Project overview

Plot 6, Sector 34, Taloja is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000022171. Plot 6, Sector 34, Taloja is located at 6 Sector 34. This is a New being developed by Cidco Of Maharashtra Ltd..

Plot 6, Sector 34, Taloja has 1 BHK Apartments with carpet areas ranging from 319 to 319 Sq.ft. Carpet. The Project has total 2201 of which 2201 are currently available for sale.

Plot 6, Sector 34, Taloja is being developed on a total land area of 400580 Sq.ft. out of which 61199 Sq.ft. i.e 15% is reserved for recreational purposes. Plot 6, Sector 34, Taloja has 14 Wings / Towers Ews 1,Ews 2,Ews 3,Ews 4,Ews 5,Ews 6,Ews 7,Lig 1,Lig 2,Lig 3,Lig 4,Lig 5,Lig 6,Lig 7

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Plot 6, Sector 34, Taloja
  • Location:
  • 6 Sector 34
  • Const. Stage:
    New
  • Possession:
    30 May 2023
Developer Details

  • Developer:
    Cidco Of Maharashtra Ltd.
  • Phone:
  • Address:
  • Nirmal Building
Project RERA Details
MAHA REARA No: P52000022171
Project Type Others
RERA Project Status New
Architect Mr Tushar Prakash Tikhe
Funding Bank AXIS BANK
Proposed Possession 30 May 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 Jul 2023
Last Retrived 28 Jul 2025
Plot 6, Sector 34, Taloja QR Code
Plot 6, Sector 34, Taloja
MahaRERA - P52000022171
Apartment Details & Configuration
TypeArea
1 BHK25.56 Sq.mts. ( 275 Sq.ft. )
1 BHK25.81 Sq.mts. ( 278 Sq.ft. )
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )
Shop32.46 Sq.mts. ( 349 Sq.ft. )
Shop35.15 Sq.mts. ( 378 Sq.ft. )
Shop42.93 Sq.mts. ( 462 Sq.ft. )
1 BHK29.82 Sq.mts. ( 321 Sq.ft. )
Shop35.7 Sq.mts. ( 384 Sq.ft. )
Shop42.1 Sq.mts. ( 453 Sq.ft. )
Shop29.09 Sq.mts. ( 313 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Plot 6, Sector 34, Talojalast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
0
Energy management
0
Fire Protection And Fire Safety Requirements100% completed
95% Complete
0
Landscaping & Tree Planting100% completed
95% Complete
0
Open Parking100% completed
95% Complete
0
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
0
Solid Waste Management And Disposal
0
Storm Water Drains100% completed
95% Complete
0
Street Lighting100% completed
95% Complete
0
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting100% completed
95% Complete
0
Water Supply100% completed
95% Complete
0
Buildings / Wings in Plot 6, Sector 34, Taloja
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Plot 6, Sector 34, Taloja by Cidco Of Maharashtra Ltd.last updated on 28 Jul 2025 as per information obtained from MARA RERA.

400580 Sq. ft.

Project Area

61199 Sq. ft.

Recreational Open Space

Total 14

Wings / Towers in Project

Apartments Statistics

2201 apartments in total
Total
2201
Booked
0
Available
2201

Saleable Area Statistics (Sq. ft.)

671915 Total
Total
671915
Booked
0
Available
671915
Total 2201 apartments in project. 0 apartments booked. 0% apartments booked.
Total 671915 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Ews 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ews 1May 2022151000290
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.56 Sq.mts. ( 275 Sq.ft. )119
None Booked0% Booked
0% Booked
119 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ews 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Ews 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ews 2May 2022151000290
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.56 Sq.mts. ( 275 Sq.ft. )119
None Booked0% Booked
0% Booked
119 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ews 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Ews 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ews 3May 2022151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.81 Sq.mts. ( 278 Sq.ft. )90
None Booked0% Booked
0% Booked
90 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ews 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Ews 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ews 4May 2022151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.81 Sq.mts. ( 278 Sq.ft. )90
None Booked0% Booked
0% Booked
90 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ews 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Ews 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ews 5May 2022151000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.81 Sq.mts. ( 278 Sq.ft. )90
None Booked0% Booked
0% Booked
90 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ews 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Ews 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ews 6May 2022151000290
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.56 Sq.mts. ( 275 Sq.ft. )119
None Booked0% Booked
0% Booked
119 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ews 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Ews 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ews 7May 2022151000290
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.56 Sq.mts. ( 275 Sq.ft. )119
None Booked0% Booked
0% Booked
119 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ews 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Lig 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lig 1May 2022221000650
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )245
None Booked0% Booked
0% Booked
Shop32.46 Sq.mts. ( 349 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop35.15 Sq.mts. ( 378 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop42.93 Sq.mts. ( 462 Sq.ft. )2
None Booked0% Booked
0% Booked
255 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lig 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Lig 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lig 2May 2022221000650
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )245
None Booked0% Booked
0% Booked
Shop32.46 Sq.mts. ( 349 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop35.15 Sq.mts. ( 378 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop42.93 Sq.mts. ( 462 Sq.ft. )2
None Booked0% Booked
0% Booked
255 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lig 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Lig 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lig 3May 2022151000230
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.82 Sq.mts. ( 321 Sq.ft. )84
None Booked0% Booked
0% Booked
Shop35.7 Sq.mts. ( 384 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop42.1 Sq.mts. ( 453 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop29.09 Sq.mts. ( 313 Sq.ft. )2
None Booked0% Booked
0% Booked
90 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lig 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Lig 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lig 4May 2022151000230
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.82 Sq.mts. ( 321 Sq.ft. )84
None Booked0% Booked
0% Booked
Shop35.7 Sq.mts. ( 384 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop42.1 Sq.mts. ( 453 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop29.09 Sq.mts. ( 313 Sq.ft. )2
None Booked0% Booked
0% Booked
90 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lig 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Lig 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lig 5May 2022221000630
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )255
None Booked0% Booked
0% Booked
255 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lig 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Lig 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lig 6May 2022221000630
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )255
None Booked0% Booked
0% Booked
255 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lig 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Lig 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lig 7May 2022221000630
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )255
None Booked0% Booked
0% Booked
255 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Lig 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Cidco Of Maharashtra Ltd.
for Project
Plot 6, Sector 34, Taloja
last updated on 28 Jul 2025 as per information obtained from MARA RERA.