Project overview

Plot No 68 Sector 12 Dronagiri is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000017368. Plot No 68 Sector 12 Dronagiri is located at Plot No 68. This is a Ongoing being developed by City And Industrial Developement Corporation Of Maharashtra Ltd.

Plot No 68 Sector 12 Dronagiri has LIG Apartments with carpet areas ranging from 321 to 321 Sq.ft. Carpet. The Project has total 720 of which 367 are currently available for sale.

Plot No 68 Sector 12 Dronagiri is being developed on a total land area of 158994 Sq.ft. out of which 24703 Sq.ft. i.e 16% is reserved for recreational purposes. Plot No 68 Sector 12 Dronagiri has 9 Wings / Towers E -1 Phase -Ii,E-2 Phase - I,E-3, Phase - I,L-1, Phase - I,L-2, Phase - I,L-3 Phase - Ii,L-4 Phase - Ii,L-5 Phase - I,L-6 Phase - Ii

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Plot No 68 Sector 12 Dronagiri
  • Location:
  • Plot No 68
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2021
Developer Details

  • Developer:
    City And Industrial Developement Corporation Of Maharashtra Ltd
  • Phone:
  • Address:
  • Nirmal Building
Project RERA Details
MAHA REARA No: P52000017368
Project Type Others
RERA Project Status Ongoing
Architect Shri Shrikant Dinakar Khadilkar Chief Architect
Funding Bank AXIS BANK
Proposed Possession 31 Mar 2021
Revised Possession 31 Mar 2021
Extended Possession 30 Sep 2022
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Plot No 68 Sector 12 Dronagiri QR Code
Plot No 68 Sector 12 Dronagiri
MahaRERA - P52000017368
Apartment Details & Configuration
TypeArea
EWS25.81 Sq.mts. ( 278 Sq.ft. )
LIG29.82 Sq.mts. ( 321 Sq.ft. )
SHOP S1 AND S629.09 Sq.mts. ( 313 Sq.ft. )
SHOP S2 AND S542.1 Sq.mts. ( 453 Sq.ft. )
SHOP S3 AND S435.7 Sq.mts. ( 384 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Plot No 68 Sector 12 Dronagirilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Started Yet
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started Yet
Energy management
Work Not Started Yet
Fire Protection And Fire Safety Requirements
Work Not Started Yet
Landscaping & Tree Planting
Work Not Started Yet
Open Parking
Work Not Started Yet
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started Yet
Solid Waste Management And Disposal
Work Not Started Yet
Storm Water Drains
Work Not Started Yet
Street Lighting
Work Not Started Yet
Treatment And Disposal Of Sewage And Sullage Water
Work Not Started Yet
Water Conservation, Rain water Harvesting
Work Not Started Yet
Water Supply
Work Not Started Yet
Buildings / Wings in Plot No 68 Sector 12 Dronagiri
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Plot No 68 Sector 12 Dronagiri by City And Industrial Developement Corporation Of Maharashtra Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

158994 Sq. ft.

Project Area

24703 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

720 apartments in total
Total
720
Booked
353
Available
367

Saleable Area Statistics (Sq. ft.)

220722 Total
Total
220722
Booked
107091
Available
113630
Total 720 apartments in project. 353 apartments booked. 49% apartments booked.
Total 220722 Sq.ft. saleable area. 107091 saleable area booked.
49% area booked.

E -1 Phase -Ii

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E -1 Phase -IiDec 2020151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
EWS25.81 Sq.mts. ( 278 Sq.ft. )78
45 Booked57% Booked
57% Booked
78 total apartments / 45 apartments booked. 57% apartments booked.
Work Description in Building E -1 Phase -IiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

E-2 Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-2 Phase - IOct 2020151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
EWS25.81 Sq.mts. ( 278 Sq.ft. )90
52 Booked57% Booked
57% Booked
90 total apartments / 52 apartments booked. 57% apartments booked.
Work Description in Building E-2 Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

E-3, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-3, Phase - IOct 2020151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
EWS25.81 Sq.mts. ( 278 Sq.ft. )90
47 Booked52% Booked
52% Booked
90 total apartments / 47 apartments booked. 52% apartments booked.
Work Description in Building E-3, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-1, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-1, Phase - IOct 2020141000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )78
31 Booked39% Booked
39% Booked
SHOP S1 AND S629.09 Sq.mts. ( 313 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP S2 AND S542.1 Sq.mts. ( 453 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP S3 AND S435.7 Sq.mts. ( 384 Sq.ft. )2
None Booked0% Booked
0% Booked
84 total apartments / 31 apartments booked. 36% apartments booked.
Work Description in Building L-1, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-2, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-2, Phase - IOct 2020141000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )78
36 Booked46% Booked
46% Booked
SHOP S1 AND S629.09 Sq.mts. ( 313 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP S2 AND S542.1 Sq.mts. ( 453 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP S3 AND S435.7 Sq.mts. ( 384 Sq.ft. )2
None Booked0% Booked
0% Booked
84 total apartments / 36 apartments booked. 42% apartments booked.
Work Description in Building L-2, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-3 Phase - Ii

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-3 Phase - IiDec 2020131000190
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )78
42 Booked53% Booked
53% Booked
78 total apartments / 42 apartments booked. 53% apartments booked.
Work Description in Building L-3 Phase - IiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-4 Phase - Ii

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-4 Phase - IiDec 2020131000190
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )72
38 Booked52% Booked
52% Booked
72 total apartments / 38 apartments booked. 52% apartments booked.
Work Description in Building L-4 Phase - IiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-5 Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-5 Phase - IOct 2020131000190
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )72
26 Booked36% Booked
36% Booked
72 total apartments / 26 apartments booked. 36% apartments booked.
Work Description in Building L-5 Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-6 Phase - Ii

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-6 Phase - IiDec 2020131000190
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )72
36 Booked50% Booked
50% Booked
72 total apartments / 36 apartments booked. 50% apartments booked.
Work Description in Building L-6 Phase - IiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
City And Industrial Developement Corporation Of Maharashtra Ltd
for Project
Plot No 68 Sector 12 Dronagiri
last updated on 28 Jul 2025 as per information obtained from MARA RERA.