Project overview

Plot No 63 Sector 12 Dronagiri is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000017365. Plot No 63 Sector 12 Dronagiri is located at Plot No 63. This is a New being developed by City And Industrial Developement Corporation Of Maharashtra Ltd.

Plot No 63 Sector 12 Dronagiri has LIG Apartments with carpet areas ranging from 321 to 321 Sq.ft. Carpet. The Project has total 750 of which 329 are currently available for sale.

Plot No 63 Sector 12 Dronagiri is being developed on a total land area of 166380 Sq.ft. out of which 26558 Sq.ft. i.e 16% is reserved for recreational purposes. Plot No 63 Sector 12 Dronagiri has 9 Wings / Towers E-1, Phase - I,E-2, Phase - Ii,E-3, Phase - I,L-1, Phase-Ii,L-2, Phase - I,L-3, Phase - I,L-4, Phase - I,L-5, Phase - I,L-6, Phase - I

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Plot No 63 Sector 12 Dronagiri
  • Location:
  • Plot No 63
  • Const. Stage:
    New
  • Possession:
    31 Dec 2020
Developer Details

  • Developer:
    City And Industrial Developement Corporation Of Maharashtra Ltd
  • Phone:
  • Address:
  • Nirmal Building
Project RERA Details
MAHA REARA No: P52000017365
Project Type Others
RERA Project Status New
Architect Shri Shrikant Dinakar Khadilkar Chief Architect
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2020
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Plot No 63 Sector 12 Dronagiri QR Code
Plot No 63 Sector 12 Dronagiri
MahaRERA - P52000017365
Apartment Details & Configuration
TypeArea
EWS25.81 Sq.mts. ( 278 Sq.ft. )
LIG29.82 Sq.mts. ( 321 Sq.ft. )
SHOP S1 AND S629.09 Sq.mts. ( 313 Sq.ft. )
SHOP S2 AND S542.1 Sq.mts. ( 453 Sq.ft. )
SHOP S3 AND S435.7 Sq.mts. ( 384 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Plot No 63 Sector 12 Dronagirilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Started Yet
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started Yet
Energy management
Work Not Started Yet
Fire Protection And Fire Safety Requirements
Work Not Started Yet
Landscaping & Tree Planting
Work Not Started Yet
Open Parking
Work Not Started Yet
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started Yet
Solid Waste Management And Disposal
Work Not Started Yet
Storm Water Drains
Work Not Started Yet
Street Lighting
Work Not Started Yet
Treatment And Disposal Of Sewage And Sullage Water
Work Not Started Yet
Water Conservation, Rain water Harvesting
Work Not Started Yet
Water Supply
Work Not Started Yet
Buildings / Wings in Plot No 63 Sector 12 Dronagiri
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Plot No 63 Sector 12 Dronagiri by City And Industrial Developement Corporation Of Maharashtra Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

166380 Sq. ft.

Project Area

26558 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

750 apartments in total
Total
750
Booked
421
Available
329

Saleable Area Statistics (Sq. ft.)

230092 Total
Total
230092
Booked
127364
Available
102728
Total 750 apartments in project. 421 apartments booked. 56% apartments booked.
Total 230092 Sq.ft. saleable area. 127364 saleable area booked.
55% area booked.

E-1, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-1, Phase - IOct 2020151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
EWS25.81 Sq.mts. ( 278 Sq.ft. )84
59 Booked70% Booked
70% Booked
84 total apartments / 59 apartments booked. 70% apartments booked.
Work Description in Building E-1, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

E-2, Phase - Ii

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-2, Phase - IiDec 2020151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
EWS25.81 Sq.mts. ( 278 Sq.ft. )90
58 Booked64% Booked
64% Booked
90 total apartments / 58 apartments booked. 64% apartments booked.
Work Description in Building E-2, Phase - IiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

E-3, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-3, Phase - IOct 2020151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
EWS25.81 Sq.mts. ( 278 Sq.ft. )90
63 Booked70% Booked
70% Booked
90 total apartments / 63 apartments booked. 70% apartments booked.
Work Description in Building E-3, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-1, Phase-Ii

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-1, Phase-IiDec 2020141000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )78
43 Booked55% Booked
55% Booked
SHOP S1 AND S629.09 Sq.mts. ( 313 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP S2 AND S542.1 Sq.mts. ( 453 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP S3 AND S435.7 Sq.mts. ( 384 Sq.ft. )2
None Booked0% Booked
0% Booked
84 total apartments / 43 apartments booked. 51% apartments booked.
Work Description in Building L-1, Phase-IiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-2, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-2, Phase - IOct 2020141000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )78
40 Booked51% Booked
51% Booked
SHOP S1 AND S629.09 Sq.mts. ( 313 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP S2 AND S542.1 Sq.mts. ( 453 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP S3 AND S435.7 Sq.mts. ( 384 Sq.ft. )2
None Booked0% Booked
0% Booked
84 total apartments / 40 apartments booked. 47% apartments booked.
Work Description in Building L-2, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-3, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-3, Phase - IOct 2020141000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )84
45 Booked53% Booked
53% Booked
84 total apartments / 45 apartments booked. 53% apartments booked.
Work Description in Building L-3, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-4, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-4, Phase - IOct 2020151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )78
42 Booked53% Booked
53% Booked
78 total apartments / 42 apartments booked. 53% apartments booked.
Work Description in Building L-4, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-5, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-5, Phase - IOct 2020141000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )78
40 Booked51% Booked
51% Booked
78 total apartments / 40 apartments booked. 51% apartments booked.
Work Description in Building L-5, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

L-6, Phase - I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
L-6, Phase - IOct 2020141000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LIG29.82 Sq.mts. ( 321 Sq.ft. )78
31 Booked39% Booked
39% Booked
78 total apartments / 31 apartments booked. 39% apartments booked.
Work Description in Building L-6, Phase - ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
City And Industrial Developement Corporation Of Maharashtra Ltd
for Project
Plot No 63 Sector 12 Dronagiri
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation