Project overview

Platinum Heritage is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700005172. Platinum Heritage is located at 136/1, 137/6, 137/11. This is a Ongoing being developed by Darshan Sagar Developers.

Platinum Heritage has 1.5 BHK TYPE 1, 1.5 BHK TYPE 2, 2 BHK TYPE 1, 2 BHK TYPE 2, 2 BHK TYPE 3, 2.5 BHK TYPE 1, SHOP 1, SHOP 10, SHOP 11, SHOP 12, SHOP 12A, SHOP 13, SHOP 14, SHOP 15, SHOP 16, SHOP 17, SHOP 18, SHOP 2, SHOP 3, SHOP 4, SHOP 5, SHOP 6, SHOP 7, SHOP 7A, SHOP 8 & SHOP 9 Apartments with carpet areas ranging from 163 to 673 Sq.ft. Carpet. The Project has total 245 of which 108 are currently available for sale.

Platinum Heritage is being developed on a total land area of 94376 Sq.ft. out of which 14163 Sq.ft. i.e 15% is reserved for recreational purposes. Platinum Heritage has 2 Wings / Towers Eden Castle,Rock Castle

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Platinum Heritage
  • Location:
  • 136/1, 137/6, 137/11
  • Const. Stage:
    Ongoing
  • Possession:
    31 May 2018
Developer Details

  • Developer:
    Darshan Sagar Developers
  • Phone:
  • Address:
  • Soham House
Project RERA Details
MAHA REARA No: P51700005172
Project Type Others
RERA Project Status Ongoing
Architect Ten Folds Architects & Consultants
Funding Bank TJSB SAHAKARI BANK LTD
Proposed Possession 31 May 2018
Revised Possession 31 May 2018
Extended Possession 31 May 2019
Litigations No Litigations
Last Modified 25 Jun 2018
Last Retrived 26 Jul 2025
Platinum Heritage QR Code
Platinum Heritage
MahaRERA - P51700005172
Apartment Details & Configuration
TypeArea
1 RK TERRACE TYPE 136.36 Sq.mts. ( 391 Sq.ft. )
1 RK TYPE 120.63 Sq.mts. ( 222 Sq.ft. )
1 RK TYPE 223.37 Sq.mts. ( 252 Sq.ft. )
1.5 BHK TYPE 244.8 Sq.mts. ( 482 Sq.ft. )
1.5 BHK TYPE144.79 Sq.mts. ( 482 Sq.ft. )
2 BHK TYPE 154.5 Sq.mts. ( 587 Sq.ft. )
2 BHK TYPE 254.85 Sq.mts. ( 590 Sq.ft. )
2 BHK TYPE 354.98 Sq.mts. ( 592 Sq.ft. )
2 BHK TYPE 454.99 Sq.mts. ( 592 Sq.ft. )
2 BHK TYPE 555.05 Sq.mts. ( 593 Sq.ft. )
2.5 BHK TYPE 162.51 Sq.mts. ( 673 Sq.ft. )
2.5 BHK TYPE 262.53 Sq.mts. ( 673 Sq.ft. )
2.5 BHK TYPE 362.97 Sq.mts. ( 678 Sq.ft. )
1.5 BHK TYPE 250.74 Sq.mts. ( 546 Sq.ft. )
2 BHK TYPE 154.48 Sq.mts. ( 586 Sq.ft. )
2 BHK TYPE 254.87 Sq.mts. ( 591 Sq.ft. )
2 BHK TYPE 362.04 Sq.mts. ( 668 Sq.ft. )
SHOP 127.45 Sq.mts. ( 295 Sq.ft. )
SHOP 1027.7 Sq.mts. ( 298 Sq.ft. )
SHOP 1128.9 Sq.mts. ( 311 Sq.ft. )
SHOP 1215.11 Sq.mts. ( 163 Sq.ft. )
SHOP 12A22.15 Sq.mts. ( 238 Sq.ft. )
SHOP 1324.14 Sq.mts. ( 260 Sq.ft. )
SHOP 1422.85 Sq.mts. ( 246 Sq.ft. )
SHOP 1526.05 Sq.mts. ( 280 Sq.ft. )
SHOP 1626.06 Sq.mts. ( 281 Sq.ft. )
SHOP 1723.7 Sq.mts. ( 255 Sq.ft. )
SHOP 1823.64 Sq.mts. ( 254 Sq.ft. )
SHOP 227.57 Sq.mts. ( 297 Sq.ft. )
SHOP 326.73 Sq.mts. ( 288 Sq.ft. )
SHOP 425.37 Sq.mts. ( 273 Sq.ft. )
SHOP 523.49 Sq.mts. ( 253 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Platinum Heritagelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Done Prior To Oc
Community Buildings10% completed
10% Complete
Will Be Done Prior To Oc
Electrical Meter Room, Sub-Station, Receiving Station60% completed
60% Complete
Will Be Done Prior To Oc
Energy management50% completed
50% Complete
Solar Water Heater
Fire Protection And Fire Safety Requirements50% completed
50% Complete
As Noc From Cfo Thane
Landscaping & Tree Planting
Will Be Done Prior To Oc
Open Parking50% completed
50% Complete
Will Be Done Prior To Oc
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Stp Will Be Completed Prior To Oc
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
Will Be Done Prior To Oc
Street Lighting50% completed
50% Complete
Will Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting80% completed
80% Complete
Will Be Done Prior To Oc
Water Supply50% completed
50% Complete
Will Be Done Prior To Oc
Buildings / Wings in Platinum Heritage
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Platinum Heritage by Darshan Sagar Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

94376 Sq. ft.

Project Area

14163 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

245 apartments in total
Total
245
Booked
137
Available
108

Saleable Area Statistics (Sq. ft.)

136088 Total
Total
136088
Booked
76241
Available
59846
Total 245 apartments in project. 137 apartments booked. 55% apartments booked.
Total 136088 Sq.ft. saleable area. 76241 saleable area booked.
56% area booked.

Eden Castle

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Eden CastleJan 19001510104860
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK TERRACE TYPE 136.36 Sq.mts. ( 391 Sq.ft. )1
None Booked0% Booked
0% Booked
1 RK TYPE 120.63 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
1 RK TYPE 223.37 Sq.mts. ( 252 Sq.ft. )1
None Booked0% Booked
0% Booked
1.5 BHK TYPE 244.8 Sq.mts. ( 482 Sq.ft. )4
None Booked0% Booked
0% Booked
1.5 BHK TYPE 344.8 Sq.mts. ( 482 Sq.ft. )14
10 Booked71% Booked
71% Booked
1.5 BHK TYPE144.79 Sq.mts. ( 482 Sq.ft. )8
7 Booked87% Booked
87% Booked
2 BHK TYPE 154.5 Sq.mts. ( 587 Sq.ft. )28
12 Booked42% Booked
42% Booked
2 BHK TYPE 254.85 Sq.mts. ( 590 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK TYPE 354.98 Sq.mts. ( 592 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK TYPE 454.99 Sq.mts. ( 592 Sq.ft. )10
3 Booked30% Booked
30% Booked
2 BHK TYPE 555.05 Sq.mts. ( 593 Sq.ft. )9
2 Booked22% Booked
22% Booked
2.5 BHK TYPE 162.51 Sq.mts. ( 673 Sq.ft. )26
22 Booked84% Booked
84% Booked
2.5 BHK TYPE 262.53 Sq.mts. ( 673 Sq.ft. )1
None Booked0% Booked
0% Booked
2.5 BHK TYPE 362.97 Sq.mts. ( 678 Sq.ft. )1
None Booked0% Booked
0% Booked
113 total apartments / 56 apartments booked. 49% apartments booked.
Work Description in Building Eden CastleCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress64% done
64% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rock Castle

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rock CastleJan 19001510109928
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK TYPE 144.79 Sq.mts. ( 482 Sq.ft. )26
1.5 BHK TYPE 250.74 Sq.mts. ( 546 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK TYPE 154.48 Sq.mts. ( 586 Sq.ft. )26
11 Booked42% Booked
42% Booked
2 BHK TYPE 254.87 Sq.mts. ( 591 Sq.ft. )28
21 Booked75% Booked
75% Booked
2 BHK TYPE 362.04 Sq.mts. ( 668 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK TYPE 162.51 Sq.mts. ( 673 Sq.ft. )28
27 Booked96% Booked
96% Booked
SHOP 127.45 Sq.mts. ( 295 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1027.7 Sq.mts. ( 298 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1128.9 Sq.mts. ( 311 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1215.11 Sq.mts. ( 163 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 12A22.15 Sq.mts. ( 238 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1324.14 Sq.mts. ( 260 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1422.85 Sq.mts. ( 246 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1526.05 Sq.mts. ( 280 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1626.06 Sq.mts. ( 281 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1723.7 Sq.mts. ( 255 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 1823.64 Sq.mts. ( 254 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 227.57 Sq.mts. ( 297 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 326.73 Sq.mts. ( 288 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 425.37 Sq.mts. ( 273 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 523.49 Sq.mts. ( 253 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 623.49 Sq.mts. ( 253 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 722.15 Sq.mts. ( 238 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 7A15.11 Sq.mts. ( 163 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 828.9 Sq.mts. ( 311 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 927.7 Sq.mts. ( 298 Sq.ft. )1
1 Booked100% Booked
100% Booked
132 total apartments / 81 apartments booked. 61% apartments booked.
Work Description in Building Rock CastleCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Darshan Sagar Developers
for Project
Platinum Heritage
last updated on 26 Jul 2025 as per information obtained from MARA RERA.