Project overview

Plot No -2 Sector -6 Bamandongri is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000028209. Plot No -2 Sector -6 Bamandongri is located at Plot No -2. This is a New being developed by City And Industrial Development Corporation Of Maharashtra Limited.

Plot No -2 Sector -6 Bamandongri has 1 BHK Apartments with carpet areas ranging from 292 to 296 Sq.ft. Carpet. The Project has total 5403 of which 5403 are currently available for sale.

Plot No -2 Sector -6 Bamandongri is being developed on a total land area of 1185012 Sq.ft. out of which 179784 Sq.ft. i.e 15% is reserved for recreational purposes. Plot No -2 Sector -6 Bamandongri has 44 Wings / Towers Commercial,E-A-01,E-A-02,E-A-03,E-A-04,E-A-05,E-A-06,E-A-07,E-A-09,E-A-10,E-A-11,E-A-12,E-A-13,E-A-14,E-A-15,E-A-16,E-A-17,E-A-18,E-A-19,E-A-20,E-A-21,E-A-22,E-A-23,E-A-24,E-A-25,E-A-26,E-A-27,E-A-28,E-A-29,E-A-30,E-A-31,E-A-32,E-A-33,E-A-34,E-A-35,E-A-36,E-A-37,E-A-38,E-A-39,E-A-40,E-A-41,E-A-42,E-A-43,E-A-8

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Olivia PrimeSkyline Buildpro43/2B/3/230-06-2022 00:00:00
Rai S AaragyaRai Residency Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Shreyas SapphireVinod Premjibhai TrapasiaPlot No- 1D-2 Sector-3A Karanjade Panvel Navi Mumbai31-03-2025 00:00:00
Upper Thane-Mlcp C ShopsMacrotech Developers Limited60/2 Part,60/1 Part31-12-2024 00:00:00
Innovative Infocom And It ParksInnovative Infocom & It Parks Private LimitedPlot No. Gen 71/1 And Gen 71/1/126-11-2027 00:00:00
Prem Ratna PlazaAditi Home MakerSurvey No 84 Hissa No 331-12-2027 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Rai S VrundavanRai Residency Private LimitedSurvey No 64 Hissa No 230-12-2023 00:00:00
Takshila ResidencyDelux AssociatesS No 157/13Pt S No 158/1Pt Plot No 1 And 230-12-2023 00:00:00
Om RamchandraLaxmi DevelopersGaothan Chalata No 109 House No 38030-11-2020 00:00:00
Mukund VishnuShree Swami Samartha AssociatesTika No 12 Cst No 103A 2A 103A 2B Village Pachpakhadi30-12-2021 00:00:00
Anjani SparshGeeta Space Realtors249-2, 249-730-12-2020 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Arnav Wing DPrashant Raghunath PatilGut No 55 Hissa No 131-12-2027 00:00:00
Smit VistaSmit Megastructures(Old) Survey No. 242/17, 18,, ( New) Survey No. 33/17, 1831-12-2029 00:00:00
Ram Smruti Chs LtdSai Prakash Builders And DevelopersPlot No 139 Cts No 392531-12-2026 00:00:00
Kamdhenu CrownKamdhenu GreenPlot No-6+7, Sector-19, Sanpada31-12-2029 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Sajan Shantaram HeightTirupati DevelopersNew Survey No.1 Hissa No 1130-06-2021 00:00:00
Ram JanakiShree Ganesh Enterprises4947 To 495230-12-2026 00:00:00
Apple ParadiseApple ParadiseU No 99,100, Plot No 262 Part01-01-2019 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Belvedere IMacrotech Developers Limited25/2A Part 25/2B Part31-07-2028 00:00:00
Jay Meghdoot ChslS R DevelopersS.No.46/H.No.6/A/13,Plot No.2731-12-2025 00:00:00
Foresta EMacrotech Developers Limited53/1(Part), 53/2(Part), 53/3(Part)31-08-2028 00:00:00
Paras Apartment Co-Op. Housing Society LtdShiv Infra1314, Village Kohoj-Khuntvali02-06-2027 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Kapleshwara ResidencyKapleshwara Homes Llp119/6C (Old), 84/6C (New)31-12-2029 00:00:00
Sara TowerHope Builders And Developers233 And 23431-12-2026 00:00:00
Vedang Lake CityVedang ConstructionS. No. 4 H. No. 2/1 And S. No. 12 H. No 1/331-12-2025 00:00:00
Mavis Tower A Wing From 5Th Floor To 7Th FloorM/S. Unit Arsen Developers (Joint Venture)431C Part31-12-2019 00:00:00
Infinite ResidencyMistry Construction Co. Pvt. Ltd.Pocket D And E30-06-2029 00:00:00
Mansipooja HeightS K InfrastructureSurvey No 3 Hissa No 630-03-2023 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
Unique Estate - IiUnique Shanti RealtorsOld S.No. 400 New S.No. 58 Hissa No. 2 And 330-06-2028 00:00:00
Musica ApartmentE I ConstructionCts No. 36 B/1, Tikka No.8 Sector 2 Congested31-12-2026 00:00:00
Royal VillasAdarsh EnterprisesCts No 3535, Plot No 7, Final Plot No 7 Mauje Bhiwandi31-12-2025 00:00:00
Sky ViewShreeji IconSurvey No 115, Hiisa No 6(P)30-11-2028 00:00:00
Mohan Nano Estates IiiMohan Lifespaces Llp24/1,24/2P,24/6P,24/8,24/9,25/1,25/231-12-2019 00:00:00
Crystal HeightsNirala Construction424B, 425, 416B, 421/1 To 3, 421, 417/1 To 430-12-2021 00:00:00
Silver SpringAnudan Properties Private LimitedF. P.4330-12-2022 00:00:00
Shree Shambhav DarshanSwastik Enterprises2071 To 2075 Of Village Ghatkopar - Kirol30-12-2021 00:00:00
Project Details
  • Project:
    Plot No -2 Sector -6 Bamandongri
  • Location:
  • Plot No -2
  • Const. Stage:
    New
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    City And Industrial Development Corporation Of Maharashtra Limited
  • Phone:
  • Address:
  • Nirmal Building
Project RERA Details
MAHA REARA No: P52000028209
Project Type Others
RERA Project Status New
Architect Architect Hafeez Contractor
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Feb 2021
Last Retrived 28 Jul 2025
Plot No -2 Sector -6 Bamandongri QR Code
Plot No -2 Sector -6 Bamandongri
MahaRERA - P52000028209
Apartment Details & Configuration
TypeArea
Shop18.5 Sq.mts. ( 199 Sq.ft. )
Shop21.98 Sq.mts. ( 237 Sq.ft. )
Shop29.38 Sq.mts. ( 316 Sq.ft. )
Shop29.9 Sq.mts. ( 322 Sq.ft. )
Shop30.94 Sq.mts. ( 333 Sq.ft. )
Shop31.25 Sq.mts. ( 336 Sq.ft. )
Shop31.35 Sq.mts. ( 337 Sq.ft. )
Shop35.98 Sq.mts. ( 387 Sq.ft. )
Shop36.41 Sq.mts. ( 392 Sq.ft. )
Shop37.87 Sq.mts. ( 408 Sq.ft. )
Shop38.75 Sq.mts. ( 417 Sq.ft. )
Shop38.84 Sq.mts. ( 418 Sq.ft. )
Shop39.11 Sq.mts. ( 421 Sq.ft. )
Shop39.22 Sq.mts. ( 422 Sq.ft. )
Shop39.96 Sq.mts. ( 430 Sq.ft. )
Shop40.04 Sq.mts. ( 431 Sq.ft. )
Shop40.34 Sq.mts. ( 434 Sq.ft. )
Shop40.44 Sq.mts. ( 435 Sq.ft. )
Shop40.58 Sq.mts. ( 437 Sq.ft. )
Shop42.96 Sq.mts. ( 462 Sq.ft. )
Shop48.04 Sq.mts. ( 517 Sq.ft. )
Shop48.61 Sq.mts. ( 523 Sq.ft. )
Shop49.5 Sq.mts. ( 533 Sq.ft. )
Shop49.97 Sq.mts. ( 538 Sq.ft. )
Shop52.38 Sq.mts. ( 564 Sq.ft. )
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )
1 BHK27.1 Sq.mts. ( 292 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Plot No -2 Sector -6 Bamandongrilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
As Per Approved Plan
Electrical Meter Room, Sub-Station, Receiving Station
6 No.S Of Electrical Sub Station To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Norms
Landscaping & Tree Planting
1377 No Of Trees Planted As Per Gdcr
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approved Plan
Solid Waste Management And Disposal
Organic Waste Convertor To Be Provided
Storm Water Drains
As Per Approved Plan
Street Lighting
To Be Provided
Treatment And Disposal Of Sewage And Sullage Water
As Per Approved Plan
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
To Be Provided As Per Cidco Gdcr
Buildings / Wings in Plot No -2 Sector -6 Bamandongri
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Plot No -2 Sector -6 Bamandongri by City And Industrial Development Corporation Of Maharashtra Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

1185012 Sq. ft.

Project Area

179784 Sq. ft.

Recreational Open Space

Total 44

Wings / Towers in Project

Apartments Statistics

5403 apartments in total
Total
5403
Booked
0
Available
5403

Saleable Area Statistics (Sq. ft.)

1581031 Total
Total
1581031
Booked
0
Available
1581031
Total 5403 apartments in project. 0 apartments booked. 0% apartments booked.
Total 1581031 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Commercial

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
CommercialDec 202411000084
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop18.5 Sq.mts. ( 199 Sq.ft. )185
None Booked0% Booked
0% Booked
Shop21.98 Sq.mts. ( 237 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.38 Sq.mts. ( 316 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.9 Sq.mts. ( 322 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop30.94 Sq.mts. ( 333 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop31.25 Sq.mts. ( 336 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop31.35 Sq.mts. ( 337 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop35.98 Sq.mts. ( 387 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop36.41 Sq.mts. ( 392 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop37.87 Sq.mts. ( 408 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.75 Sq.mts. ( 417 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop38.84 Sq.mts. ( 418 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop39.11 Sq.mts. ( 421 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop39.22 Sq.mts. ( 422 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop39.96 Sq.mts. ( 430 Sq.ft. )16
None Booked0% Booked
0% Booked
Shop40.04 Sq.mts. ( 431 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop40.34 Sq.mts. ( 434 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop40.44 Sq.mts. ( 435 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop40.58 Sq.mts. ( 437 Sq.ft. )16
None Booked0% Booked
0% Booked
Shop42.96 Sq.mts. ( 462 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop48.04 Sq.mts. ( 517 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop48.61 Sq.mts. ( 523 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop49.5 Sq.mts. ( 533 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop49.97 Sq.mts. ( 538 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop52.38 Sq.mts. ( 564 Sq.ft. )1
None Booked0% Booked
0% Booked
243 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building CommercialCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress33% done
33% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress90% done
90% Booked

E-A-01

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-01Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-01Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-02

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-02Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-02Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-03

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-03Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-03Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-04

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-04Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-04Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-05

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-05Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-05Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-06

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-06Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-06Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-07

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-07Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-07Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-09

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-09Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.1 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-09Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-10Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-11Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.1 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-11Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-12Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-12Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-13Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-13Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-14Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-14Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-15Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-15Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-16

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-16Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.1 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-16Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-17

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-17Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-17Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-18

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-18Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-18Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-19

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-19Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-19Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-20

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-20Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-20Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-21

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-21Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-21Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-22

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-22Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-22Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-23

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-23Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-23Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-24

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-24Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-24Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-25

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-25Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-25Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-26

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-26Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-26Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-27

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-27Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-27Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-28

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-28Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-28Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-29

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-29Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-29Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-30

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-30Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-30Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-31

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-31Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-31Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-32

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-32Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-32Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-33

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-33Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-33Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-34

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-34Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-34Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-35

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-35Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-35Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-36

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-36Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-36Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-37

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-37Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-37Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-38

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-38Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-38Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-39

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-39Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-39Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-40

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-40Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-40Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-41

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-41Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-41Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-42

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-42Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-42Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-43

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-43Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-43Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

E-A-8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E-A-8Dec 2024161010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.1 Sq.mts. ( 292 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK27.24 Sq.mts. ( 293 Sq.ft. )50
None Booked0% Booked
0% Booked
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )60
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E-A-8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
City And Industrial Development Corporation Of Maharashtra Limited
for Project
Plot No -2 Sector -6 Bamandongri
last updated on 28 Jul 2025 as per information obtained from MARA RERA.