10-2026 00:00:00
Teri KudratVishnu Jethanand BadlaniPlot No 433, Sheet No 48, Cts No 2578331-10-2024 00:00:00
Kanha ResidencyKulkarnii Builder105A/4/2/3/4/5/4114-05-2025 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private Limited67/2/P, 67/3A, Sub Plot B30-12-2023 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedGut No 42/131-12-2018 00:00:00
Jai MatadeeAaradhana Developers37531-03-2018 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai31-12-2025 00:00:00
Suyog ApartmentTelange Builders & Developers Private Limited4693 To 469930-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction7015A/1A30-06-2023 00:00:00
One Indiabulls Thane - 1Tapir Constructions Limited71/1/A/1/1, 71/229-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/430-12-2021 00:00:00
Cosmos Horizon Phase IiConcorde Developers192/2A30-03-2024 00:00:00
Simone ResidencyM R M DevelopersDaighar Village30-12-2022 00:00:00
Delta WoodsDelta Venture1883Pt30-09-2023 00:00:00
NandigramYogesh Kishor MahajanTikka No 5, 62A/131-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNew S. No./Old S. No./ H.No. 221/564/1,3,4A,4B,8. New S. No/Old S. No/ H.No/220/565/1,4,6,7,8,9,10. New S. No/Old S. No/H.No/267/567/1,2/1. New S. No/Old S. No/245/579/1A,1B,2,3A,3B,3C,4,5,6,731-12-2027 00:00:00
Shivsai ParadiseBharat Agri Fert & Realty Realty Ltd112/2A,3,4,5/1,5/2,5/330-12-2028 00:00:00
RubaShreyas Enterprises112/5/430-09-2020 00:00:00
OrchidMehta RealtorsS No 378/131-03-2019 00:00:00
Trinity MokshRattanraj LifespacesS No 64 1 And 64 231-03-2025 00:00:00
Ganesh BhuvanMagnum Homes66830-09-2024 00:00:00
Audumber Flower ValleyAudumber SuperstructuresS No 5/4/D 5/4/B 5/23/B30-06-2025 00:00:00
Spm Dream City Phase 1D K BuildconS No 52 H No 4/531-12-2028 00:00:00
Paramount CKalpataru Homes Private LimitedSno 115/5Pt 115/9Pt 115/12Pt,115/13Pt Of Village Majiwade 212/1Pt Of Village Balkum30-06-2025 00:00:00
My City Phase Ii Cluster 5 Part IiHorizon Projects Pvt Ltd108/1 And 93 Part31-12-2027 00:00:00
Paramount EKalpataru Homes Private LimitedS.No. 115/10/2-Part And 115/8/2-Part Of Village Majiwada30-06-2025 00:00:00
Madhu VillaShree Krishna EnterprisesSurvey No. 18 / House No. 2230-12-2022 00:00:00
Shapoorji Pallonji The Impulse- Phase 1Jaykali Developers Private LimitedS. No.509, 510P30-06-2024 00:00:00
Ten X Era Raymond Realty Tower CRaymond Limited121 Pt 83/3 83/130-01-2029 00:00:00
Guru Ganesh ChsVadnere Builder & DevelopersSurvey No 13 Hissa No 6(A) Plot No 2631-12-2025 00:00:00
Mangeshi NeptuneMangesh GaikarThane31-12-2027 00:00:00
Seven Eleven CourtyardS.S.S AssoicatesThane30-11-2025 00:00:00
Shivanjali HeightsShivanjali ConstructionSurvey No 73, 74, 75, 7630-06-2022 00:00:00
Highland Park Building 2- K25 Wing A Phase 2Siddhi Gaurav EnterprisesS. N. 87/2 And 82/630-12-2024 00:00:00
Falco CheshireAanya RealtorsThane, 42110231-10-2016 00:00:00
Highland Springs B4- C WingSiddhi Real Estate Developers74/5A 59/1A 59/1B 46/1830-12-2023 00:00:00
Sarthi ElanzaSarthi DevelopersS No-264/58 Plot No-5531-10-2023 00:00:00
Bsc It ParkBansal Steel CorporationA21601-06-2024 00:00:00
Runwal Lands EndRunwal Construction Private Limited20/3 Part30-06-2029 00:00:00
Kashi Darshan B WingVarad Raj Construction98/1920-12-2023 00:00:00
Saroj Sadan Chs LtdShrusti DevelopersThane19-01-2026 00:00:00
Narang Privado - BNarang Realty Private Limited146/5/B And 146/6/B/131-03-2028 00:00:00
Shalimar Co.Op Hsg Soc LtdNeena Shailesh Paranjape1548, 1549 , 155030-04-2024 00:00:00
Arihant City Phase-Ii - N BuildingArihant Enterprises49/1P,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P30-06-2026 00:00:00
Shree Moreshwar Chs LtdAjay Sanjay MohorikarS No 33 H No. 6/15 Cts No 897331-12-2024 00:00:00
Swami Narendra ResidencyRaj Ratneshwari Developers274/1-B31-12-2026 00:00:00
Shapoorji Pallonji Skyraa At Northern LightsJaykali Developers Private Limited509 And 510/A31-12-2027 00:00:00
Krishna - B WingNeelkanth Palm Realty149/4/1 Pt, 412/2 Pt30-05-2022 00:00:00
Indraprasth Wing CSonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Project Details
  • Project:
    Poddar Wondercity Phase - I
  • Location:
  • S No 29 H No 2
  • Const. Stage:
    New
  • Possession:
    30 Sep 2023
Developer Details

  • Developer:
    Poddar Housing And Development Limited
  • Phone:
  • Address:
  • Poddar Group Building
Project RERA Details
MAHA REARA No: P51700020032
Project Type Residential / Group Housing
RERA Project Status New
Architect Architect Hafeez Contractor
Funding Bank HDFC BANK
Proposed Possession 30 Sep 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 19 Mar 2019
Last Retrived 26 Jul 2025
Poddar Wondercity Phase - I QR Code
Poddar Wondercity Phase - I
MahaRERA - P51700020032
Apartment Details & Configuration
TypeArea
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Poddar Wondercity Phase - Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Yet Commenced
Club House - Mini Cinema Theater, Library, Banquet / Multipurpose Town Hall, Gymnasium.
Part Of Entire Project
Club House Indoor Games - Table Tennis, Chess & Carom Room, Pool, Cards, Health Club
Part Of Entire Project
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Yet Commenced
Energy management
Not Yet Commenced
Fire Protection And Fire Safety Requirements
Not Yet Commenced
Kids Play Area
Part Of Entire Project
Landscaping & Tree Planting
Not Yet Commenced
Mini Football Ground, Cricket Pitches, Tennis, Volleyball and Basketball Court / Multi Purpose Court
Part Of Entire Project
Neighbourhood Retail, Giant Jenga Play Area, Giant Chess Play Area, Outdoor games tables with boards
Part Of Entire Project
Open Air Gymnasium, Jogging/Walking Track, Picnic Area/Event Space & Arena/Activity Deck/Park
Part Of Entire Project
Open Parking
Not Yet Commenced
Organic farm Patch / Horticulture, Petting Zoo, Barbeque Area, Skating Rink, Café
Part Of Entire Project
Senior Citizens Corner, Dominos Tables, Dart Board, Yoga Corner/Room/Aerobic Room/Meditation Area
Part Of Entire Project
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Commenced
Solid Waste Management And Disposal
Not Yet Commenced
Storm Water Drains
Not Yet Commenced
Street Lighting
Not Yet Commenced
Swimming Pool Adult and Kids
Part Of Entire Project
Treatment And Disposal Of Sewage And Sullage Water
Not Yet Commenced
Water Conservation, Rain water Harvesting
Not Yet Commenced
Water Supply
Not Yet Commenced
Buildings / Wings in Poddar Wondercity Phase - I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Poddar Wondercity Phase - I by Poddar Housing And Development Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

16082 Sq. ft.

Project Area

9411 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

459 apartments in total
Total
459
Booked
0
Available
459

Saleable Area Statistics (Sq. ft.)

139475 Total
Total
139475
Booked
0
Available
139475
Total 459 apartments in project. 0 apartments booked. 0% apartments booked.
Total 139475 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

B1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B1Sep 202220101010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )153
None Booked0% Booked
0% Booked
153 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B1Completion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B2Sep 202220101010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )153
None Booked0% Booked
0% Booked
153 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B2Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B3Sep 202220101010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )153
None Booked0% Booked
0% Booked
153 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B3Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Poddar Housing And Development Limited
for Project
Poddar Wondercity Phase - I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.